Public Inquiry 2026

Day Twenty Five

There Has to Be Direct Answers — Blasting and Explosives Take Centre Stage

Commissioner McKeary referred to nighttime blasting at 5.30am in Dalradian’s application, whereas Dalradian had verbally said it would be 7am.

Mr Fegan, Barrister for FODC, said that in  BS 6472 daytime begins at 8am and he would prefer blasting not to begin till 8am.

Mr Beattie, Barrister for Dalradian Gold, said he would reflect on whether it should be 7am or 8am.  He said that yesterday he had said that daytime blasts were seeking to be 6mm/s. That was in DfI & FODC SoC  app. 2, pdf. P6 of 9 – 6mm/s –   95% of all blasts over 6 months with none exceeding 10mm/s. P.16-20 of DfI Rebuttal, also SoC FODC App 11, same conditions, p.205-206.

Comm. McKeary asked about the concerns re- over-pressure.

Mr Fegan said there should be a condition that it would not exceed 100.

Mr Beattie suggested 128, that 140 was too high.

Comm. McKeary said there are concerns that the location of the explosives store is too close to populated areas of Greencastle.

Dr Gordon, planning expert for Dalradian Gold, said the explosives store at the new portal would be the identical size of the existing one. It would have capacity for  8,000 kg of explosives but he expected it would be licensed for 2000kg. He also advised that there would also be an above ground explosives store with 2000kg capacity.  He referred to Manufacture & Storage of Explosives Regulation 2016 (NI) as amended.(Camcosy store already has a licence under that Reg.

Dr Gordon said the underground explosives store would be 135m below surface, referencing a drawing in App. B1 of Mine Design Parameter Statement. 2019    p 20 of 26. Between 130 & 110 in elevation P.32

Comm. McKeary asked what size is the exclusion zone?146m was the earlier one. 

Dr Gordon said there are 3 circles marked with some measurements. 

Comm. McParland said that some aren’t. The radius isn’t coming from the centre in the blue one. This one has been licensed?

Comm. McKeary there are no scale measurements. It is not clear. 

Comm. McParland said that she’s a blunt person and would expect a blunt answer. If it’s not there, can you give an honest answer? 

Dr Gordon said they could get a location map. There was some laughter!

Mr Beattie went very red in the face and told the Commissioner that comment wasn’t necessary! (I think it was the reference to honesty!).

Comm. McParland said that they had been directed to different documents that don’t answer the question.  There has to be direct answers to questions asked.

Mr Beattie said that Dr Gordon had explained!

Comm. McParland continued that this referencing to different parts of the ES that don’t answer the question asked should stop. It was the same with the peat. Is the information there? Tell us – yes or no!

Mr Beattie said that there was no express reference to exclusion zone & that the Commissioners had been directed to references to access points and depths. App B9. Depth. P 23 of 71. Fig 5.10 p.30 App. E9 Oct 2020. P.23 of 71. Update 5.10 notes depth. Notes PSNI & H&SE involved. New licence application. Scaled vertical and horizontal distances from magazine to portal. 100 or 130m underground. No issue of an impact.

Comm. McKeary queried  if no impact, why an exclusion zone? 

Dr Gordon said the Regulations require an exclusion zone and the size is presented in the Regulations, depending on where you take measurements from.

Comm. McKeary asked again about the distance from the explosive store to residential properties.

Mr Beattie admitted that there was no specific plan to show it. It was advised that it was 1.5 km from portal to Greencastle and 1.1km from explosives store to dispersed rural houses. 

Comm. McKeary queried had they considered the security situation in N.Ireland.

Mr Wallace, Surface Blasting expert for Dalradian Gold, said PSNI & Explosives dept in Liverpool both work on licensing. HSE will look at safe distances and what is being stored. MSER – Manufacture & Storage of Explosives Reg 2016 contain tables referencing distances. PSNI give advice on what security package is required.

Comm. McKeary said the point of licensing could have been done pre-emptively in ES.

A 3rd party objector (MT) said that the Mines Act 2016 reference should be Manufacture & Storage of Explosives 2006.

Mr Beattie admitted that it is the 2006 legislation, that it was just a mistake saying 2016. He also referenced Carriage of Explosives Reg NI 2010.

The 3rd party objector (MT) said that he and another person had driven into the explosives store at Curraghinalt, that security was lax. He said that Dalradian now plan to store 2 different chemicals on site to manufacture explosives on site. The 2006 legislation states that officers must be on site when blasting is taking place. He said that everything was not adding up in terms of what we’re being told and what is in the documents, noting maximum onsite storage of 2 ton and reference to usage of 2.3 ton per day.

Comm. McKeary asked if there is a gap in information.

The 3rd party objector (MT) said that licensed blasters can do the work for Dalradian but the PSNI must oversee it. He said the 2006 legislation is relevant as Dalradian is going to use a new process in relation to ANBI (Ammonium Nitrate Blasting Intermediate).

Dr Louise Taylor (Save Our Sperrins) remarked that her home has greater security features. She said there is a threat to national security and public health and the PSNI are not equipped to deal with it. She added that in RoI the army is brought in to deal with explosives.

Niall McAleer (SOS) said that the original explosives store is unlawful development and there is a difference between planning permission for 3 years and for 25 years. He also commented on the small scale of the map referenced by Dr Gordon, which was barely legible.

Fidelma O’Kane (SOS)  contradicted Dr Gordon’s assertion that the new explosives store would be far away from Greencastle. She named people whose homes would be close to it, as well as the local primary school and playgroup, church, community centre, football club and playing fields and the actual village of Greencastle with homes along each of the roads radiating from the crossroads.

Another 3rd party objector, Mr Haughey, pointed out that the maximum of 2000 kilos of explosives proposed to be delivered 3 times a week didn’t add up to 8000 kilos. He said the 2006 legislation Sch 1 outlines the type of building and the distances and when you extrapolate the exclusion zone for 2000 kilos, it is 458 m which is much greater than 146, referred to earlier. He asked what are the implications of having two of these close together. He also noted the exclusion zone for 8000kg is 1267m.

Comm. McParland said that although the capacity was 8000 kilos, Dalradian intends to apply for a licence for 2000 kilos.

Mr Haughey said that the applicant wasn’t safeguarding their workers, creating the most dangerous workplace in the country. He also said that during 2014-2016 Dalradian had used 12 tons max of explosives at Curraghinalt.

Another 3rd party objector (ST) referred to a case about a monitoring station not being in an appropriate location…… He said if the explosives store is 130 m underground and Crockanboy Hill is 320m and basin of Owenreagh valley in the mid-point is 95 m above sea level, there would be horizontal pathways. He also referenced a court case where 4mm/s was held to have caused damage to properties. 

A local man, Eddie McCullagh, speaking from the audience, told of the structural cracks which had been caused to his home at 208 Crockanboy Road by Dalradian’s last explosion in 2016 (when they had been taking out the bulk sample).

Ms Mary Brolly, solicitor for SOS, listed the problematic issues, lack of transparency, lack of information, uncertainty of amount and where it would be stored and said this had affected the confidence of the public. She also queried whether Dalradian was intending to store 2000 kilos in the existing explosives store which is in breach of planning permission as well as 2000 kilos in their proposed new explosives store. She also asked does blasting collide, does it harm tranquillity, public enjoyment, wildlife – harm cannot  be denied or ignored. We should preserve the quality of the area, not damage it.

A local woman, Ms Carol Glass, speaking from the audience, spoke from the audience to say from what she had heard from Dr Gordon that the figures don’t make sense and also that a camera and a lock couldn’t keep a man out of the original explosives store, she has no confidence.

Mr Fegan mentioned overlapping regulatory regimes and how you address that. He said the PAC cannot ignore the issues in question and they & DfI have to satisfy themselves that the other regulatory regimes can deal with the issues. In this case the 2006 regulations state the separation distances in Reg 5 Sch 1 which Mr Haughey summarised. The applicant should have been able to say that or if there’s a problem, they need to say so as they’ll not get a licence if they can’t meet the requirements. It is not enough for Dalradian to say another regime is dealing with it under that regime, the PAC needs an answer now about separation distances.

Comm. McKeary said that FODC has 2 concerns about monitoring – how vibration remains within limits and reliance on continuous monitoring – how can these be mitigated/ where are mitigation measures

Mr Beattie said 2006 MSER Reg 9 (h) prevents mixing for immediate use. Sch 1 para 1 vulnerable buildings definition is a building of 4 storeys or more above ground. Exclusion zones – none of them apply as the explosives store is underground. He further added that he was unaware of any issues raised in terms of litigation or claims (for structural damage).

Conditions:

Comm McKeary noted 2 conditions in DfI Mine Rebuttal Statement, one dealing with velocity & air over-pressure and second, dealing with blasting scheme  (Blasting 1 & Blasting 2- Appendix 1 of DfI Rebuttal doc).  DfI SoC conditions MD8 & MD9 also referenced.  Mr Beattie mentioned MD8 & 9 were not carried over. However, Mr Elvin, Barrister for DfI, said they do still stand, referencing the mine design statement and the Mine Development plan.

Third party objector, Mr Pat Haughey, asked to discuss receptors, noting he had identified 7 receptors.

Comm McKeary said we had previously talked about Amenity & House Receptors, noting the Commissioners can change or choose to not cover aspects. Mr Haughey highlighted the huge volume of information overall as well as information on receptors contained with the Applicant’s Transboundary Submission including blasting vibration and noise. Comm. McKeary did not allow him to continue as she had moved on to Conditions.

Fidelma O’Kane (SOS) said the Planning Appeals Commission and the Department for Infrastructure must mandate the following legally binding planning conditions on any potential approval:

1: The maximum allowable ground vibration must be strictly limited to a range of 1.0 mm/s to 2.0 mm/s Peak Particle Velocity (PPV) at any residential property boundary, active agricultural outbuilding, educational facility, or sensitive riverbed location. This shifts the target standard from protecting masonry to protecting the human, youth, livestock, and aquatic nervous system from “intolerable” disruption [BS 7385-2].

2: All underground blasting must be confined strictly to daylight hours, restricted to 09:00 to 17:00 on weekdays, and 09:00 to 13:00 on Saturdays. To explicitly protect developing children from sudden physical startle responses and acute sensory anxiety while learning or at play, no blasting whatsoever shall be permitted during active school hours, outdoor play recesses, or scheduled youth sports and training sessions at local community parks and GAA facilities.

3: A permanent network of seismographs, low-frequency noise meters, and air/water quality monitors must be installed at locations determined by the local council, including permanent monitors on school premises, local community centres, and strategic river tracking stations along the Owenkillew river system. This raw data must be streamed live to an unedited, publicly accessible online dashboard to prevent corporate self-regulation.

4: A legally binding immediate Stop-Work Order must be enacted if vibration, noise, air quality, human rights noise metrics, or riverbed acoustic limits are breached. Mining operations must cease completely until an independent auditor reviews the blast chemistry, charge weights, and ventilation efficiency, certifying that absolute corrections are in place. Comm McKeary intervened to state Conditions cannot be used to enforce Stop Work Notices. Ms O’Kane asked what would happen if limits were exceeded and Comm McKeary said that it would be a matter for DfI.

5: The applicant must fully fund independent, comprehensive pre-blasting structural surveys for all properties, educational facilities, community centres, and ecological baselines for river systems within a designated radius. A multi-million-pound environmental, health, and structural bond said they do still stand must be placed into an independent escrow account managed by the local council to guarantee instant payout for structural repairs, educational disruption remediations, or verified livestock/production losses, removing the legal burden of proof from local citizens.

Ms Mary Brolly, (SOS Solicitor), said that Dr Evans, a retired GP, wished to read out a statement  but the Commissioner said that he couldn’t as she had moved on to Conditions.

Mr Fegan said that Condition 2,  protocol for monitoring: the monitoring data must be made available & information shared at regular intervals. Under Blasting 1, there has to be a restriction on the time needed, that an approximate time is not enough. The Council position would be 8am – 6 pm Monday -Friday at a blasting limit of 6mm/s & 8am -1pm on Saturdays at 6mm/s.  BS 6472 normal working hours for blasting  8am -6pm Monday – Friday and 8am -1pm on Saturday. Exceptional justification required outside these hours & we haven’t seen this. 7-8am the lower threshold of  4.5 mm/sec would apply based on Table 1 of BS 6472. Blasting 1 has to be re-drafted.

A third party objector  (Martin Tracey) noted the monitoring range for blasting should be 2km rather than 1km Greencastle village is just outside the 1 km distance. He suggested ground vibration limit of 3mm/s for 95 % of blasts with an absolute max of 6mm/s at any receptor. Air over – pressure should be strictly controlled suggesting 115dB max limit for 95% of blasts and an absolute max of 120dB for individual blasts. Every blast should be independently monitored. If vibration or air over-pressure is exceeded (eg. Failure of equipment), the Company should stop blasting.

Mr Tracey noted that he understood 3-10mm/s range largely based on cosmetic building damage not amenity, nuisance, sleep, preventing damage rather than preventing loss of amenity.  It is building focused not people focused.  Air over pressure limits don’t guarantee acceptable living conditions for people living nearby.  There is no requirement to reduce blasting if complaints continue – no complaints trigger, no independent review/ verification of the Applicant’s own readings. 

Third Party objector Niall McAleer queried the cumulative effect of blasting – noting he was unable to attend yesterday but understood that the Applicant referred to 2 blasting windows per day with 8 blasts in each, so 16 explosions per day.  When this applied to Blasting 1 and the peak particle velocity limit of 6mm/s applying to 95% of blasts,16 blasts x 365 days = 5,840 blasts per year – with 5% equating to 292 blasts that sit outside this limit, in the 6-10mm/s category.  He contended that in reality this was a very substantial number over a year or indeed over 23 years of proposed mining operations.  He noted that he did not have the expertise to comment on the air over pressure sound limits but wanted to note that 140dB was an extremely high sound level & no way precautionary.

Third Party objector Pat Haugey noted that limits being discussed were per blast threshold rather than per blasting period, which is v.significant.  If levels exceed above levels set, there should be a meaningful penalty, suggesting blasting be suspended for 4 days on this outcome.  Furthermore, should there be a rolling trend figure incorporated into monitoring so increased incidents in non-compliance can be investigated & lessons learned.  Mr Haughey considered the peak particle velocity of 6 mm/sec (Ground vibration caused by blasting operations) to be far too high, particularly in a tranquil AONB.  He considered an air over pressure level of 112dB to be more appropriate.  He questioned how the SAC, ASSI & RAMSAR protections were considered in Blasting 1.  Were watercourses & ecology considered? Peatland considered?

In relation to Blasting 2, Mr Haughey noted back fill stopes and paste back-fill as important factors that need to be considered for all blasting based on blast location and depth, referencing Scottish guidance on specific geology & site specific measurement.  He called for monitoring to be independently designed, installed, calibrated, audited and available online for the public to view as well as the statutory bodies (Planning Authority & NIEA). 

Mr Haughey noted Micro-seismic monitoring not taken into account, highlighting the terms vibration & seismology being interchanged in the DGL documentation where this was not the correct usage or interpretation. He noted that the paste backfill takes 28 days to cure – if blasting occurs nearby, this could cause cracks to form – which with acid rock mine drainage, watering & dewatering could lead to major stability issues underground.  Life of backfill paste 55 years.  Back paste curing process must be monitored – this is fundamental.  A Nitrate + Ammonia + explosives residue management plan is also required; noting that a baseline is needed at the very least – anticipating that this would be discussed further on the water & air topics.

Mr Haughey concluded requesting a 4mm/s PPV rather than the 6mm/s currently proposed in the condition and reiterated the need for an independent body to conduct monitoring and this independently verified, referencing air over monitoring, surface monitoring, backfill curing & integrity monitoring, ground water & pressure monitoring.


DfI Barrister, Mr Elvin noted an erroneous reference in Blasting (2) to Condition 2.1, this should read Blasting (1).  DfI see a lot of force in what FODC (Mr Fegan) has said.  If enforcement is set out in condition, clarity need on ‘1km of site’ reference within Blasting (2).  Is this the blasting area, infrastructure site, overall site boundary.  Commissioner McParland noted she understood this to be 1km outside of the entire site/ red line boundary.  This needs to be clear.

Mr Beattie referred to Applicant’s Rebuttal (Appendix 2, page 4 of 9) on DfI draft condition EHO03 (original contained within DfI SoC page 45 of 335).  Construction Noise & Vibration Management Plan will be considered as it will form part of the Applicant’s CEMP ( Construction Environmental Management Plan) – No objection to proposed condition p.16 V & C work on it expressly excludes Blasting .

Mr Beattie considered Blasting (1) to be a surface level condition.  Serviceable condition that DGL will add into the plan (CEMP). On air over-pressure, the Applicant considers 140dB too high and 128dB instead.  App 2 Applicant’s Rebuttal Statement. P6 conditions EHO66 Mr Beattie noted ‘we think scheme should be separated between construction surface blasting and operational underground blasting (150m below ground).”  Applicant’s Rebuttal Condition mirrors what DfI & Aecom suggest: 6mm/s between 8am and 6pm and 2 mm/s at nighttime between 11pm and 7am and 4.5mm/s at other times 7-8am and 6-11pm. Can see limits in force and times. Dalradian propose operational period condition for single blasting event, consistent with BS6472, weekdays 7am -7.30am absolute blast limit 4.5mm/sec consistent with Table 1; evening blast 5.30-6pm 6mm/sec or 95% of blasts at or below this level as draft condition.

Mr Beattie rejected Mr Mc Aleer’s assertion of 5000+  blasts annually, it is two blasting windows per day, one (am), one (pm) that’s where it locks in, if it goes over 6mm/s in the evening it is one of the 5% of blasts allowed for outside this margin (730 blasting windows annually inferred by this but not stated at this time).  Mr Beattie took instruction from Dr Player on operational days and clarified at weeks PPV would be 4.5mm not 6mm/s as an absolute.

Mr Beattie noted that MD09 (DfI SoC Page 51 of 355) was an important condition in terms of monitoring and remains in place.  Mr Beattie noted DGL would reject any suggestion of a liability fund, this is way beyond the remit of the Planning Authority, clearly don’t accept this.

Dr Player (DGL) referenced the blasting window as 1 event lasting up to 15 seconds, with each borehole (up to 8) containing a specific MIC Charge (Maximum Instantaneous Charge) which would be timed to detonate 8 milli-seconds apart.

Comm McKeary concluded blasting Topic for the day (12:45pm).

Blasting, explosives and the heart of community
Day Twenty Four

A “wasteful” mine that will somehow “get more beneficial to the community”?

The session began with the shocking and unjustified announcement that Cormac McAleer, from SOS, was to remain excluded from the inquiry for the duration of the timetable (another 30 days at this moment in time), with audible gasps of amazement from the audience in the Arts Centre. 
The Commissioners also mentioned that a complaint had been raised about a now-deleted podcast, but noted that as it had been removed no subsequent action was to be taken.
There were raised voices throughout the opening gambit from the Commissioners and a generally aggressive, confrontational attitude displayed, which included threats to turn off microphones and actual requests to do so being made.
Following this, there was a lengthy introduction of participants at the top tables and those wishing to speak, including the local community representatives and statutory consultees from NIEA Conservation Designation & Protection Branch, NIEA Biodiversity and Wildlife Branch, FODC & DCSDC Environmental Health, NIEA Industrial Pollution and Radiochemical Inspectorate & the Public Health Agency.
Commissioner McKeary then began the questions on blasting, asking the applicant (Dalradian) if the types of explosives were noted in theie Environmental Statement (ES)?
Dr. Player, for Dalradian, seemed to have much difficulty in naming the specific explosives, and then in finding the requested references within the ES? Fig.5-10 on (PDF) p.30 of Appendix E9 (2020 version) was referenced, but this it was noted did not answer the question on the specific types of explosive to be used.
Commissioner McKeary pressed on, is the qantity of explosives to be used noted anywhere in the ES, and if so, where?
Appendix B1 of the 2017 submission was the answer – later corrected to the 2019 version of same when the Commissioner explained that the document referenced didn’t match what was being presented from the applicant. Again it was noted that this was nothing to do with the question asked, with terms like “maximum storage capacity” and in Dr. Player’s own words, “generic terms” for the types of explosives being used. Appendix B2 (this time of the 2019 submission), Section 3.4.7 was referenced at this point, noting that “During portal excavation, and at least for the first 150m of development, blasting will be undertaken only during day time hours. For these initial blasts at the portal, blasting mats will be used.” This was contrary to previous detail from the applicant, when claims were made orally that no blasting mats would be used, and was further compounded by the statement that, when differentiating underground and overground operations, it isn’t “treated as underground mining until 190m down”.
At this point it was claimed that the applicant intended to use Ammonium Nitrate Blasting Intermediate (ANBI), as opposed to ANFO (Ammonium Nitrate/Fuel Oil) when destroying the Sperrins.
Commissioner McKeary put it to Dr. Player that the chemical make-up of the explosives is unknown as the applicant doesn’t yet know what type of explosives will be used.
Dr. Player concurred with this, noting that there were no quantities noted in the ES as that detail would be in the mine schedules, and as well as that not having been completed at this time, that detail also changes.
He noted that that portal and the adit are the two access points at present, and that as more access points are created there will be more blasting opportunities. When pressed on the averaged daily blasting on the site, he stated that the plan would be for a total of 16 daily blasts, with 11 development firings and five stope firings every 24 hours.
The change from two blasts daily, to two blasting periods, to 16 explosions daily was queried by Commissioner McKeary, who asked where is that shown in the ES?
Whilst Dr. Player confusingly looked around the applicant’s table, Mr. Beattie, legal counsel for Dalradian, noted also that the published times for the blasting periods, namely 5:30am and 5:30pm, were to be amended, with the 5:30am time to be moved “nearer to 7am”, but with no further detail noted, and this not appearing in any of the paperwork submitted to the inquiry this was something that was claimed could be discussed under conditions.
Dr. Player then returned to proclaim that the blasting will “progressively increase”, and that once the two inclines meet it will increase and run steady at 11 development firings and five stope firings daily.
Mr. Beattie, for Dalradian, said there were six surface blasting sites noted on the maps submitted (App. C20), but that the portal and the “upper east pond” were the two most likely to be proceeded with. Mr. Beattie, at this juncture, also referenced Appendix G1 Part II of the Mine Waste Plan (2020 Documents), specifically pages 55, 77 and 78 – although as these note boreholes hitting groundwater and note the stability as “poor” it was unclear why this was relevant to the question posed by the Commissioner – the feeling at this point from the community was very much that the applicant was attempting to baffle those listening with references and documents to distract from their inability to answer questions directly.
Commissioner McKeary put it to Dalradian that as they can’t define the daily blasting schedule then how can they possibly claim that there will be no noise from the blasts?
Mr. Beattie responded, claiming that this would be because of standard conditions, including distance.
Commissioner McKeary countered, Mr. Keegan (for Dalradian) said that there hadn’t been a research survey carried out, so how can you state with any certainty that there will be no negative noise impacts given there were so many variables and unknowns?
Dr. Player came in at this point, claiming there was no noise underground, only vibrations, and that the weight of the explosives gives the resulting vibrations. He noted that the impact of vibrations tends to decline with distance, although it could have been countered at this stage that other variables – an increased weight of explosives, different type of rock, faultlines, etc. could counter this theory.
We were then directed to Appendix B1 (2019 version this time) with the methods identified in Figures 4-6 (PDF pp.9-11) having been identified within the mine plan which would be used where, we were told. Dr. Player spoke of the importance of the condition of the ‘hanging wall’ and the ‘footwall’, (i.e. the horizontal and base/vertical structure remaining after each blast) as being important factors when blasting. He continued, you will only know what your actual quantity will be when you have the detailed mine schedule available, when the mine is operational. He then stated that this was “noted within the feasibility study” – cue further shock and even some stifled laughter within the audience as the phantom/withdrawn feasibility study made a reappearance at the inquiry (& further warnings from the Commissioners were dished out)!!
Commissioner McKeary continued, querying if there had been any explosive alternatives assessment carried out, and if not, why not?
Mr. Beattie answered that Dalradian’s belief was that ANBI was the “best available commercially” and that no alternatives had been assessed.
Commissioner McKeary continued, stating that FODC have noted both analysis and justification of blasting is absent from the assessments provided, including those blasts proposed outside normal working hours. With blasting locations generalised, including those planned for the side of a hill, with questions over whether the slope had been considered and further queries over the volume of explosives to be used in relation to the volume of rock/ore disturbed, it was put to the applicant whether they agreed with this or not.
Dalradian disagreed.
Commissioner McParland confirmed with the applicant that 11 development blasts (creating tunnels and infrastructure) and 5 stope blasts (production blasting) was the plan?
Dr. Player confirmed that 200-500 tonnes of rock would be dislodged by each blast, with blasting periods planned twice daily, for a total of 16 blasts. These would be fired sequentially he said, “so that receptors don’t feel any vibrations”. It was noted that there was a three day storage capacity (for rock) underground, with Dr. Player flippantly commenting “Mines make much more waste than ore”.
It was noted from the third parties that, mindful of the lack of detail on the components of the explosives we need to employ the precautionary principle, conscious of the health dangers associated with many of the chemicals potentially involved. It was also stated that the Approved Code of Practice of explosives at quarries don’t replace planning permissions, and that the data required isn’t available, evidence-based or site specific so professions from the applicant are essentially meaningless.
Mary Brolly, legal counsel for SOS noted that there was no site-specific calibration, that the data set is too small to be reliable and questioned how any of this demonstrated how vibration changes as the mine matures? No amounts of the constituent parts of explosives have been provided for independent assessment to consider likely impact, and the detrimental potential effects on groundwater, peatland, and local biodiversity. Again the lack of professionalism, with the applicant wishing to change times even at this late stage of the process, was noted and questioned in terms of how the commission seemed to be accepting of this, despite it not appearing in any of the submitted documentation.
Pat Haughey, a third party protector spoke on concerns of neither DfI nor NIEA having any detail on the explosives information, but was cut off by the Commissioners before he could conclude his submission.
Emmet McAleer, for SOS, spoke on the community’s concerns of Human Rights Violations, including the The European Convention on Human Rights (ECHR), and the United Nations Rights of the Child, and how subjecting a community to multi-decade, “intolerable” industrial blasting and unmitigated toxic emissions crosses a critical line from standard planning disputes into actionable breaches of protected human rights. The Human Rights Act 1998, which incorporates the European Convention on Human Rights (ECHR) into domestic law, along with international charters, provides clear grounds for objection:
• Article 8 of the ECHR – Right to Respect for Private and Family Life, and the Home: Extensive jurisprudence from the European Court of Human Rights (ECtHR)—such as López Ostra v. Spain and Fadeyeva v. Russia—establishes that severe environmental pollution, noise, and vibration can directly violate Article 8. The Court rules that even if environmental damage does not seriously endanger health, it can drastically devalue quality of life, disrupt sleep, and hinder individuals from enjoying their home. Dalradian’s intentional use of an early morning (5:30 AM) blasting schedule constitutes a state-sanctioned failure to protect families and children from intrusive industrial interference.
• UN Convention on the Rights of the Child (UNCRC) – Articles 3, 24, and 31: Under international human rights principles governing the protection of minors, the “best interests of the child” must be a primary consideration in all public planning decisions [United Nations General Assembly, 1989]. Article 24 of the UNCRC explicitly guarantees children the right to the highest attainable standard of health, mandating state parties to combat disease and malnutrition through the provision of clean drinking water and the suppression of environmental and air pollution [United Nations General Assembly, 1989]. Furthermore, Article 31 guarantees the right of the child to rest, leisure, and to engage in play and recreational activities appropriate to their age [United Nations General Assembly, 1989]. Forcing heavy industrial blasting, ground-borne vibrations, and toxic air plumes upon child-centric environments directly undermines these fundamental rights.
• The Right to a Clean, Healthy, and Sustainable Environment: The United Nations General Assembly formally declared access to a clean, healthy, and sustainable environment to be a universal human right [United Nations General Assembly]. Grounding an industrial development model on the statistical “allowance” of rogue tremors, dust settling over child-centric spaces, and the degradation of an Area of Outstanding Natural Beauty (AONB) stands in fundamental conflict with this international human rights standard.
Conor Fegan, legal counsel for FODC was then invited to speak, and he referenced Section 6.10 of the The Strategic Planning Policy Statement (SPPS), “Planning authorities should seek all necessary information from applicants in making well informed planning judgements, particularly where the impact of a development proposal on archaeological remains is unclear, or the relative significance of such remains is uncertain. Should an applicant fail to provide a suitable assessment or evaluation on request, the planning authority should adopt a precautionary approach and refuse planning permission.” He continued, this determines what information the decision maker needs at the point of consent, and that there was no allowance to defer detail until consent had been granted. This, he said, is “wrong in law” and wrong in practice, as was the case with the first Casement Park case, with mitigation being left until after planning approval. There was, he said, very respectable legal basis for the matter to be dealt with now, and not be left to some later date, post consent.
He also made reference to Appendix C20, and the lack of detail surrounding the Maximum Instantaneous Charge (MIC), which has never been provided by the applicant in any of their submissions or documentation. That Dalradian themselves acknowledge (PDF p.15) that “it is only through the use of trial blasts at the early stages of the blasting program that accurate construction-related vibrations can be predicted” underlined concerns that the outcomes are unknown and that the precautionary principle should lead to refusal of this request.
When DfI were questioned on the same, Julie Ellison (junior counsel) professed that they were “impartial”.
She claimed that the PSNI had been contacted, but that as they were not a statutory consultee queries on operational concerns about transport, storage, mixture and use of explosives was a matter for the Department of Justice.
Dr. Louise Taylor, for SOS, spoke of how, despite all the red flags, lack of detail and protective designations assigned to the local area, the precautionary principle has been ignored throughout this process, and yet again on this topic. She also queried how the cuckoo, a protected species, was supposed to survive amidst 16 explosions per day for the duration of the proposed life of this toxic endeavour?
A note of concern was read out on behalf of Christopher McCullagh, who was unable to attend the session, but had been informed by those present that the proposed number of daily explosions had now risen to 16. Mr. McCullagh, who is the father of three young children all under the age of 10, acknowledged that he had been led to believe through the planning application that there were to be two blasts per day (which he had objected to at that stage), and that it was never disclosed (until today) that it will, in fact, be eight times as many. He said that this was completely unacceptable as a near-neighbour of the proposed site, and raised a number of questions including that it was his understanding that the policy requires there to be a wash-out of rock for residue of explosives between blasting periods – would that then exacerbate the risk to the water table and local groundwater? Through an FoI he stated that it was his understanding that a PSNI member had been injured at a previous blast in August 2016, and that a total of 11,000 man hours had been allocated to blasting during the exploration phase (max. twice weekly blasts, 2014-2016) – what impact was the proposed increase going to have on the already depleted police service, or in turning the local area into a new police outpost?
Commissioner McKeary questioned how 11 + 5 blasts related to the previously noted two blasts within the application.
Dr. Player claimed it was in fact two blasting windows, that the applicant was seeking, morning and evening firings daily, an average of eight blasts per window and both with a single sequence of 5-15 seconds total duration, and single holes fired eight milliseconds (8ms) apart.
After giving a number of measurements of the massive scale of the proposed mine site, and distances to various homes and sites they term “receptors”, Commissionner McParland noted that she had read in their submission they planned to extend 1400m west, 100m underground, and questioned if further detail on their exploratory tunnels were included in their Environmental Statement?
“I don’t believe so” came the timid response from Mr. Beattie, counsel for Dalradian.
Dr. Player attempted to counter some of the points made by Mr. Fegan for FODC noting that the MIC is recorded as the charge in a single hole, and that Dalradian intended to use 5-7 kilos of explosives per hole here, the weight being dependent of the length of the “drive advance”, and would be based of 8 seconds.
Commissioner McParland further queried the quantity of explosives to be used per face when blasting.
Dr. Player said that an example would be 42 charged holes, using 2-3 tonnes of explosives over 24 hours.
It was claimed that there had been 277 “small, trial blasts”.
Commissioner McKeary queried how is a small, trial blast comparable to a full-scale, operational mine?
Dr. Player claimed that the trial data was supportive of the applicant working on without issue.
Mr. Keegan, for Dalradian, then began rhyming of British Standards (BS), but he was left stumped by Commissioner McKeary’s question asking whether the entirety and detail of the information he had brought forward orally was contained in the ES? He claimed that it was, but when asked where it was noted, and where the preparation locations are, he couldn’t identify specifics.
Mr. Wallace, for Dalradian, was permitted to speak on a point of clarification, noting that what was proposed was not “Nitrate”, but “Nitrite”, (a substance potentially even more dangerous to our water course) and attempted to make some comparisons to quarries, before Dr. Player claimed that each blast window would last half an hour.
Despite having his hand up for some time, on a point of accuracy/clarification, Emmet McAleer (SOS) was not afforded the same courtesy as the Dalradian representatives, and indeed when he questioned this, much to the shock of onlookers, and despite remaining calm and respectful in his tone, he was then given an informal warning by Commissioner McParland. With that completely uncalled for and over-the-top conclusion, the session broke for lunch.
After lunch Commissioner McKeary continued the questions for the applicant, asking if any modelling for detonation gases had been included in their documentation.
Mr. Keegan directed her to the updated Air Quality Impact Assessment (AQIA) Report, TBR6 Appendix 2 Annex 9, which does not actually provide such a break down, instead Table 1 (PDF p.12) relates to ANFO, not the now talked about ANBI, and notes explicitly that the quantity of gases from explosives “depends on the type of explosive to be used”, and this has still not been clarified by the applicant.
Commissioner McKeary continued, asking was there no mass balance of nitrogen products included?
Mr. Beattie responded meekly to say that there was no witness present today to speak on that topic.
Commissioner McKeary then referenced a preference from FODC that potential building damage and human annoyance should be treated separately during any assessment.
Mr. Keegan, for Dalradian, claimed that separtate standards are used for both, but he seemed to be speaking in general terms relating to guidelines, and not necessarily what was included within their ES.
Mr. Fegan queried potential future blasting levels, noting that trial blasting was not done and asking where was the BS6472 information – simply put, it isn’t there.
Dr. Player, for Dalradian, claimed that trial blasting in 2014 for ore drilling (2014-2016) included environmental monitoring to ensure compliance to guidelines.
Again Commissioner McKeary raised the concern, how does a small trial sample reflect a large-scale industrial mine?
Dr. Player said that the applicant would monitor the decline at 50m gaps to provide an insight into vibration drop-off, before he began referencing United States Bureau of Mines (USBM) guidelines.
Once again, Mr. Beattie for Dalradian made a number of attempted comparisons with quarries, including one legal case he had recently worked on.
Commissioner McKeary continued with the line of questioning raised in written submissions, querying the type of rock at the exploratory site as opposed to make-up at the mine extractive site. It was noted that the primary source of drop-off was due to the amount of explosive used, and further stated that there was little evidence proposed that works can be completed within acceptable vibration guidance.
Mr. Keegan then spoke on rock ripping/braking, using a 25 or 30 tonne breaker, which would provide much more localised noise and vibration, but that this method was unlikely to be used during this proposal.
Mr. Fegan, for FODC, countered that this had not been screened out, and that nothing he had read had confirmed that this would be the case. He noted that there was a divergence of view on the substance or suitability of the “trial blasting”, and reiterated that this needs to be completed to an acceptable standard prior to consent being granted. He advised the Commission that they could not rationally grant permission on an unknown condition, and that they can not impose sanctions, uncertain that they can be implemented. He provided the example of noise, and detailed how this could not be done, so it should not be done with other aspects of the same planning application. Picking up on Commissioner McKeary’s line of questioning (about the small trial/full-scale operation) he queried how you could compare the two, and queried whether what was submitted was a suitable, representative sample, noting measurements were provided at 500m, but proposed for 50m “at some future date”. Noting the now increased number of explosions, to 16 blasts daily, he questioned how did that compare to the exploratory phase in 2014, noting there was no analysis anywhere in the ES comparing both? If it can’t be complied with, it is fatal to the scheme and has to be dealt with now.
Referencing BS6472 he identified that Table 1 is only appropriate for three blasts per day, not two blasting windows, over two 15 second periods, totalling 16 explosions. There has been no cumulative assessment to this series of blasting events, and cautioned against the applicant defining the MIC as individual boreholes as opposed to the blast total here. He concluded by reminding the Commission that there was no explanation of the blast events until today, and that there is nothing submitted in written evidence in relation to this in front of them.
Local woman Barbara Ward, who lives on the Gorticashel Road, opposite the Camcosy Road, and can see the Dalradian compound and explosives store from her home from across the valley told the inquiry how, back in 2014, neither she or her family had been told if or when explosives were going to be used by the company. She explained that they live in an old schoolmaster’s house, built in 1904 with outside walls 2ft thick made of solid stone. She said when at home she normally used crutches to get about, as opposed to using her wheelchair, and that the noise of the blasts nearly knocked her off her feet, leaving her to panic if her house was falling down around her. She confirmed that she certainly felt the blasts, the vibrations and heard the noise associated with the exploratory explosions, and concluded with a strong determination that despite having lived here for almost 50 years, in the scenic unspoilt hinterlands of The Sperrins AONB, she, along with the local community, were now having to fight just to protect our way of life. 2014, she noted, is incomparable in size and scale of what is being proposed.
Pat Haughey spoke of the information which had been made available during the course of the day, 2-3 tonnes of explosives to be used daily, 16 different explosions, numerous different sites (up to 11 developmental blasts), and no cumulative impact assessment carried out or requested from the Departments. The impact on flaora and fauna above ground not touched on. No nitrogen assessment – neither for the air or the water – why was no nitrogen management plan completed or provided with the application? With the lack of detail and suitable evidence being provided to the local community (& the commission), he wondered out loud, what is being hidden from us?
Sean Tracey investigated the claims made by Dr. Player in relation to vibration measurements taken on the X/Y/Z axis noting that this was confined to one location, southwest of 45 Camcosy Road, with three fine sensors at that site. He made the comparison with dropping a stone in a puddle, noting the ripple effect caused is not going to necessarily be uniform as it eminates from the source point of disturbance. He also pointed out that 45 Camcosy Road is on the opposite side of the road from site of the blasting carried out, located beyond a dip and with Attagh Burn all impacting on the measurements recorded/reported there. He queried how, as an agricultural yard, there seemed to be no recordings for agricultural machinery for the same site, noting this as most peculiar, and also identified that there were no calibration certificates for the findings reported, as was standard and had been submitted for other readings in the application documentation, confirming that the assessment provided nowhere near the acceptable level of detail required for such an application.
It was also noted by third parties that there would be associated noise and vibrations from 2.4m holes being drilled into hard rock holes, which would be an on-going process given the number of holes required (the one previous example noted by the applicant involved 42 charged holes). Mindful of all this additional blasting, was no additional Further Environmental Information (FEI) required by the Departments? A licence from the HSE is a necessity to mix ANBI explosives on-site, along with local authority (Council) assent – had this been sought/granted?
Mr. Beattie responded by stating that a water balance and Nitrate Assessment were not a requirement, and that in the applicant’s view what had been provided was more than adequate.
Dr. Player then claimed that the MIC was to be based off 8ms blasts, and that blasting at a “receptor” only happened when 1/2 mm/s occurs (half a millimetre per second). He then, quite outlandishly and outrageously professed that, “over time our vibrations will get more beneficial to the community”, which went unchallenged by the Commissioners.
Commissioner McKeary picked up the questioning again, asking was it normal for quarries to blast twice a day, 16 time in total for an indeterminate amount of time?
In response, Mr. Wallace, for Dalradian claimed a “busy” quarry might blast twice a week, a smaller quarry twice every two months – in reality, the average in County Tyrone is every three months. The quarry Mr. Beattie had referenced earlier would be blasting once a week it was claimed.
Mr. McAvoy, for Dalradian, introduced a Mr. Kelly from Tara Mines who spoke of “a different scale of blasting at Tara”, but went on to fantastically claim that despite living 1km from that mine site, and having the area under his home mined out, he had no complaints.
Following this, Commissioner McParland came in to caution the applicant, noting that there was a pattern of new evidence being submitted orally, particularly on this topic, and that she was putting a marker down to Mr. Beattie in relation to this being unacceptable.
Mr. Fegan, for FODC, concurred at this point, noting that third parties were being held to an standard that was ultimately unfair and left them at a disadvantage in terms of new evidence being submitted orally, and no opportunity being provided to digest, research or rebut this new information.
At this stage Commissioner Donaghey raised a question about St. Mary’s Church in Rouskey, for HED, noting previous comments of a visual assessment only at this site, and querying whether they were concerned about any potential impact from blasting and vibration?
Mr. Beattie, for Dalradian, claimed that the HED visual assessment noted no negative impact, and he made reference to Condition MD09 as the underground mine expanded closer to the chapel/graveyard site that the applicant would continue with “trial blasting”. He claimed there was no evidence for any concern, but stated that there was a need for continuous assessment.
Dr. Player maintained that the mine exploration would be 1500/2000m away from the site of the graveyard and chapel, but again Commissioner McParland noted reference to a 1400m tunnel to the west of the mine site, which would bring it much closer to Rouskey village.
Dr. Player confirmed that the work would move from the Portal to the ore body, then move towards Rouskey, but that “monitoring” would be carried out as it advances this direction.
Commissioner Donaghey asked is there an assessment in the ES that can be extrapolated out, or are you making that assumption on what you have heard here today?
Dr. Player then went to speak on the different types of bedding attenuating the impact of the explosions and associated noise and vibrations, before Commissioner Donaghey asked if there was any domestic guidance to follow in relation to this?
Dr. Player spoke further on the USMB documentation, calling it “the universal guidance”.
Meabh Morgan, from HED, said St. Mary’s was half a mile from the extraction site and a quarter of a mile from the exploration site, and that she had reviewed the vibration report. She claimed mitigation and daily monitoring on the vibration effect would be required, but that essentially due to the distance HED weren’t concerned.
At this point Mr. Elvin, for DfI claimed that neighbour notification of the church had been completed, in relation to a question raised at a previous meeting of the inquiry.
The third parties identified that, a recent legal case involving Belfast City Council surrounding a historical building at Hamilton’s Dock, a construction traffic limit of 2.5mm/s had been set, which was higher than the proposal from Dalradian here, and that the St. Mary’s site was also one which would be prone to impact by passing industrial traffic and HGVs should this toxic proposal be approved.
It was pointed out that DfI’s statutory duty is to set down parameters rather than sitting and varying between “no comment” statements, or ones which attempt push the burden of responsibility onto the PAC/WAC Commission.
Again it was noted that the United State’s standard, USMB, is not a “universal” one as claimed, and that the BS versions exists and should be the primary guidance.
The distance of 1.5km to St. Patrick’s Chapel and graveyard was also noted as a concern for local residents.
Fidelma O’Kane, from SOS explained how,as a prominent, historic stone structure, St. Mary’s Catholic Church stands as a highly vulnerable receptor to underground blasting, particularly if undisclosed tunneling, fault line channelling, or atmospheric inversions bring the blast energy directly beneath or against its foundations:
• Structural Fracturing of Large Masonry: Low-frequency ground vibrations from nearby tunnel blasting cause resonant shear stress, leading to structural cracking in heavy stone walls, window arches, and stone lintels.
• Architectural Heritage Degradation: Continuous seismic rattling over months or years can dislodge historic stained-glass window mountings, destabilize decorative internal plasterwork, and compromise vulnerable roofing timbers.
• Differential Foundation Settlement: Sub-surface blasting and associated fault line stress redistribution can cause minor subterranean shifting or compaction of the upper soil layers beneath the church, leading to permanent tilting or structural failure of the heavy stone building walls.
Mary Brolly, legal counsel for SOS, queried had any inspection been carried out of the building? Ought it not to have been, considering it is a very vulnerable site, mindful to of its historic and cultural significance? Was a “visual assessement” sufficient?
She queried the difference again only verbally evidenced during this session, in relation to Nitrates Vs. Nitrites, and further environmental and health concerns raised by this chemical make-up of the explosives proposed to be used in our area.
She also queried the warning process and asked if it could be explained, and if it was noted anywhere within the procedures documentation. It was not noted, she was told, but the procedure is Strike One – informal warning; Strike Two – formal warning; Strike Three – permanent exclusion from the remainder of the inquiry process.
In relation to a comment from Mr. Orbinson, legal counsel for NIE Networks, who claimed a previous speaker for NIE had not referenced tree cutting, Fidelma O’Kane noted that not only had the aforementioned witness mentioned it during her submission to the inquiry, but it was referenced recurringly throughout the RPS documents despite Mr. Orbinson’s protestations to the contrary.
The session concluded with Mr. Fegan, for FODC, being permitted to introduce into evidence two new documents, the Sperrin AONB Managment Plan 2026 – 2036 and Sperrin AONB 5 year Action Plan 2026 – 2031, with no objections from the floor and permission granted by the Commissioners.

The mountain in Autumn
Day Twenty Three

 The morning after the day before…

Happily, Day 23 began with internet access (albeit intermittent initially) for all – a step towards a level playing field after the incredible bias exhibited the day before.

Third party protectors began by noting that the house at 240 Crockanboy Road was not noted on the maps provided by Dalradian, with the resident of 240 Crockanboy Road, Christopher McCullagh, in attendance to highlight this factual error by the applicant. It was also pointed out that, contrary to evidence given by Mr. Keegan, acoustician for Dalradian, at yesterday’s session when he claimed that there were no houses closer than 400m to the mine site, a house is currently being built 300m away from the infrastructure site, 400m away from the toxic waste dump. The owner of the new home (a replacement dwelling and domestic garage), Gerard Hollywood, is a brother of Pearse, whose home was noted during discussion the day before.

Mr. McEvoy, for Dalradian then read a letter from a Gerard Meenan who was supportive of the toxic mine proposal, before Terence Brogan, who appeared in the October 2021 Spotlight programme, ‘Gold Rush: The war in the Sperrins’, read a prepared statement to the inquiry. Despite being asked by Commission McKeary on a number of occasions to keep his comments relevant to the question asked, he stumbled through what had been prepared for him ignoring her request. During the course of his submission he did confirm that he, along with his brothers Sean and Barry were members of the self-proclaimed “Silent Majority” group of Dalradian supporters, whilst also stating that they had ll worked for mining companies since the 1980s, and had “all got jobs with Dalradian”. This was not challenged by legal counsel for the applicant, despite having previously been refuted in the aftermath of a number of incidents involving this individual, including threatening & intimidatory behaviour towards a priest and claims noted within the Spotlight documentary.

Mr. Keegan, for Dalradian, was then given the opportunity to rebut what had been stated by the third party protectors over the course of yesterday afternoon and this morning. He spent some time responding to the issues raised by Niall McAleer, arguing that the worst case scenario for construction would entail a noise level of 47 decibels (dB), that he did not accept that the 2016 baseline was inflated and that an average background measurement was not applicable as “you can’t select a lowest value” and use it. In response to criticisms over no cumulative assessment of overground and underground noise levels he claimed that the worst case scenario included a 90dBA breakout from the vent raise. When questioned on the location of these by the commissioners, they noted that the specific location of these had not been identified on any site maps provided by the applicant. At this point Michael Gordon for Dalradian identified two maps – 2016021-P-CIV-002 and 2016-P-CIV-020 – but at a ratio of 1:10,000 these were hardly sufficient or definitive. He argued against the 30dB World Health Organisation recommendation for an indoor night-time noise limit of an indoor night-time noise limit of 30 dB (A-weighted) for continuous background noise in bedrooms. This threshold prevents sleep disturbance, allowing for deep, restorative sleep, countering that there could be a 15dB attenuation depending if windows were open or closed. When arguing against the 35dB upper limit for the indoor ambient noise level noted in the Department for Education ‘Acoustic design of schools: performance standards’ document (Building bulletin 93, Table 1), he seemed to deliberately miss the point that when school children are sitting quietly listening to their teacher then the ambient noise should be 35dB or lower.
He was, quite rightly, pulled by the Commissioners when he attempted to make comparisons between the application before us and various sand and gravel quarries, as noted this is not and application for a sand and gravel quarry, but for an underground mine and associated processing plant and infrastructure.
He also struggled to explain why there were three different readings given for the Greencastle Community Centre/clubrooms building, displaying a lack of knowledge of the local area and setting being dealt with, and went on to claim that there had been mistakes made when recorded house numbers on maps supplied by Dalradian as part of their proposal, that the address noted as 234 Crockanboy Road is actually number 238, and that noted as 238 should in reality be number 240 – it was again pointed out that if such simple mistakes were making up their application, how many other mistakes were present within the original document and subsequent addenda/resubmitted versions and associated documents. How could the applicant be trusted to run a toxic gold mine and processing plant which would put our health, environment and lives in jeopardy?

At this juncture I felt it important to highlight that although Mr. Keegan had referenced the International Standard ISO 9613-2 – Acoustics, he had conveniently failed to mention Clause 9 of that same document which specifies the accuracy and limitations of the general engineering method for calculating outdoor sound propagation, and explicitly notes that, as part of its Source Restrictions: The standard does not apply to aircraft in flight or blast waves from explosions or mining.
I also pointed out that, the Building Bulletin 93 document Mr. Keegan had attempted to rebut noted, in Table 3a, that contrary to his submission, 45dB was recorded as “High” Activity noise in a classroom, with 50dB being “Very high”.
Finally under the claims made during his input that there were dwellings nearer the mine site than Mr. G Hollywood’s, which had been mentioned earlier this morning, I referenced him back to his oft-quoted TR11 document from Dalradian, which notes at 1.3.8.4 “The closest proposed dwelling to the proposed infrastructure site is LA10/2022/1155/F…This proposed replacement dwelling and domestic garage is…closer to the access road to the proposed infrastructure site than NSR 12.”

When questioned by Commissioner McKeary on whether or not DfI had completed or deemed necessary a Rural Needs Assessment in relation to the adverse noise effects, the reposnse was that a Section 75 assessment is on-going, but not yet complete (which again begs the question, why are we currently in the middle of an inquiry process if this hasn’t concluded?), and that “in the Department’s view a Rural Needs Assessment is not required, but that the Commissioners can recommend that one be completed as part of their findings”, again shirking their responsibilities and putting the burden onto the PAC/WAC Commissioners.

Mary Brolly, legal counsel for SOS then corrected Mr. Beattie, legal counsel for Dalradian, who had refuted her reference to Article 3, mistakenly thinking this was in relation to the ECHR when in fact it related to the The United Nations Convention on the Rights of the Child, which notes variously, “In all actions concerning children…the best interests of the child shall be a primary consideration”, “States Parties undertake to ensure the child such protection and care as is necessary for his or her well-being” and “States Parties shall ensure that the institutions, services and facilities responsible for the care or protection of children shall conform with the standards established by competent authorities, particularly in the areas of safety, health, in the number and suitability of their staff, as well as competent supervision.”

In response to Mr Buroni’s (Dalradian) refusal to acknowledge any health impacts from the noise associated with the mine,  Fidelma O’Kane (SOS) said that the PAC Version 5 of the Timetable had the sub-topic of “Public Health” (in relation to Residential Amenity) listed on 1st July and Save Our Sperrins had invited several experts (including a Consultant and a retired doctor) to speak on that date. However, PAC had issued Version 6 of the Timetable on Monday 15th June with Public Health listed for 29th, 30th June & 1st July. SOS health experts cannot attend for these 3 days but will come on 1st July to discuss health impacts. Commissioner McKeary claimed that this was not the time to be discussing the timetable, but frustrations created by it were noted by the third parties.

At this point, Commissioner Donaghey asked a question in relation to noise created by the application for the power lines associated with the Dalradian proposal, querying whether the “worst case scenario” would exceed 65dB during construction? NIE Networks maintained there would be “no operational noises from the power line”, with Lisa Payne acting as their acoustic specialist and claiming that modelling for Corona noise is solely for a higher voltage and an expression that they were confident their submission was “sufficiently robust”.

This was challenged by Fidelma O’Kane, from SOS, who noted that it was possible for noise to be produced. She stated that high-voltage power lines generate an independent and continuous form of acoustic pollution known as “corona discharge,”, as identified by Ms. Payne, this is a persistent, distinctive sizzling and crackling sound accompanied by a continuous low-frequency 100 hertz (hz) hum generated by the alternating current. Corona noise gets worse during damp, foggy, frosty, or rainy conditions – weather states that are exceptionally common in the Sperrins. Because the background ambient noise in this AONB frequently drops to 20-30decibels (dB) at night, this electrical hum will become a dominant, non-stop auditory disruption that penetrates nearby residential properties.   Normally, trees, tall gorse, and dense bushes surrounding a route help scramble and absorb those high-frequency crackling sounds before they leave the immediate area. By clear-cutting a 10-metre wide strip right under and around the lines, the developer strips away that natural sound insulation. The crackling noise now has a perfectly flat, clear path to bounce off the ground and travel directly towards local homes.

Sound waves travel like ripples in a pond. If they hit soft, porous barriers (like thick heather, dense moss, peat, and trees), the energy is absorbed and the sound dies down. If they hit flat, cleared ground, they bounce and travel much further.  The 10-metre clear-cut path acts as a literal acoustic highway or an empty hallway cutting through the landscape. Existing background sounds—such as passing trucks on local roads, agricultural machinery, and the heavy industrial processing noise from the mine site itself  will now enter this cleared channel. Because the natural “acoustic shield” of vegetation is gone, these other noises will echo along the corridor and sound significantly louder to residents living nearby.

A major flaw in the assessment is that the developer calculated the noise of the power lines as if the countryside would remain exactly as it is today. They completely ignored the fact that the very act of building the lines destroys the natural soundproofing of the landscape, making both the lines and the rest of the area’s activities sound much louder to the community.

Mr. Orbinson, legal counsel for NIE Networks, then appeared to show not only the evident disdain for the local protectors, but an apparent misunderstanding of the entire inquiry process by claiming that it was up to the local community to prove that there would be harm done/noise evident from the proposed power lines, when in fact the burden of proof lies with the applicant (in this case NIE & Dalradian) to prove that no negative impacts would be caused as a result of their toxic proposals, which they had failed to do in any coherent or conclusive manner.

Discussion then moved onto the proposed Conditions relating to noise, with Commissioner McKeary seeking input on these.

Mr. Orbinson claimed that NIE were proposing to amend the Saturday working patterns to finish a few hours early, with a new end time of 1pm (following a 7:30am start).

The third parties noted that they were, as stated at all previous discussions on Conditions, not satisfied with these measures as one they are conditions (without prejudice) being noted in the event permission is granted to this toxic proposal, and that history has demonstrated the little value placed on conditions by both the applicant and the planning authorities as they can easily be ignored, removed and replaced as deemed appropriate.

With that background, Fidelma O’Kane noted that If Dalradian and DfI are genuinely interested in protecting the health and well-being of the local population, the applicant should be legally bound to a number of conditions, including the following:
1. Mandatory BS 4142 Character Corrections: Explicit integration of stacked tonal (+6 dB), impulsive (+9 dB) and intermittent (+3 dB) penalties into all residential receptor models.
2. Strict Adherence to WHO Night Limits: Total noise contributions, from all mining operations combined, must never exceed the World Health Organisation’s recommended absolute ceiling of 40dB at any residential façade.
3. Imposition of Ceilings: Establishing a strict, legally binding limit on maximum instantaneous night-time noise spikes to completely eliminate sleep-shattering acoustic events.
4. Advanced Engineering Mandates: Legal requirements enforcing the installation of multi-stage in-duct silencers on air vents, full acoustic masonry Enclosures for fixed plant infrastructure, and a total ban on pure-tone reversing alarms in favour of “white-noise” broadband alarms.
5. Independent Telemetry & Health Monitoring: The establishment of a continuous independent narrowband sound monitoring network with live, publicly accessible telemetry, alongside an independent, long-term public health study to track community health biomarkers.

Mary Brolly, legal counsel for SOS, added that there should be a clearly identified complaint procedure and a clearly identified monitoring procedure in advance of any works, with clearly stated penalties for any breaches. She also proposed that DfI should have access to all monitoring stations, all complaints and that regular reporting by the applicant should to DfI with independent verification if so requested would also be a requirement. She proposed speed limits for vehicles within the site, amendments to site infrastructure to reduce unnecessary noise and further restrictions on site operation over the weekend.

Sean Tracey, another third party objector proposed that some form of online telemetry be made available to FODC via a web portal, which should also be available to members of the public or any others who wished to access this information – this detail should be live and continuously (& accurately) updated and recorded.
Mr. Tracey said that the location of sensors should be agreed with FODC Environmental Health and incorporate actual, genuine community consultation.
He also noted that the complaints process should not solely be the remit of the applicant, given previous expressed concerns about them, but should be addressed also to DfI, whilst also being communicated to local council, Public Health and the general public.
He concluded by stating that a new baseline study should be conducted, cautioning against erroneous detail on any outdated/non-independent submissions and stressing concurring with other representations that a new, independent survey is required.

Conor Fegan, legal counsel for FODC recalled that, as noted by Commissioner McParland the previous day, the wall/bund which had been referenced by the applicant was not noted on any drawings, and this was a cause for concern to the Council and the local community.
He also submitted the request that, given the overlap of issues discussed, and the cumulative impact noted by both the Commissioners and those making written and oral submissions, that an over-arching mitigation plan, with conditions reflective of the overall environmental statement might be considered by the Commission at a future date.

As the Commissioners moved to draw proceedings to a close, Mary Brolly made an impassioned and rational application for the re-admission of Cormac McAleer, one of the founding members of Save Our Sperrins, who had quite controversially been ejected from proceedings the day before, and subsequently excluded from the remainder of the “public” inquiry. Despite initially being advised that this request would have to be made in writing to the Chief Commissioner, she noted that, given proportionality the Commissioners had their own discretion to amend their decision. She noted that the context of events was particularly important, citing the reluctance of admission of third party expert evidence, coupled with the third parties not having any wifi access for in excess of three hours, an issue which did not seem to be reflected across the room by any other participants. Under the realms of fairness and proportionality she advised the Commissioners that they could not justify Mr. McAleer’s complete exclusion for the duration of the inquiry. She called on Commissioners McParland, McKeary and Donaghey to be mindful of Mr. McAleer’s age, his 40+ years working within communities opposing toxic extractivism, and his 15+ years working with our community in opposition to the toxic plans brought before us by Dalradian, noting too that there was no evident procedural gain from his continued exclusion.
Mrs. Brolly called on the Commissioners to set aside, or vary, their ruling to exclude and to re-admit Mr. McAleer to the inquiry, explaining that his continued exclusion risks disadvantaging the third parties, particularly as he is viewed as a very important and well informed third party participant.

After taking a brief moment to consider this request off stage, behind a curtain, the Commissioners returned to advise that an answer to Mrs. Brolly’s application would be given on the morning of the next date of the inquiry (29th June at 10am), and with that, the session was closed.

Community woven together
Day Twenty Two

Equality for All Except Third Parties

At the outset of proceedings it became clear that the Public WiFi was not working which was disadvantaging all third-party participants – as they could not access the relevant documents under discussion.  Dalradian, their consultants, DfI,  and FODC did not have an issue with Mr Beattie noting – they had online access, ‘but it was our own WiFi’. 

Third parties noted this was a significant barrier to participation and asked that the proceedings be adjourned for the problem to be resolved, this request was rejected by the Commissioners as in their view questions were limited to a few documents and would be directed to the Applicant (DGL) and FODC – & hopefully the issue would soon be resolved.

Commissioner McKeary led the questioning, with the first discussion on the baseline noise information contained within the 2017 ES, why would the baseline be considered invalid?  FODC have raised queries on this, whilst noting that the information is now 9 years old, Commissioner McKeary understood that FODC’s issues were with the analysis & interpretation of the data, rather than the data itself.  Out-dated data could lead to an inappropriate noise level being set as acceptable for the project.

Mr Beattie noted that Mr Keegan (DGL’s acoustician) would summarise their evidence & note reference points within written submissions, rather than re-cover ground.  Mr Keegan began by stating there was relatively little change in the area in the 8-9 year period, so the Applicant’s noise assessment remained accurate – no other ‘industry of significance’ had commenced in the area.  Mr Keegan noted the baseline survey was carried out in 2016, and would assess the worst case scenario – in terms of the level of quiet in the area due to the lack of industry.  He noted a further baseline survey was conducted in  2024, although this was not a like for like comparison – it was a daytime & night time ‘snapshot’ at 3 of the 5 points surveyed in 2016.  Mr Keegan noted daytime figures were in the 30dB (decibel) bracket.  In 2016, 33dB average daytime noise level, 32dB average evening level & nighttime 22dB.  In 2024, average daytime noise level 38dB and night 32dB. 

DGL SoC TR 11 Noise referenced Section 1.3.4  Baseline monitoring analysis methodology (Page 13), alongside Appendix B Pages 69-72 of this PDF. Regrettably internet facilities were still unavailable to third parties so they could not cross-reference this in real time.

Commissioner McKeary queried how does the baseline take into account Curraghinalt noise? Mr Keegan directed the Commissioner to Figure 1 in TR11 which set out the position of monitoring locations for noise, wind & rainfall suggesting that the location used on the Camcosy Road was some distance away from the original infrastructure site, and due to this exploration activities & blasting would not have impacted on the baseline study.  Mr Keegan referenced distances from the now unlawful existing infrastructure site to NML (Noise Monitoring Locations) as: NML1  (Pollan Rua Cottage) 2.7km, NML 2 3.3km, NML3 2.2km, NML4 0.4km and NML5 4.6km.  Third party participants raised hands to query this & highlight the inability to cross-reference claims in real-time due to the absence of Public WiFi, but were not permitted to speak.  These noise monitoring locations are referenced in Table 5 in TR11 & marked on a map in Figure 1, however separation distances quoted do not all appear noted.  

Commissioner McKeary wanted to move on to methodology/ statistical analysis of baseline data.  Querying data analysed using wind farm guidance or slight modification of this; and inclusion of PPC component (Pollution Prevention & Control 2016).  Mr Keegan (DGL) noted the PPC element related to carbon leaching & electro-winning which had since been removed from the scheme so removed this requirement.  It was the applicant’s view that this small section of project would have had to be licensed separately by APRI (NIEA) if it had been retained.  He noted wind speed will affect background noise levels, so applicant wished to capture this in baseline, asserting the wind farm methodology used was relevant to this site.  Mr Keegan added that BS 4142, a method for assessing industrial noise impact, did not set an absolute way of analysing background noise data – an average or median figure could be used for example.  He then referenced a meeting with FODC representatives in early 2016 where it was agreed that an increase in wind speed did increase the background noise baseline in the study area.

 

Mr Fegan (FODC Counsel) noted that there was a disagreement between the parties on what was agreed at this 2016 meeting.  He added that how the data was analysed/ used to set a typical noise level for the rest of the assessment & setting noise limits were the areas of concern for the council.  Mr Skinner, FODC’s acoustic expert, was then invited to speak.  Mr Skinner noted one must first assume that the period where measurements are being taken is typical of conditions and that for a lot of that time sound levels were below the level selected by the Applicant as the baseline.  If artificially high background noises levels are selected, this gives the developer more scope for noise from their operations.  Mr Skinner accepted that whilst there is no set way for analysing data, FODC’s concern was that a lot of the time the background noise level appears lower than the level selected for assessment.  Mr Skinner highlighted an example from the Original ES (2017) – Appendix C18 – Noise Impact Assessment (Part 3) – Graph 1B Page10, which looked at sound pressure levels at NML 1 Pollan Rua Cottage, noting at an average windspeed of 3metres per second, the noise limit applied to this 45dB – 10dB (allowance therefore 35dB) however graph shows a cluster of readings below 30dB, noting this was not an isolated instance of on interpretation of information and there was a strong argument that a baseline lower than 45dB would be applicable.

 

Mr Keegan (DGL) noted that Page 9 of BS 4142 (section 8.1 General) in using background sound levels for assessing industrial settings, the objective is not simply to ascertain the lowest sound level but rather to quantify what is typical for particular time periods.  Mr Keegan noted background noise increases with increasing wind speed (average wind speed set as 3m/s, figure reflective of levels observed at DGL monitoring stations and Lough Fea weather station nearby).  His view was nothing was discounted, everything was considered and from the data, a representative value selected. Wind speeds below 3m/s not explicitly excluded, approach considered noise levels we have measured over typical period and on the basis of those measurements, decide what a typical value is.

Mr Skinner (FODC) noted that rather than focusing on a best fit line as suggested by the Applicant for 3m/s, the graphical analysis of findings shows clustering of data points in surveys below the value selected.  Mr Skinner acknowledged that this interpretation was clearer in some graphs more than other.  He did note however, if we were to check what is the most common background noise level, we would end up with a different figure than that put forward & he would expect this to be lower than the selected value.  Mr Keegan (DGL) noted that the best fit line as referenced by Mr Skinner was a statistically calculated average.

 

Commissioner McKeary asked a follow-up question on impact of windspeeds on measured levels.

Mr Keegan noted that noise levels, rainfall and wind speeds were all measured during sychronised periods to establish a reliable background noise baseline. We have not taken into account wind speed values over 5m/s. 

 

Mr Skinner disagreed, noting that data gathered on windspeeds above 5metres per second will have influenced things and forms part of graphical analysis (& setting of red line).  All data points including those at high windspeeds used.  Effects on wind speeds greater than this can impact on microphone recording this, so this data can be unreliable.  Without access to the raw data, which is not provided in the Environment Statement (ES), (only form we have it in is these graphs) – additional analysis to confirm findings or otherwise, cannot be carried out.  Mr Beattie (DGL) noted that this was an enormous amount of data, monitoring data confidential and nobody asked to see this – as a defence for this omission.

 

Mr Keegan noted that BS 4142 (British Standard used to assess the impact of industrial and commercial noise on nearby residential areas – 2019) was superseded by PPC Guidelines (Pollution Prevention and Control (Industrial Emissions) Regulations, NI 2013), which resulted in an increased noise limit being applied to the project. 

PPC 2013 Regulations do not reference BS 4142, however NIEA guidance for understanding noise assessment for PPC regulated activities does reference BS 4142.  Mr Keegan outlined his understanding of how the Applicant understood provisions to sit: 2 components to the site, a section under FODC jurisdiction (Mineral Extraction) and a PPC section under NIEA jurisdiction (BS 4142).

 

When processing equipment removed (Cyanide et al), requirements for PPC ‘fell out of project’.  Mr Keegan advised this was confirmed in writing from FODC correspondence 10/06/16.  He noted PPC component went from crusher building (removed) to covered storage building (remains) and processing building (remains unchanged).  Mr Keegan referred to specialist cladding being specified for these building prior to level of processing being reduced on site/ removed, however specification retained to reduce sound impact locally.

Third party objector Martin Tracey raised the lack of WiFi preventing him from accessing submissions related to the discussion topic and for this to be resolved to allow full participation.  Third party objector Niall McAleer, also asked that the inquiry be adjourned until this can be repaired or a time allowance given to third parties to source alternative internet supplies – requesting a 30 minute recess to allow him to go & purchase a portable router to fully participate.  Commissioner McParland did not consider these requests necessary due to the focused line of questioning being directed only to the Applicant & FODC thus far.  When Niall McAleer continued to voice this as procedurally unfair as third parties were the only parties hindered and this was a clear barrier to participation – he was deemed to be causing disturbance to proceedings and given a formal warning from Commissioner McParland that if he continued to intervene he would be asked to leave & the police would be called.

Commissioner McKeary put the next question to the Applicant: FODC considers a single background sound level appears to be allocated to each location, with no consideration/ tailored response to individual locations surveyed.  Mr Keegan (DGL) responded with a reference to a mineral planning guidance note which included a maximum permitted level of 55dB and argued that it was typical that a single value noise limit be imposed on a quarry.  He was not challenged on this deliberate conflation (quarry/ mine) by Commissioners.  Mr Keegan noted that the lowest background sound levels were picked up at Pollan Rua cottage (level not declared) and the highest background reading in the area was 37dB.  Mr Keegan then outlined a number of noise conditions applied to quarrying projects: mineral extraction at a quarry site 45dB (day time noise limit); noise level set at 10dB above background level, noting a quarry within the FODC jurisdiction (Tracey, Belcoo) LA10/2023/2356/F where quarry noise limit of 48-49dB, did not cause nuisance to nearby residential properties (32dB receptor threshold set).  The distance between these locations was not outlined.  Kilwaughter quarry Larne, 45dB limit set at quarry, with background noise limit at nearby residential property 33dB (LA02/2021/0615/F).  Commissioners were also directed to cross-check these examples in TR11 (Page 50) & RR11 (Pages 7 +11).

 

In response to this, Mr Fegan (FODC) noted each site has to be considered on its own merits.  Guidance should be applied to particular sites in their individual context, ‘I don’t accept there is anything to be gained by going through noise limits on examples’. 

Mr Skinner (FODC) highlighted the importance of considering context, control & mitigation of noise, affected properties & sensitive environmental sites – site specific analysis cricital, noise level at noise sensitive properties more important than trying to derive an overall value for the proposal site.

 

Mr Skinner then explored the Applicant’s attempts to establish a noise level that does not exceed the baseline sound level + 10dB as per PPG requirements across daytime, evening time and night time at 5 monitoring locations (Table 21, Page 54 of 75, Appendix C18 – Noise Impact Assessment (Part 1), ES 2017), noting that Evening noise at NML 2 already sat outside these parameters.  However, when FEI (July 2019) Appendix C18_Noise Impact Assessment Addendum is reviewed, it is noted on Page 3 (Section 3.2) that proposed day time and evening time noise levels be set at 45dB rather than 42dB, which in turn causes further non-compliance across these noise monitoring locations (NML).

Mr Keegan when asked to respond to this returned to his quarry examples, noting that an extension to Kilwaughter had a condition noise level shall not exceed 45dB with properties 100-150m away from quarry and Tracey quarry (Belcoo) had houses less then 200m away from quarry operations.  Mr Keegan noted the closest properties to DGL’s proposal are 400m away from the site boundary.  He argued that whilst noise may be heard, the low levels of this would mean behaviour is not affected and would not lead to a change in behaviour.  He asserted that a night time level of 42dB would not affect sleep disturbance, noting that WHO guidelines were at 45dB prior to 2019, when target night time sound level was reduced to 40dB, with an interim target of 55B also mentioned, seeking to reassure those present that the noise levels proposed were unlikely to have an impact on residential areas nearby.  Commissioners were then directed to Table 9 in Appendix C18_Noise Impact Assessment Addendum FEI (July 2019), Page 21 of PDF, as a worst case analysis of noise levels at nearby homes.  This worse-case scenario assertion does not appear to be noted in the document when cross referenced.

Mr Fegan (FODC) noted the two jumps in proposed figures referencing (Table 21, Appendix C18 – NIA (Part 1), ES 2017) with DGL’s disputed baseline figures +10dB still being lower than the proposed noise level of 42dB (in 2017), with the gap widening further with the 2019 Addendum increasing this to 45 dB.  These two leaps are not consistent with the PPG,  highlighting disparities at NML 1 & 2 on analysis.

Mr Keegan (DGL) then noted that the uplift from 42dB to 45dB and non-compliance with +10dB uplift above baseline at all noise sensitive receptors could be explained away, as on review BS 4142 did not need to be applied as this expressly excludes mineral extraction from scope and 45dB was a strict limit.  He argued that setting a condition any less than 45dB would be a very stringent noise level and impose an unreasonable burden on the operator to achieve this.  Mr Keegan also deemed this non-compliant with the noise policy statement for NI.  He noted this was not legislation, referring to it as DoE document (dated September 2014) with three aims: 1. Avoid or mitigate significant adverse impacts on health and quality of life; 2. Mitigate and minimise adverse impacts on heath and quality of life; and 3. Where possible, contribute to the improvement of health and quality of life. 

Mr Keegan noted the applicant’s view that the noise limits proposed were below a level that could be perceived to cause an impact on quality of life.  Noting 10dB was relevant, as an uplift limit, with DGL’s assertion that 35dB was average for the area, so 45dB was an ‘extremely quiet noise level’.

Commissioner McKeary queried why it was unreasonable to impose a noise level below 45dB for those seeking quiet? Are there difficulties measuring noise levels below 45dB (as previously alluded to by Mr Keegan)?

Mr Keegan reiterated the stance that as near as practicable to background level + 10dB should be considered acceptable, and in his view activity at 45dB would not affect amenity and would not cause change.  Setting a level below this, would again be an unreasonable burden on the mineral operator.

Mr Fegan (FODC) queried the relevance of the Noise Policy Statement (NPS), as referenced in SPPS 2 (Page 113 – Annex A Managing Noise and Improving Air Quality), asking Commissioners to pay due regard to the noise policy statement and the link to Regional Policy Statement – ‘it is important you have a look in due course’.  Mr Fegan highlighted page 3 of NPS which notes it ‘should be relied upon in situations where there is no guidance or standards’ in place, this is not the case here, you have the PPG (Planning Practice Guidance ‘Assessing Environmental Impacts from Mineral Extraction – Noise Emissions’ March 2014).  He continued it is not the case that guidance/ specifics/ PPG doesn’t add up as portrayed by Mr Keegan on behalf of the applicant, the specifics don’t work for them – which is why the commissioners did not get a answer when asked directly.

Mr Fegan noted Significant Observed Adverse Effect Level (SOAEL) varies for different noise receptors and, differs depending on time of day/night.  He noted the applicant now appears to accept that they breach PPG and are seeking to rely on and persuade you (Commissioners) to rely on unreasonable burden.  This wasn’t the case put forward to you in Statement of Case submissions.  It was stated that a more stringent sound level was unreasonable & would conflict with Noise Policy Statement, it was notable however, that Commissioners were not directed to a single paragraph in the text to justify this stance, no analysis was provided.  Mr Fegan asserted FODC’s view that the 45dB noise limit now brought forward, was ‘sneaked in’ from another planning application – and should be treated with caution.  He noted Mr Skinner would comment on difficulties to measure under 45dB, adding that this can be done.  Mr Fegan noted that Commissioner McKeary did rightly query what was unreasonable about keeping things quiet and noted the 27dB baseline reading at NML2 (noise monitoring location 2 – Table 21), stating it is not unreasonable to seek to keep these places quiet – it is part of the character of this AONB/ ASSI.  Mr Fegan also noted page 4 of NPS, which highlighted the protection of quiet places & quiet times; and will assist the overall objective – improvement of health and quality of life.  He also noted the applicants desire to reference WHO standards, as the limits within these are quite high.

Mr Skinner (FODC) noted there are plenty of precedents to demonstrate compliance through modelling and measurement.  Extensive modelling available for probing noise limits, measuring noise from development and deriving what would be achieved at receptor locations (nearby residences).  There are plenty of technical options available to demonstrate compliance through measurement & modelling.  This all can be done.

The Commissioners returned to DGL representatives for a response, with Mr Beattie returning to quarry comparisons; accepting noise was a material consideration and it was for the Commissioners to decide if it was appropriate to put in a lower noise limit.  Mr Keegan stated that we don’t accept that we breach guidance & the application did comply with mineral extraction limits.  He continued with the disputed quarry analogy, noting the highest possible limit for quarries of 55dB, and the upper limit of 55dB in Mineral Planning guidance.  He returned to a Belcoo quarry extension where to his knowledge, a 48dB limit was granted in March 2024.  Kilwaughter quarry was brought up where background level was deemed 33dB and a limit of 45dB imposed, in what could be considered an area of tranquillity as well.  Mr Keegan noted the Applicant’s modelling showing that figures proposed can be comfortably achieved in the area.  He noted the difficulty around measuring noise levels below 45dB was that it was likely that measurements would be impacted by other receivers/ receptors.

Mr Keegan drew Commissioners attention to Decibel scale / indicative noise level diagram provided from guidance in RoI and included in DGLs 2017 submission, (Figure 1, Page 11 Appendix C18 2017 ES), downplaying the significance of noise generation & impact on amenity – considering this as not at a level to cause impact.  He referenced further quarry examples from RR11 Submission, nothing a McQuillan quarry in Dromore with a 50dB sound limit conditioned by Environmental Health.

Mr Fegan (FODC) spoke noting the persistent reference to quarries in other provincial locations, adding that decisions are taken on a site-specific basis, context is crucial.  He noted that Mr McDermott (FODC Lead Planner) was not case office on Belcoo quarry planning application as previously asserted by the applicant (LA10/2023/2356/F).  Mr McDermott then spoke briefly to confirm case office for that application was Colin Harkness and the proposal was for a pre-cast concrete construction at an existing quarry, so was in no way comparable to the application before us.

 

Commissioner McKeary moved to a new question: Third parties argue cumulative noise effects may exceed the set levels being proposed and that assessments lack detailed analysis – inviting a response from DGL. 

 

Mr Keegan noted the application considered noise impacts on construction and operational phases, with impacts set out in standalone chapters of submission, to show how these have been fully assessed.  Mr Keegan drew reference to Table 2 FEI 1 (Appendix C18 NIA Addendum – July 2019 – Predicted noise levels at the noise sensitive receptors during the Construction Phase of the proposed infrastructure site) and referenced section 4 (page 7 of PDF) in which 5 scenarios were assessed: Blasting & crushing of blasted rock; Site Access, Access Road & Haul Road Construction; Earthworks, Site Clearance, Mobile Crusher & Embankment Construction; General Building Construction & Concrete Pour; and Noise Impact from Construction of Proposed Portal & Vent Raises.  He drew attention to Section 5 of the report (operational phase development) noting conveyors, workings of DSF (dry stack facility – as a continually evolving component of the project, with activity moving year to year) – asserting cumulative effect 100% assessed.

Mr Beattie (DGL) noted an overlap of issues that may need to be picked up on Mine Waste section, adding site infrastructure, building and ponds would need to be in place prior to operation phase.

Commissioner McKeary asked a question related to noise around site traffic, interested in a reference to timings which noted that worst case scenario impacts to be one hour a day.  Commissioner McKeary queried was this one period of time and noted that when traffic was discussed, there were 2shifts for workers daily, which is why question was posed. 

 

Mr Beattie noted assessments were based on Karl Dorman’s submissions as discussed previously in inquiry.  Car flows, daily average traffic & peak hour traffic, so both were assessed, C18 NIA Addendum (July 2019) Pages 20-22 examine this, with worst case early traffic noise report noting 123 cars movements (69 in & 54 out in morning; 78 out and 45 in evening).

 

Mr Beattie added he understood peak hour (evening) assessments were based on a consolidated figure of all traffic from 5-8pm being present over a one hour period

Commissioner McKeary was content that Mr Beattie’s answer dealt with this matter.

Commissioner McKeary noted a helicopter has been used in the past to accompany explosives and sought a yes or no answer – has this been included in the noise assessment?  The answer was no.

Commissioner McKeary posed a final question in this section, relating to Applicant’s assertion that there would be no noise impact from blasting – what parameters were used to consider this?  Commissioner McKeary noted propagation of sound through underground mine should also have been explored/ known.

Mr Keegan noted Blasting above ground noted as having been assessed.  He stated that underground blasting was not expected to be in anyway significant, as ‘it’s underground’ and was a controlled situation.  Location & direction of portal opening (hemispherical operation of sound) minimised and mitigated noise transferring to local homes.  He did then admit that how far underground, what noise, was not expressly assessed to date.  Mr Keegan then noted that the nearest receiver (house) to the mine vent raises was 420m away & noted blasting permitted in quarries 100m from residential properties. 

 

FODC (Mr Fegan) confirmed they had no remaining issues on residential analysis under sensitive receptors.  Mr Beattie (DGL) raised an address (232 Crockanboy road) that was not shown in DGL submissions as they were unaware it was occupied, with Dr Gordon (Turley) adding that he had thought it was a shed/ farm building. It was noted that the property’s owner (Mr Mc Cullagh) previously appeared at the inquiry and spoke against this application.  Dr Gordon noted Mr McCullagh has noted the premises were occupied until very recently, adding that a planning permission for dwelling replacement on this site had lapsed, as additional context.

Attention also drawn to DGL SoC submission, TR 11 Noise – Table 13: Noise sensitive receptors in proximity to the proposed infrastructure site input to the noise prediction model – verbally referencing the property as 600m away from the nearest area of DSF (Dry Stack Facility / Mine Waste Rock Store).  On cross-checking this outside of the inquiry setting – a distance of 550m is noted in this table.  Dr Gordon did note that 216 Crockanboy Road was closer to the DSF at 400metres away.

Mr Keegan drew the Commissioners attention to DGL SoC submission, TR 11 Noise – Pages 22 & 13, which were unavailable to third parties for cross-referencing at this time due to Wifi unavailability.  Page 22 consists of Table 12: Vehicle movements on site inputted to a 2019 noise prediction model, Page 13 contains Baseline Monitoring Data Analysis Methodology (as previously referenced above).  56 Mullydoo Road address was referenced as the nearest noise sensitive receptor to the centre of the Processing Building which is ~690m to the east.

The BS 4142 assessment for NSR 23, 56 Mullydoo Road, indicates potential ‘adverse impact, depending on the context’.  Mr Keegan noted with the distance qualified from the development proposal, 41dB Day time & 36dB night time sound levels were predicted, but would have negligible impact.  He also noted that inhabited or uninhabited dwellings were all assessed in the same way. 

 

Commissioner McKeary moved on to her next question to the applicant, specifically relating to mitigation – with negligible impacts & without data to assess impacts of mitigation, how can measures proposed to reduce noise to acceptable levels be assessed?

Mr Keegan (DGL) noted the applicant’s noise mitigation measures were set out in ES Nov 2017 Appendix C18 – Noise Impact Assessment (Part 1) Pages 68-69, with no change to mitigation measures in July 2019 FEI submission (Appendix C18 NIA Addendum).  Operational mitigation measures include: Building Envelope Design & Orientation (building cladding to provide high level of sound attenuation); Dry Stack Design & Orientation; Ventilation Raise Design; and ongoing Monitoring. Mr Keegan referred to Construction & Environmental Management Plan(s) and BS 5228 Control of Noise, which he considered a ‘robust industrial standard’, and plans would allow for the achievement of target construction noise levels.

 

Commissioner McKeary noted mitigation measured included reference to a 2.5m high closed boarded fence around the perimeter of the development site & queried was this still proposed & was this shown on any of the drawings submitted?  It was confirmed that this was still proposed and also that it was not shown in any drawing submission to date.  No further queries were asked on this, despite it being a direct contradiction to previous submissions on other inquiry topics.

 

At 12:40pm Commissioner McKeary confirmed that all the questions on the noise topic that she wished to ask were now covered, so it was now open to third parties if they wished to make a response on the preceding discussions.

 

Third party objector Niall McAleer voiced concerns with how the inquiry proceeded today, the manner of which he considered disgraceful – all questions on a complex topic have been asked in their entirety prior to allowing any third party input and this exclusionary approach is further compounded by the lack of Wi-Fi to enable cross-referencing by third parties.  He noted that the Wi-Fi outage was outside of the Commissioners control, however how this was dealt with was entirely within their gift (and the third parties were plainly disadvantaged).  He sought clarity on whether third parties would now be limited to one response to cover all the issues raised this morning or would multiple contributions be accepted due to the extent of questioning conducted without third party involvement.

 

Mary Brolly (SOS Solicitor) voiced concern that all questions have been rolled together for third parties to respond to.  This is supposed to be a round table discussion, not a cross-examination.  Third parties have had no Wi-Fi for three hours and no provision has been made to accommodate them, whereas Applicant, FODC & DfI all had this facility.  She referenced the inequality of arms for third parties before, but today has certainly reinforced it.

 

Commissioner McParland did not agree that the approach taken today was any different to previous sessions and asked FODC for their view.  FODC Barrister Mr Fegan noted that he didn’t see anything different in how the inquiry was conducted this morning. 

 

Third Party objector Martin Tracey asked for a procedural ruling on no access to information, Commissioner McParland refused this.  Commissioner McParland indicated that third party speaking rights would be limited to a single contribution for those wishing to make comments.  Niall McAleer noted that he had made 14 pages of notes on discussions this morning & had made several pages of notes the previous night on points he considered relevant so would defer speaking until after lunch.  

Commissioner McParland asked FODC if the Public WiFi  connection could be repaired over lunchtime, with Mr Fegan asking that the inquiry adjourn to 2:30pm to allow additional time to address this.  He noted that FODC could provide paper copies of information tables referenced this morning, suggesting 10minutes be given upon resumption for third parties to review hard copies.

 

 

Upon resumption at 2:30pm Commissioner McKeary read out a short list of documentation discussed this morning:

  • Appendix C18 Noise Impact Assessment (Part 3) ES Nov 2017 – Graph 1B  (Page 10 of 19).
  • Appendix C18 Noise Impact Assessment Part 1 ES Nov 2017 ‘Table 21: Derived PPG ‘Assessing Environmental Impacts from Mineral Extraction – Noise Emissions’ (March 2014).  Page 54 of 75.  Reference given was P.57.
  • Appendix C18 Noise Impact Assessment Part 1 ES Nov 2017 ‘Table 9: Noise sensitive receptors in proximity to the existing surface infrastructure site input to the noise prediction model’.  Page 31 of 75.
  • Appendix C18 Noise Impact Assessment Addendum (July 2019)  ‘Table 9: Predicted noise level at receptors due to components of proposed project subject to compliance with PPG’. Pages 18-19 of 32.
  • DGL SoC submission, TR 11 Noise – Table 4: Significance of Effect Levels.  Page 20 of 72.

 

FODC provided hard copies of two documents as below & 10minutes was given for third parties to review, before the inquiry recommenced.

  • Page 49 of Appendix C18 Noise Impact Assessment Part 1 ES Nov 2017 ‘Table 21: Derived PPG ‘Assessing Environmental Impacts from Mineral Extraction – Noise Emissions’ (March 2014).
  • Pages 18-19 of Appendix C18 Noise Impact Assessment Addendum (July 2019)  ‘Table 9: Predicted noise level at receptors due to components of proposed project subject to compliance with PPG’.

 

This list did not cover all the material referenced in the morning session.  Third parties were then invited to make comment.

Marella Fyffe (SOS Chair) spoke on behalf of Margaret Keenan from Teebane West, a retired teacher who was unable to attend today in person.  She outlined concerns of the noise impacts from mining operations if permitted on children, which could affect their sleep, learning and emotional well-being.  She noted rural families want to live in peace & quiet, away from industrial noise zones.  She added that her family owned houses opposite the chapel in Rousky and had not been consulted on the application. The Commissioner told her to take it up with DfI if they were not consulted.

 

Niall McAleer spoke next, noting that he had studied acoustics at University, so had some grounding in the subject and wished to highlight some basic principles.  A difference of 2dB in sound is technically a 58% increase in acoustic energy but is barely perceptible change to the human ear.  The ear is logarithmic and typically requires a 3dB change to be clearly noticeable and a 10dB change to be perceived as twice as loud.  He noted the 2016 baseline data overlapped with explosive blasting connected to the exploration tunnel extension previously permitted, so was concerned this did not represent worst case scenario.  He noted that wind speed can be used to inflate the baseline, which as Mr Skinner (FODC) pointed out artificially higher background sound levels allows for more noise from operations. 

 

Niall McAleer then asked to return to Table 21: Derived PPG ‘Assessing Environmental Impacts from Mineral Extraction – Noise Emissions’ Appendix C18 ES Nov 2017) noted that the Applicant had referenced Pollan Rua Cottage (NML 1) having recorded the lowest sound level measured but did not state the value this morning (& not refenced in this table).  When the proposed noise levels from the Noise Impact Addendum (Appendix C18 FE1, 2019) are considered alongside this, 45dB noise limits during daytime & evening with 42dB at night – compliance with the PPG shows approximately an 80% failure rate during the daytime & evening periods.  The Applicant’s own figures show compliance at one noise monitoring location out of five in each instance.  This was based on a disputed baseline +10dB, as the threshold pre-failure – noting that this level if complied with, would already be experienced as twice as loud to the people of the area.  In his view the sound levels proposed have been backward engineered by the Applicant based on the noise levels they know will arise from operations if permitted, rather than reflecting the quiet reality of the AONB.  Niall McAleer noted that a sound level of 45dB has been repeatedly presented as quiet and wished to challenge this.  He noted that Figure 1 Sound Pressure Level scale & Indicative Noise Levels (Page 11 of 75, Appendix C18, NIA (Part 1) ES Nov 2017) referenced by Mr Keegan on behalf of DGL, showed a quiet bedroom to be 30-32dB with the night-time noise level proposed 10dB above this.  He noted that target noise limit in school design for classrooms is 35dB and did not view 10dB above this as quiet.

 

Niall McAleer then asked to make comment on the continuous acoustic impact of Mine Ventilation Shafts & Air Vents.  He noted:

1. Unlike underground machinery or surface haul trucks that operate in shifts or cycles, the primary mine ventilation shafts and industrial surface air vents at the Curraghinalt site must operate continuously. To ensure subsurface atmospheric safety, clear blasting gases, and prevent the buildup of toxic particulate matter, these high-powered industrial extraction fans will run 24 hours a day, 7 days a week, 365 days a year. This introduces a permanent, non-yielding acoustic footprint to the surface environment.

 

2. The noise emitted by mine ventilation headers is not standard broadband noise. It consists of low-frequency aerodynamic vortex shedding and pressure fluctuations generated by the high-velocity rotation of the fan blades.  Low-frequency sound waves have exceptionally long wavelengths. This physical characteristic means they suffer very little atmospheric attenuation (weakening over distance) and are not easily blocked by standard vegetation or light topographical features.  The Valley Amplification Effect: Due to the valley topography of Co. Tyrone, meteorological conditions such as night-time temperature inversions (where cold air is trapped near the ground) will actively bend these low-frequency acoustic waves back down toward the valley floor, projecting the fan noise significantly further into local residential clusters than standard flat-terrain computer models predict.


3. Under BS 4142, any noise assessment must compare the “Rating Level” of the industrial source against the pre-existing background sound level.  The rural Sperrins AONB features an exceptionally fragile background environment where night-time sound levels routinely drop to a silent 20–30 dB (Sperrins Baseline).  The “Character” Penalty: Because the air vent noise will emit a constant, distinct aerodynamic “whine” or low-frequency “hum,” human hearing will effortlessly isolate it from natural sounds like wind or rustling leaves. Under BS 4142, a mandatory acoustic character penalty of up to +6 dB must be added to the specific vent sound level to reflect this heightened level of community annoyance. We contend that when this character penalty is applied against the true, ultra-low rural background level, the ventilation shafts will create a permanent “adverse impact,” fracturing the statutory tranquility of the protected AONB landscape.


4. Standard environmental noise mitigation measures, such as basic acoustic louvres or perimeter landscape bunds, are highly inefficient at stopping low-frequency fan noise. The long wavelengths simply wrap around or pass over these barriers (a process known as acoustic diffraction). Furthermore, low-frequency sound effortlessly penetrates standard double-glazed residential windows. Once inside local bedrooms, it can trigger room air-column resonance, effectively amplifying the low hum indoors and severely disrupting sleep, causing chronic micro-arousals and long-term psychological fatigue for residents.

 

Cormac McAleer (SOS) spoke next on the noise impacts from Heavy Machinery and Mobile Plant Equipment.  He highlighted concerns on the noise generated from mine traffic/ haulage roads collectively, wondering how the impact of distraction for children walking along the road could increase risks of accidents.

 

He challenged the applicant’s approach to averaging noise levels across the locality which takes away peaks in noise, making it look like they don’t exist.  He questioned the noise impact on humans, animals/ creatures from jumbo drill rigs, rock bolters, haul trucks, dozers on dry stack waste facility, noise from surface blasting and the impact on receptor houses locally.  This dense concentration of mobile plant equipment introduces an unprecedented, highly intrusive acoustic footprint to both the subsurface and surface environments in a quiet rural ecosystem. 


Cormac McAleer noted that unlike steady-state industrial background sounds, heavy machinery noise is exceptionally disruptive because it is highly irregular and unpredictable.

Operations such as hydraulic rock-breaking, percussive drilling, and the dropping of ore into empty truck beds generate high-energy, sudden acoustic spikes (impulsive noise). These sharp spikes instantly shatter the natural environment.

 

The cyclical nature of mining—machinery accelerating under heavy load up steep portal inclines, the sharp hiss of pneumatic air brakes, and the piercing, high-frequency sound of reversing safety alarms—creates a constantly fluctuating noise environment (Intermittent Shocks).

 

The large-displacement diesel engines powering the haulage fleet emit dominant low-frequency sound waves. These long wavelengths travel vast distances across the Tyrone valleys with minimal atmospheric loss and easily bypass standard light terrain features or vegetation.

 

Cormac McAleer noted that he believed a number of houses were closer to the site than the 400m distance referenced by the developer (possibly LA10/2026/0187/F), but would check this overnight & provide planning references tomorrow.

 

Fidelma O’Kane (SOS) then spoke, firstly challenging the Applicant’s use of average, rather than lowest level of background noise recorded.  This artificially inflates the baseline. Using a “typical” baseline of 35 dB for example, instead of the true 23 dB experienced during a quiet Sperrins night, their noise models will show a much smaller impact.  In a protected Area of Outstanding Natural Beauty (AONB), the “lowest” noise levels are the defining characteristic of the landscape’s tranquillity.  Averaging out the quietest periods mathematically erases the very silence the community is trying to protect. 

 

Concerning the surface ventilation fans: the use of ‘typical noise levels’ by the Applicant averaged meteorological conditions, smoothing out nights when atmospheric conditions are at their worst.  During night-time temperature inversions, which are very common in the Sperrins, cold air traps sound near the ground, this bends low-frequency vent noise downwards and throws it significantly further into people’s houses.  DGL should present the worst-case scenario not the average for the noise impact on a calm winter night during a temperature inversion, when the ventilation hum will travel maximum distances.

 

According to DGL, moving crushing and ore-sorting equipment underground, appears to be out of sight, out of mind.  However, crushing rock underground creates continuous, low-frequency, ground-borne vibrations that can travel through bedrock into the foundations of nearby homes.

 

Furthermore, relocating dusty, high-energy heavy machinery underground requires the surface ventilation shafts and exhaust air vents to work significantly harder to clear particulates and toxic gases, thus increasing the air-velocity noise and vortex-shedding “whine” from the 24/7 surface vents.

 

Therefore, moving the crushing underground does not make the energy disappear—it simply transfers it into structural vibration and forces higher acoustic outputs from the surface ventilation stacks.

 

In Summary, the applicant’s rebuttals rely heavily on ‘averages’—averaging the meteorological conditions to mask ventilation noise, and averaging background noise to hide the true silence of the Sperrins. Biologically, the human ear does not sleep in an average; it wakes up to the peak instantaneous tones of a 100 Hz substation hum and 24/7 vent whines. Dalradian has designed a model to satisfy statistical averages rather than to protect public health.”

 

Fidelma O’Kane moved on to speak on noise from the proposed electricity sub-station, noting the proposed sub-station will generate a continuous, steady-state, low-frequency hum. This hum is a well-documented physical byproduct of transformer core magnetostriction, vibrating at a fundamental frequency of 100 Hz (hertz) (and its associated harmonics). Unlike random, broadband ambient sounds (such as wind or rain), this noise source is highly tonal, non-yielding, and will operate 24 hours a day, 7 days a week, 365 days a year.

 

The application site is situated within the Sperrins Area of Outstanding Natural Beauty (AONB), a highly sensitive rural landscape characterised by exceptionally low baseline background sound levels. During evening and night-time periods, the background noise level routinely drops to between 20 dB and 30 dB (decibels). In such a tranquil acoustic environment, a continuous 100 Hz (hertz) industrial tone will possess a high degree of acoustic prominence. It will not be masked by the natural environment, making it immediately noticeable and invasive to nearby homes.

 

Furthermore, standard dBA-weighted assessments heavily filter out low frequencies and fail to capture how 100 Hz acoustic waves behave in houses. Low-frequency hums suffer very little atmospheric attenuation and easily pass through standard double-glazing. Once inside a dwelling, these wavelengths can cause internal room air columns to resonate. This creates an “amplification effect” where the hum sounds louder and more disruptive inside a bedroom at night than it does outside in the open air. 

 

To protect the community and the integrity of the AONB, we respectfully request that the Commission reject the developer’s current acoustic assertions until the following binding conditions are met: A full +6dB tonal penalty must been factored into all residential receptor models for the substations 24/7 operations.  This decibel adjustment is added to a measured noise level to account for the heightened annoyance caused by distinct, pure tones (e.g. hums, whines).  It is the maximum standardised correction used in environmental noise assessments, as recommended by Chartered Institute of Environmental Health (CIEH) and Institute of Acoustics (IOA).  The developer must also be legally bound to source ultra-low-noise specification transformers and variable speed cooling fans.  The design must incorporate full acoustic masonry enclosures or specialised sound-absorptive perimeter walls specifically engineered to attentuate100Hz frequencies, rather than relying on standard landscape bunds.  A network of independent, continuous sound monitors with real-time public telemetry is required to ensure the substation never exceeds a strict night-time rating level boundary limit.

 

Fidelma O’Kane asked to read a paragraph from BS 4142: 2014, updated in 2019 on Sound/Noise which she considered very relevant.  ‘Response to sound can be subjective and is affected by many factors, both acoustic and non‑acoustic. The significance of its impact, for example, can depend on such factors as the margin by which a sound exceeds the background sound level, its absolute level, time of day and change in the acoustic environment, as well as local attitudes to the source of the sound and the character of the neighbourhood. This edition (2019) of the standard recognises the importance of the context in which a sound occurs. Great care has, therefore, been taken in the use of the words “sound” and “noise”. Sound can be measured by a sound level meter or other measuring system. Noise is related to a human response and is routinely described as unwanted sound, or sound that is considered undesirable or disruptive.’

 

Fidelma O’Kane then moved on to reference the human rights noting that under international law and the European Commission for Human Rights (ECHR), severe noise pollution is no longer viewed as a mere inconvenience; it is a documented infringement on human dignity and well-being. 

  • Article 8 ECHR: The Right to Respect for Private & Family Life,

The home is a legally protected sanctuary.  Constant low-frequency hums, sudden blasting and the reverse-alarms of lorries/ heavy machinery threaten to violate Article 8 by destroying the peaceful enjoyment of local homes.  When a family can no longer sleep with their windows open, relax in their garden, or escape the hum of an industrial complex, their right to a private life is directly compromised.

  • Protocol 1, Article 1 ECHR – The Right to Peaceful Enjoyment of Possessions,

For rural communities, land is both an asset and a way of life.  Excessive, unending noise can cause de facto loss of property utility.  If noise levels render quiet outdoor recreation unbearable, it infringes on a resident’s right to peacefully enjoy their property.  It effectively devalues their home and land without their consent.

  • Right to Health ICESCR, 1966  (International Covenant on Economic, Social & Cultural Rights)

The UN recognises the right to the highest attainable standard of physical and mental health.  Industrial noise is a known environmental stressor.  Chronic exposure – especially the night-time noise from a 24hour mining operation leads to sleep deprivation, elevated blood pressure and heightened anxiety.  For nearby residents, the noise is not just an auditory issue; it is a direct threat to their medical & psychological well-being.

  • The Right to a Clean, Healthy and Sustainable Environment 2022

In recent years, the UN has explicitly minimised the divide between human rights and the environment.  Acoustic pollution is a form of environmental degradation.  Flooding an AONB with industrial noise violates the community’s right to live in an environment free from toxic sensory pollution, permanently altering the natural ecosystem they depend on.

  • Article 27 The Right to Participate in Cultural Life UDHR  (Universal Declaration of Human Rights)

The social fabric of the Sperrins is deeply tied to its quiet, rural landscape.  Shared community spaces – local schools, GAA sports field, walking trails and places of worship – rely on the natural tranquillity of the area.  Constant industrial noise threatens to fracture community cohesion, disrupting outdoor cultural practices and eroding the shared heritage of the region.  While DGL argues that strict engineering mitigations will keep noise within legally permitted thresholds, the local community maintains that introducing heavy industry to a quiet rural environment creates a permanent sensory intrusion.  Should questionable economic development outweigh the basic human right to peace, health & home?

 

Fidelma O’Kane finished noting that no Rural Needs Assessment or Section 75 Assessment have been carried out by the Applicant. 

 

Ms Brolly, SOS Solicitor,  introduced Bernadette Collins to talk about her experiences living beside a Mine in Co. Monaghan.  Commissioner McKeary intervened saying unless expert witness has prepared part of Statement of Case then they will not be allowed to speak.  Fidelma O’Kane noted Monaghan sinkholes have been referenced in SOS SoC. 

 

This was not accepted by Commissioner Mc Parland, SOS Solicitor Mary Brolly noted Mrs Collins was being relied on as an expert, she has 70 years of lived experience and queried the grounds on this refusal and where this clarification has been made by Commissioner or by PAC.  Commissioner McKeary asked what are her qualifications and Ms Brolly replied lived experience.

 

Cormac McAleer objected to the refusal to allow testimony from Mrs Collins & suggested that not all experts needed to have a degree to make a contribution.  Commissioner McParland took issue with Cormac’s intervention and told him as he had been warned before for interrupting, he would now be excluded from the inquiry.  This stunned the room.  The Commissioner then called for a short adjournment of the inquiry for Cormac to leave of his own accord or be removed by Police.  Cormac then left voluntarily.

 

 

Upon resumption, Commissioner McParland stated that if participants have been warned once before, on the second occasion they are out: noting that to date three people had received formal warnings (all third-party objectors).  These were Niall McAleer (today), Cormac McAleer (now excluded) and Martin Tracey (previously).  SOS Solicitor Mary Brolly queried if Cormac’s exclusion was for today or the remainder of the noise topic or for the remainder of the inquiry.  Commissioner McParland stated it was for the remainder of the Inquiry and said this process was laid out in procedures but could not advise where this was referenced when questioned on this.  Mary Brolly noted that she had never came across anything as adversarial as the Inquiry process in her career to date, noting an obvious inequality and what she considered to be an unconscious bias against the third parties.

 

Bernadette Collins was then permitted to speak, noting the noise from the numerous lorries, trucks, diggers and dumpers at the mine in her neighbourhood.  She recalled as a child having to hold the dinner plates on the table because they were bouncing from the vibrations underground.  She also recounted lying in bed at night and experiencing significant noise & vibration from the underground mine.  She spoke of impact on her local GAA club, where the building cracked & could no longer be used; and a huge sink hole appeared on the playing field.  Since then further sink holes have formed in the area.  The main road was closed for 10 months because of concerns of possible collapse.

 

Third Party objector, Ed Winters wished to speak about his experience living 300m away from the Cavanacaw Mine, noting ongoing issues since exploration started in 1984 and his own qualifications (degree in science & postgraduate in environmental protection).  He said there had been 39 conditions imposed to protect human rights and the mining was to last 8years, but 30 years later there has been no restoration ‘since 1983 we have been living through hell’.  Commissioner McKeary viewed his contribution as not directly related to this specific DGL application and closed him down.

 

Mary Brolly (SOS Solicitor) spoke next and began by noting the absence of tunnelling from receptor analysis which would clearly have an impact on sound transmission.  She noted a UNICEF document on noise and children’s health which referenced World Health Organisation (WHO) recommendations that night time noise should be below 40dB to protect sleep and average noise levels in classrooms not exceeding 35dB.  Reducing excessive noise is essential not only for public health, but also for upholding children’s rights to clean, healthy and sustainable environments.  Noise exposure is recognised as a environmental health issue at community level.  The noise from mining will mask the natural sounds of bird song.  Research shows bird song reduces stress and improves mental well-being. This industrial proposal will fundamentally impact on the home environment, community environment and social setting. 

 

She then listed relevant legislation connected to this subject: Right to life (Article 2: Human Rights Act 1998); Freedom from Discrimination (Article 14: Human Rights Act 1998) protects children, special needs, elderly, indigenous & minority community; Article 3: Interests of the Child – UN Convention on the Rights of the Child (UNCRC); Article 24: Right to Health (UNCRC); Article 31 Right to life, leisure & play (UNCRC); & Article 11 ICESCR (International Covenant on Economic, Social and Cultural Rights).  Human rights are engaged, and concluded this point by asking the PAC to consider this carefully.

 

Mary Brolly (SOS Solicitor) highlighted receptors within ecology that should also be considered in a noise impact assessment for this development:  The bird population, fish, wild mammals (badgers, otters, pine marten), fresh water pearl mussels; Pollinators such as bees & butterflies; and other insects.  All of which forage, navigate, live, breed in this habitat.  We’re simply told application won’t have impact on protected species or river quality – the justification is absent.  DfI must ensure that the Applicant has carried out thorough & robust assessment.

 

Third Party Objector Mr Sean Tracey noted the applicant’s evidence base was almost a decade old.  The project has evolved considerably since then, the mine design has changed, species information has been updated.  He posed the question: If the ecology baseline information has become outdated, how did the noise information not become outdated also?  Scientific understanding has moved on – European Environmental Agency now recognises noise as a leading environmental health risk.  Impacts of noise pollution linked with cardiovascular disease, system stress responses, dementia.  He noted BS 4142 examines industrial sound reflecting ‘industry receptors’.  Noise sources discussed: permanent ventilation, pumping stations, conveyors, processing plant, -water treatment facilities, fixed industrial equipment.  However, mechanical repair shop also included in proposal not mentioned.  Reversing noise (warning) for lorries/ HGVs is 87-112dB, HGVs will be moving in and out of the site day & night.  This will all significantly impact on the character of the area, tonality of sound & context must be considered.  Mr Tracey noted BS 5228  relied on by Applicant in documentation for noise control & vibration control.   Duration of noise, character & how sound is experienced by those exposed to it are relevant considerations.  The applicant has divided up vibration and sound – these shouldn’t be separated.  Information incomplete- blast mats are proposed for initial blasting – yet no reference to cranes to bring these in.  He talked about how sound travels across the valleys locally, hearing the Owenreagh river flow 400m away from his home, overhearing conversations from greater distances across the valley & how atmospheric inversions could cause the amplification of sound – referencing helicopters 500+ metres away (blade-slap phenomenon).

 

Mr Tracey noted CadnaA software used by Applicant for noise prediction comes with a built-in/ acknowledged error margin, referencing a Noise News international (2018 document) which noted software can vary up to 10dB.  Furthermore, model cannot handle temperature inversion.  Proposals separate noise from blasting, construction, operational plant, traffic: residents will not experience these individually but as one cumulative environmental experience.  Mr Tracey also noted that he understood a high decibel sound is to be emitted as common practice, prior to a blasting however this is not noted anywhere.  He summarised his concerns: -Aging acoustic baseline; -Insufficient explanation for Removal of baseline BS4142 (should not carry weight); -Apparent absence of blasting parameters; -Raw data unavailable for independent assessment (applicant previously stated the reason it wasn’t shared was that no one asked for it).  If Application did meet parameters set, one would think this data would have been readily handed over for independent review.   Mr Tracey believed that the human factor was being lost to meet numerical targets, noting that health impacts can commence well-below recognised thresholds, 45dB recognised cardio-vascular issues. 

 

If the pre-cautionary principle was to be fully applied – traffic noise would be based on one vehicle per employee, further consideration would also be given to the practicalities of journeys- highlighting compression systems in lorries for going over speed bumps outside the primary school and Greencastle village.  He noted that the Kilwaughter quarry extension referenced by DGL, received 400 objections due to adverse noise levels, with the Tracey planning application also relating to an extension to quarry from the 1980s, both of which bore little relevance to the application before the Commission.

 

Mr Martin Tracey, third party objector, then spoke – querying did a drawing exist within the application which showed the vent rises in relation to surrounding dwellings, noting that this needs to be considered.  Drawing reference 2016021-P-CIV-020 provided in relation to proposed locations of Mine Vent Raises. 

 

He viewed the wind speed records in Castlederg as more relevant (9-12m/s) to the site area than those at Lough Feagh (3m/s), as wind strength is depleted as it crosses the Sperrins to reach the latter location.

 

Mr Tracey posed a question: how does the noise  affect lactating cows?  Noting a number of dairy farmers in close proximity to the proposed mine site including Mr Hollywood, who is the farmer ‘next door’.  He referenced a study in May 2023 Annals of Animal Science study  (DOI 10.2478/AOAS/2023/0046) Nosie as a factor of environmental stress for cattle, which noted an adverse long-term effect on livestock, so this application could adversely affect future farm processes locally.  He expanded this point further, wondering what impact the noise generated from this application could have on family pets – lot of dog owners in the area, people also keep hens etc.  Mr Tracey noted that during the three year exploration approval, the applicant offered to stop exploration works for 2 hours on a Sunday for local church services.  The same offer was not available to the Chapel or the GAA club for the 25 year proposal now under consideration. 

 

Third party contributions were concluded at this point and the session closed for the day at 4:30pm.

Community woven together

Day Twenty One 

 Public by Name not By Nature

 

Today’s session began with Dr. Plunkett (for Dalradian) being asked if she had any rebuttal to Dr. O’Carroll’s expert submission from April 2026. It was stressed at the outset by Mr. Beattie, legal counsel for Dalradian, the Dr. Plunkett was not a hydrologist, and this was reinforced during her contribution to the inquiry by Dr. Plunkett herself, who noted she was “not qualified as a hydrologist” herself. With the initial focus on sub-peat archaeology, Dr, Plunkett explained that there were different archaeological finds within the peat, and whilst stone sites (tombs, Ogham stones, stone circles, etc.) were highly common in the local area, another, more fragile find could be organic – such as wood or leather. Her presentation to the inquiry seemed to be overly reliant on guess work and estimations as she acknowledged that it was difficult to know exactly what hidden artefacts were buried underground. She spoke of various archaeological discoveries across County Tyrone, including 36 organic finds (up to 2003) and another example she gave of four specific finds across the North, one of which was in Co. Tyrone.
She then moved on to speak about finds on the surface of peat, and she maintained that certain finds may be of “huge scientific importance” they may not constitute “archaeological heritage”, before noting that “peatlands in the area are not exceptional.” Despite Mr. Beattie being at great pains to record during his introduction of Dr. Plunkett that she was not a hydrologist, and Dr. Plunkett herself stressing that she was “not qualified as a hydrologist”, she still attempted to refute issues related to the hydrological threat posed by this toxic proposal. As was later pointed out by the third parties, her submission could ultimately only be taken with a pinch of salt.
She claimed that anomalies or unexpected figures would “jump out” in probing, and that these could be suitably dealt with if and when detected. Again it was pointed out that evidence and history tells us that anomalies are classed as “outliers” and dismissed or ignored by the applicant, and subsequently by the relevant Departments involved, raising further concern among the local population.
At this juncture Commissioner McParland interjected, questioning the depth of peat over the sample noted, and the scale of sampling over the entire site. She specified that there were notes of peat 5m deep, and that some detail had been included in the Mine Waste Safety Document but not the Peatland Management Document, noting that as such Dr. Plunkett may not have seen/been aware of it. Dr. Plunkett stated that this would be more akin to raised bog, which would mean there is a better chance of finding organic discoveries, but that ultimately Dalradian plan to remove this bogland. The uncertainty increased following questions from Commissioners McParland and Donaghey, as Dr. Plunkett spoke of Burnt Mounds being found below 200m, but in the same breath spoke of 19 being found in Tyrone below 210m.
Further questions were put to Dr. Plunkett about the impact of Dalradian’s plans not just to the areas where peatland is proposed to be stripped away and removed, but to the adjacent areas of peatland which remain. She seemed hesitant to answer, before proclaiming that there would be no impact!
Commissioner McParland raised further questions surrounding the peat survey, querying whether it was undertaken only for the infrastructure and mine site, or whether it covered the entire area of the planned works (designated by the red line on Dalradian’s submission)? Asking this question neither Dr. Plunkett, nor Mr. Beattie, nor indeed Michael Gordon from Turley who had by this stage scrambled over from the stage left to join the Dalradian table were able or willing to answer.
Commissioner Donaghey continued, if the peat depths on site haven’t been measured across the site, is the assessment of the applicant suitably precautionary?
Dr. Plunkett claimed that “the depth of peat is irrelevant”, and that artefacts may be buried in deeper peat that is very difficult to identify, noting surveys are “hit and miss”.
Commissioner McParland followed up, noting that peat depths had been taken at the infrastructure site, but she queried why there had been no in depth survey, why isopleth depths had not been recorded on site?
This prompted more smoke and mirrors from the Dalradian contingent, with Michael Gordon confusing the maps in question, before ultimately having to admit after being pressed by Commissioner McParland that indeed the entire red line site has not been surveyed, due to amongst other things, access being refused to Dalradian to enter neighbouring land.
It is worth noting, at this juncture, that there was a serious difficulty experienced by participants outside the applicant’s table in finding some of the figures and maps noted, with even the Commissioners admitting to this problem. Again it laid waste to the giant projection on the screen behind the Commissioners, which could (one would presume) be very easily utilised as a source to project maps, figures, references onto when being discussed as part of the “public” inquiry process.
Maybelline Gormley, Senior Archaeological Inspector and Scheduled Monument Management lead within the Historic Environment Division (HED) , part of the Department for Communities (DfC) was then invited to speak, and she systematically destroyed the points put forward by Dr. Plunkett. She began by making apologies for Dr. O’Carroll, explaining that she was unable to attend the re-scheduled date as she was out of the country, but noted that she was an esteemed peatland expert on the island and that the Department were confident of both her credentials and her assessment. She continued to explain that organic finds, such as wood, textiles and leather, were of a much greater quality if found in peatland due to its powers of preservation. The information gleaned from such artefacts, therefore, was much higher. The quantity of such finds in the area in question is “unknown” with blanket bog uplands in County Tyrone having not been explored or investigated, so Dr. Plunkett’s assumptions on an absence of undiscovered archaeological items of interest on site is completely unfounded. She pointed out that stone elements or sites are identified much more easily, even by non-archaeologists and pointed out that Dr. Plunkett’s observations were as part of a desktop review. Ms. Gormley noted that whilst Dr. O’Carroll may not have walked the entire site, she did visit the area and travelled as far as Davagh, so she has viewed and understood the area in question. Whilst echoing the description from Dr. Plunkett that the “peatland may not be exceptional”, she qualified this with the caveat, “but the potential findings could be”. She described the inescapable fact that the works proposed would have a major impact on any artefacts buried in the vicinity, and that there would be no potential mitigation for those affected outside the development site. She explained that the proposed removal of 16 hectares of peatland would cause significant disruption to the remaining peatland, and that the hydrological changes which would come from the proposed works may well damage artefacts and cannot be mitigated. She pointed out that none of this had been researched or evidenced by anything provided by Dalradian, and that the peat management plan does not include archaeological excavation, mitigation and management. Likewise the impact of blasting and drilling had not been quantified. Ms. Gormley explained that both the Tullybrick Pre-Bog Landscape and Killymoon Bronze Age Site were more comparable in relation to the level and potential significance of deposits found in the peat, before concluding that the applicant had not demonstrated that research has been adequately carried out and they have not demonstrated that no harm will be caused by the proposal or the mitigation measures.
Several third party representatives then spoke of local finds which had been made in the area, but had not been reported to DfC, including buckets of “bog butter” (home made butter that was left in a bucket and buried in the bog, which acted as a natural refrigerator) and leather shoes – which had been exposed when cutting turf with a spade, and which were subsequently re-buried by those who found them. There was reference made to a number of sites of historic interest that locals were aware of, including a giant’s grave (potentially a gravesite from the Battle of Formil it was claimed), and a death stone/funeral stone which is also on site. Concerns were raised over the impact already witnessed on the headwaters of the Pollanroe Burn, and reference was made to the depth of peat exposed following landslides after mining explosions on the other side of the hill, with the peat there being noted as being at least 3m deep. Another speaker said it was ridiculous equating the height of the land above sea level with an absence of archaeological finds, noting that if that was indeed true then none of the hugely important and significant finds in the local area would exist! It was noted that there was a great contrast of peat depths across the proposed site, and that there was worse degradation of peatland in the Mournes, although seemingly significantly better protections offered there.
Commissioner Donaghey again at this point came in again on Mr. Haughey, cautioning his submission and instructing him to keep his responses relevant to the question posed, without repeating previous contributions.
Mr. Haughey noted that once more the third parties were being treated differently to the rest of those presenting to the “public” inquiry before concluding that Dr. Plunkett’s contribution was based on her presumptions as opposed to fact, as evidenced by her lack of knowledge of the peat depths on site and the fact that it was a desktop survey conducted with information provided by the applicant.
Fidelma O’Kane, from Save Our Sperrins (SOS), was next to contribute, noting that in 1994 the large Stone Circles at Copney were partly cleared of peat and were found to contain complex patterns of smaller stones. After the clearance work, the Copney site was described as the most complex and visually impressive group of stone circles yet identified. This site sits at 279m, contrary to Dr. Plunkett’s assessment and assertions regarding sites of interest/importance being sub 200m. She also relayed stories in the local press in recent years of finds in the Carrickmore area, which included a 3000 year old butter bucket that was deemed to be still edible! She noted that the Dalradian application in 2017 recorded the plan to remove 74 hectares of peatland to build infrastructure, and to abstract half a million gallons of water 24/7/365 – the impact this would have on the remaining peatland would be devastating and could not be mitigated. She noted that SOS’s expert witness, Dr. Emerman, had challenged the groundwater model, and that this would hopefully be discussed in much more detail when that topic was timetabled. She also explained that the proposed new road would have serious implications for the peatland, as well as noting the impact of the removal of peat on the local ecology in the area. She spoke of the Omagh Thrust Line, a major geological fault line which runs through our area, but acknowledged that the Commissioners may wish to leave that topic to the seismic discussion when it is scheduled. She finished up by referencing the NI Peatland Strategy to 2040, stating that the PAC must attach weight to this potential loss of important historical and archaeological artefacts.
Cormac McAleer, for SOS, again stressed that gold mining is not like a normal industry, or any other industry working here today. He queried how the application had managed to get this far and said that there should be no countenance given whatsoever to this industry in the absence of a statutory body dealing specifically with gold mining. He noted the hotch-potch approach from the Crown Estate down, and the failings at every level which have been evidenced throughout, and urged the PAC to oppose the planning application before them.
Lynda O’Sullivan, speaking for SOS, noted that, again contrary to Dr. Plunkett’s submission, there are at least six sites on slopes noted by National Museums NI, and she also spoke of the Dun Ruadh site locally, which contained a number of important organic and inorganic finds, as well as one of the most famous sites in the South, that at Croagh Patrick, which is also on a slope and would completely refute her assertions. Ms. O’Sullivan also noted that the issue is whether any degradation would come about as a result of the proposals, not just if they will be degraded whilst Dalradian are there/operating on site.
Marella Fyffe, Chair of SOS added that it was worth investigating what the impact of the pH of the concrete and tar proposed to be used would have on the bogs and peatland, querying why no study had been carried out in relation to this and citing examples of the impact of a new road locally that she had witnessed.
A local mother, Emma McAleer, quoted the Peatland Strategy, noting it was from Department of Agriculture, Environment and Rural Affairs, which acknowledged in its foreword from Minister Muir:
“Our peatlands are of enormous importance to every citizen in Northern Ireland. Well managed peatland provides a healthy environment which improves biodiversity and water quality, reduces flood risk and helps combat climate change. Our peatlands contribute to the distinctive beauty of our upland and lowland landscapes. They are also a valuable archive of climatic and vegetation history and local archaeology. For many people these are wild and unspoilt areas where they can walk and breathe in fresh air and enjoy the benefits that nature brings to their health and wellbeing. This is why I am committed to taking forward the actions in this Peatland Strategy which sets my ambition to ensure that Northern Ireland’s peatlands, and the benefits they bring to society, are secured for future generations. Peatlands provide a variety of ecosystem services. Nature and wildlife thrives in well-managed peatland habitats and these also provide a nature-based solution to flood risk and climate change – at both a global and local scale. Peatlands could be viewed as the ‘rainforests’ of Northern Ireland, given the vast amount of carbon they store and could potentially sequester and the rich diversity of animal and plant life that they support. To provide these services however, they need to be in a healthy state. For many decades, our peatlands were viewed as barren and unproductive places, but in reality, they provided often unnoticed ecosystem services and supported many economic activities.”
She also referenced the Sperrin AONB DRAFT 5-year Action Plan 2026 – 2031 submitted by Fermanagh and Omagh District Council (FODC) & the Sperrin Partnership and admitted into evidence by the PAC on 27th April, noting in particular Objectives 1.1 (Support the conservation of priority habitats and species within the AONB), 2.1 (Value, protect and enhance built heritage within the AONB), 3.1 (Monitor Landscape Character changes within the AONB) & 4.1-4.3 (Support initiatives that enhance the health and wellbeing of communities within the AONB / Encourage greater access to Outdoor Recreation opportunities within the AONB / Promote Sustainable Tourism within the AONB). She also spoke on the importance of community archives, explaining that there is a rural reliance on archives, which are locally based, stored and promoted, and concluded that any disturbance experienced as part of this proposal risked destroying irreplaceable historical artefacts, and therefore was not worth the risk.
John Donaghy, Manager at An Creagán added that research carried out over a two year period discovered 30 mew sites locally during that time, and that these were documented and passed to DfC.
As Sean Clarke from Broughdearg said, if you want to see archaeological artefacts or historical sites, step across the fence into the ASSI and you’ll see them!
Dr. Plunkett was invited to speak once again, and she acknowledged that “local archaeology is most important”, again noting that she hasn’t “taken a detailed study”. She then, quite incredulously, went on to claim that “the developer will help with the protection of the bog”!
Commissioner Donaghey sought clarification, asking if there was an absence of mitigation for the removal of peat, but not the impact on the remainder of the site (impact on the archaeology)? Dr. Plunkett answered, “No.”
Mr. Long, for Dalradian, came in at this point to acknowledge that “exposure can lead to rapid deterioration” when dealing with historic and archaeological artefacts.
Ms. Gormley was invited to contribute again, and noted that whilst elements of Dr. Plunkett’s report is based on what is known, what is known is “skewed”. Again, she pointed out that there was no investigation or archaeological monitoring carried out, and that whilst the peatland may be degrading, it is an important resource, therefore its importance is increased. She questioned whether construction and operation will have unknown and un-investigated impacts, stating that this would be a loss. She concluded saying there had been no consideration given to the scale of impact and the unknowns for archaeology.
Frustratingly, at this juncture, Dr. Plunkett was again permitted by the commissioners to attempt to counter what had been put forward, but none of the third parties were permitted to speak on the outlandish claims she had made, including that somehow by removing 74 hectares of peatland and abstracting half a million gallons of water every day for 25 years would somehow leave the bog in a better condition thanks to Dalradian!?
Picking up on this, Mary Brolly, legal counsel for SOS, noted the continued preferential treatment of some, criticised the language used by Dr. Plunkett, and again noted the absence of a hydrology qualification despite repeated attempts to speak on hydrological issues.
Moving on, the Commissioner asked a question on the potential impact on St. Mary’s Church in Rouskey.
Responding, Meabh Morgan from HED claimed that it is “too far removed”, so no investigations had been carried out.
As immediately pointed out by the third parties, given the impact of blasting, vibrations, unknown direction of tunnels, etc, how can this be the case?
Cormac McAleer noted the language used, including that there would be “less of an impact”, highlighting to the commissioners that the baseline should be where there is no impact – i.e. no powerlines, no toxic mine or waste dump facilities, and that this is not a process to make this application more acceptable to those within planning. He also commended both Michael Turley for acknowledging that a full site survey hadn’t been completed as Dalradian had not been permitted access by landowners, and Mr. Long for his acknowledgment of the detrimental impacts Dalradian’s actions would have on important archaeological artefacts.

Just before breaking early for lunch, Mr. Elvin, legal counsel for Department for Infrastructure (DfI) informed the commissioners that a site visit had been carried out at the explosives store on the Camcosy Road and that DfI were satisfied that splays of 2x60m had been confirmed. No further discussion was permitted on this before lunch, with SOS noting in particular the absence of both our roads expert and architect impairing the ability to respond in detail.

On our return from the early lunch and before discussion moved onto the associated conditions on this topic, Mary Brolly, legal counsel for SOS, spoke in response to issues raised in relation to St. Mary’s in Rouskey. She noted that it was understood that there were very shallow, if any foundations at the chapel and serious concerns relating to the planned blasting, drilling, construction and HGV traffic in close proximity to the chapel were detailed. The building’s listed status was noted as being highly important, as was the chapel as a highly sensitive receptor. She explained that it was impossible to determine the risks with any certainty and queried if HED had perhaps carried out a visual assessment only? The local Parish Priest had not been consulted, and questions surrounding neighbour notification were raised, with Commissioner McParland confirming the importance of such citing an example of the erection of a big screen in Newry which subsequently had to be removed due to a failure of notification. Mrs. Brolly also noted the importance of the heritage aspect of the chapel building.
She also detailed the impact of the proposed NIE Networks works detailing how vehicle movement, the hydrology impact, landscape installation of poles/towers, construction and maintenance, changes to ground stability, traffic passing the site along the road, which runs along the chapel boundary and again reiterated the difficulty experienced by the third parties when topics are compartmentalised and divided up, expressing her hope that HED will undertake further investigations into the impacts noted, mindful of the chapel’s listed building status.

At this stage there was another battle to gain speaking rights, with the third parties ultimately not allowed to contribute further on this topic, and the commissioners moving to Mr. Orbison for NIE, who confirmed that the powerline was a “dedicated line for the DLG proposal”.

Commissioner Donaghey asked FODC if they retained any objections to the proposal in relation to any individual archaeological sites, with Conor Fegan replying that the Council was concerned with the impact on the ASSI from the proposals and stressing that cultural matters are in fact material matters, picking up on my previous submissions in relation to both the LDP and SPPS and expanding somewhat on these.

Following this, local man Pat Haughey spoke on the relevance of HE01 in the LDP, noting that the Green Road, as confirmed in the PRoW legal case, is a historical asset, and as such he was putting both DfI and HED on notice in relation to any failings by either party to consider and advised that proceedings should be paused at this juncture by DfI to fully investigate the matter.

A submission from an amateur archaeologist, who was present but was not permitted to give oral evidence by the commissioners was then presented, referencing the Historic Monument and Archaeological Objects Order 1995, specifically Part 2, Article 23 in relation to Departmental obligations to landowners relating to the excavation, preservation, maintenance and management of archaeological monuments. It was noted that that proposal from Dalradian was not compatible with archaeological preservation, and that no further evidence had been provided to make it compatible. On top of that, best practice methodology had not been used, and only partial assessments were carried out, meaning it failed every conceivable precautionary approach imaginable.

In response to the paltry “conditions” section offered under this topic, Dr. Amy Strecker, for SOS, identified that the applicant had not responded at any stage to the Human Rights concerns raised, and asserted that no mitigations can protect against the harm threatened by this toxic proposal. She noted that the avoidance of preservation and protection ultimately will lead to a permanent loss, and quite rightly queried how could local archaeology, language, culture and history be protected by any conditions recommended by the PAC? Dr. Strecker also countered the false narrative presented by the applicant of a perceived “consultation” process, noting that there was no meaningful engagement, only promotional activities were undertaken by Dalradian who, like the Departments, seem content to contribute the bare minimum.

Emma McAleer noted that the conditions related only to physical archaeological finds, and that there was no reference to intangible cultural heritage, a failing which was not only present in the conditions, but seemed to be evident through the week’s hearings and submissions at the inquiry.

Sean Clarke raised concerns when something goes wrong, citing an example of an accident at a scheduled monument in Davagh.

Lynda O’Sullivan reminded the commissioners that as well as protecting these sites of historic and archaeological importance, there is a duty to ensure access to these protected sites.

The last word went to Mary Brolly, who expressed concern that the conditions seem to be an accommodation of the proposal and not a mitigation or a protection of the inherent threat posed by these toxic proposals, and what the commissioners, and the Department should be working towards was an avoidance of this threat, rather than an accommodation of it.

And with that, proceedings and the topic of Culture and Heritage concluded.
There was no further discussion or information available on the outstanding timetabling issues and we were advised simply that we would all be back on 16th June for Residential Amenity and the subtopic of Noise.

Thanks again to everyone who attended, spoke up or sent solidarity over the course of the inquiry, and the week in question – we go again next week, with a reminder that you’re welcome to attend if you can make it to the Strule Arts Centre, Omagh between 10am-4pm. If you think you might like to speak at some stage during proceedings, please forward your name to Save Our Sperrins!
Go raibh mile maith agaibh! 💚

 

Day 21 Public by Name not by Nature here is the image to go along with it title it - The Sperrins — A Living Cultural Landscape

Day Twenty 

Hush now and bit of whist!

 

The day began with questioning on the historic Green Road, with the applicant keen to rely heavily on the botched FODC PRoW Case taken back in late 2022.

When the Commissioner asked if Historic Environment Division (HED) had any comment to make, Mr. McAleenan noted that their Statement of Case in 2024 highlighted new research from Paul Logue and Deaglan Ó Diobhlin. HED recognised the significance of the Battle of Formil and advised that this is researched. Dr. Paul Logue, who works in HED as a senior archaeologist, noted that ancient roadways may not be mapped, and that new routes may follow older roadways, evidence of that assessed archaeologically. Having reviewed the court judgment in detail he noted that it was very focused on documented evidence and historic mapping evidence, but he noted that other evidence like archaeological evidence should be considered.

Commissioner Donaghey queried whether it could be ruled out that the Green Road was a pre-eighteenth century road, to which Mr. McAleenan replied that it can’t be ruled out and that further assessment is required. The research paper from Logue & Ó Diobhlin highlighted the Annals of Ulster and other historical evidence.

Cormac McAleer, from Save Our Sperrins (SOS) noted that this was a sensitive topic and he tackled the claims made by the applicant referring to the cultural memory of the indigenous people, how Ireland was the only country in Europe that was colonised, and noted topical plans to “celebrate” the 250 year anniversary of the USA being “discovered”, referencing this “historic memory” in contrast to the native American population. Now, in 2026 the reality of people’s experience is over generations, which have been shaped denial of people’s history by colonial power, stemming back to the Penal Laws which divided the people brought into the country and the indigenous people.

Dr. Amy Strecker noted that within the Transboundary Consultation responses, the applicant’s contributor, Mr. Long, had misconstrued the Logue & Ó Diobhlin paper referenced, and relayed comments from the author in relation to this, including:

1. Gahan and Long rebuttal Section 3.2 page 7

This passage is incorrect and misrepresents the information within the Logue and Ó Doibhlin article. The Logue and Ó Doibhlin article describes a wider landscape of hunting, inauguration and tribal assembly within which there where particular natural and artificial focal points. The landscape extends eastward to Davagh Forest, is bounded in the south by Formil, in the west by the Owenreagh River and to the north by the uplands of the Sperrin mountains from Garvagh townland across Glenlark to Mullaghturk. While you could attempt to argue that there is a landscape core stretching from the Coneyglen to Drumlea to Casorna, Formil, Aghascrebagh and Crouck, the landscape is multi-focused and measures several kilometres across. Different parts performed different necessary functions. Attempting to divide it up as Gahan and Long have done is incorrect – just like the human body, its many parts function as a whole and to adversely affect one or more is to adversely affect the whole.

Logue and Ó Doibhlin do not suggest that the wild game was driven from Coneyglen through the valley. Logue and Ó Doibhlin argue that wild game was hunted and discovered within the wider landscape that ranges north, south, east and west of the application site and then hopefully driven towards a killing zone around Formil townland. The Owenkillew valley was the preferred route towards the killing zone, but where the game entered the valley would depend on where it was found and the skill of the hunters in driving it.

2. Gahan and Long rebuttal Section 3.2 page 7- 8

Figure 7 of the Gahan and Long rebuttal is misleading in that it omits features discussed by Logue and Ó Doibhlin and some of those shown in Logue and Ó Doibhlin’s Figure 2. Those are Damphcloy, Casorna, Ravine of the Stag, Hill of the Stag and Stone of the Stag. Adding those omitted features to Gahan and Long’s Figure 7 would likely have ringed the application site with features included by Logue and Ó Doibhlin as being significant.

3. Gahan and Long rebuttal Section 3.2 page 8

It is evident that a court or a commission can only make a determination based on the evidence or information presented to it. We point out that the Logue and Ó Doibhlin article is not mentioned in the County Court Judgment and so, we believe, was not considered by that court. As such it remains to be considered in that light.

We note that the historian and archaeologists who presented evidence to the court all appear to have decided that the road was created to connect the later 18th century settlements at Newtownstewart and Cookstown. Consequently, although they struggled to date it and noted that it appeared anachronistic for a road built at that time, they had to place it somewhere in the later 1700s. Logue and Ó Doibhlin point out that the route was already well enough used to be known in the AD 900s and 1200s as running through the area now occupied by the modern townlands of Casorna and Formil. As the Crockanboy Road is certainly known to have been created around 1800 then it is ruled out of being the earlier route referred to in the 900-1300 period. This leaves only the routeway now occupied by the old road that runs through the application site – referred to by Logue and Ó Doibhlin using the local term ‘the green road’.

We do not contend that the present iteration of that ‘green road’ routeway has to be exactly that built and then lasting since the medieval period, but we do contend that the present road marks a stretch of the ancient road and is likely to have remains of the earlier roads surviving along and/or adjacent to it. Logue and Ó Doibhlin argue that the ancient routeway once linked the Gaelic settlements at the important inauguration site of Tullahoge and its surrounds, such as Derryloran church site, with the Gaelic settlement at Newtownstewart, then called Baile Nua (meaning New town) and on to Gaelic settlements and church sites in modern day Donegal, Strabane and Derry. It was also the main route by which people entered the historic landscape described by Logue and Ó Doibhlin.

To believe that roads were only constructed after the Plantation period is a mistake. The earliest Irish laws recorded from the AD 600/700s onwards include passages to ordinary people having to build and maintain roads for their lords and that kings had to enforce road building and maintenance as part of their duties. Early medieval and medieval roads and tracks have been found on archaeological excavations in N. Ireland, such as on development sites at Steeple Road and Niblock Road around Antrim Town. Often these lead to and from existing modern roads suggesting that those too are of older date. A Bronze Age road led from a village of that date discovered at Corrstown, Portrush to the present day Corrstown Road. Archaeological excavation has also shown that the line of the modern Bonds Road in south Armagh runs exactly along the route of an Iron Age road from somewhere 100-90 BC.

4. Gahan and Long rebuttal Section 3.2 page 8

This statement again misrepresents the Logue and Ó Doibhlin article in that in the past there was, and there still is, a routeway from the site of Loch Beigfine across the area of Broughderg, Crouck and Aghascrebbagh to connect with the main routeway through Formil and Casorna. Logue and Ó Doibhlin believe that this was the route taken by O’Neill.

5. Gahan and Long rebuttal Section 3.2 page 8

The description is not questionable, Gahan and Long simply misunderstand Logue and Ó Doibhlin’s meaning. Logue and Ó Doibhlin’s point here is that, by the AD 1200s, Casorna was such a well-known place name (at least across the north of Ireland) for it to be used in a poem so that the reader or listener would know what location was being referred to. People knew the location because it was a point in the landscape where you turned direction during travel. In the past, the general area of the river confluence was easily identifiable, and travellers then knew exactly where they were upon the journey. Today Casorna townland is indeed 2km from the confluence of the three rivers. However, Logue and Ó Doibhlin’s point about the river confluence is that it undeniably lies within, and contributes to, a wider cross roads area of ridgelines and routeways via road or river. Whether you are travelling by road or by water this area is a crossroads where routes meet. A simple glance at a map demonstrates that Gahan and Long are incorrect to say that turning south here will not bring you to Tullahoge – all of the routes through this point to that Cookstown area turn south. Then the routes can swing round to the southeast and east to reach Tullahoge/Cookstown. The townlands we see today were surveyed for the OS maps in the 1800s. It is academically accepted that, throughout Ireland, we commonly find examples of modern townland names that referred to larger land unit/areas in earlier times. The cause of such naming and land unit changes is often bound up in conquest and the suppression of Gaelic language and culture. Place names are then left as relics and quite often their true nature goes unrecognised. Logue and Ó Doibhlin simply point out that this is the case with Casorna, in that the usage of the name has contracted over time to the area of the modern townland.

We also point out that in rebutting the Logue and Ó Doibhlin sentence about the turning point, Gahan and Long omitted the preceding sentence which refers to the Gaelic poet Gilla Bridghe Mac Conmidhe who wrote about the death of his then lord and patron Brian O’Neill in 1260. Throughout his poem, which we can date to c.1260 but certainly somewhere 1260 1272, Mac Conmidhe strove to link Brian with famous ancestors and triumphs of the past. In doing that, Mac Conmidhe wrote, ‘Proud were our people, when we fought the battle of Formaeil; Oh! high were our spirits, when the battle of Caisbhearna was won’. Here Mac Conmidhe felt confident enough in the known story and locations on the ground to use both Formaeil (modern Formil townland) and Caisbhearna (modern Casorna townland) as descriptors for the famous battlefield of AD 967. We ask that the inquiry recognises the importance of this fact as it places the application site within both the known routeway in the period AD 900-1300 and within the battlefield site of AD 967.

6. Gahan and Long rebuttal Section 3.2 page 8

We disagree, the wider historical landscape described by Logue and Ó Doibhlin includes the lands of the application site and those to the north, south, east and west. This makes a significant material change to the information that should be considered by the commission.

Shortly after this I attempted to contribute, but was talked down and talked over by the Commissioners, who seemed more intent in pushing on with the inquiry as opposed to actually permitting meaningful contributions from the public directly impacted by these toxic proposals, and those who had taken time off work to positively participate in the process. Thankfully, after an apology from Commissioner Donaghey I was permitted to conclude my submission which noted the failings of the FODC legal case, the pressure placed on a junior member of staff during that legal case coupled with the absence of any senior members of Council Staff, and their lack of expert witness engagement throughout that process. I also spoke of the theft of a Council picnic table which was sited along the Green Road back in June 2021, which mysteriously turned up a few days later just outside the Dalradian office in Omagh.

Following this Mary Brolly, legal counsel for SOS, again spoke to the Commissioners of the very real concern the third party protectors had of the view that they were being disadvantaged noting the difference of treatment across the board, and giving the example of a Dalradian contributor being allowed to read his already submitted statement unchallenged yesterday, despite this already being in evidence, and he was not challenged or spoken down to and contrasted this with the treatment we were being given.

Pat Haughey spoke next noting that although the Public Right of Way (PRoW) had been dismissed by the court as the legal bar had not been met, there was no judgment on the historical value of the Green Road, with this court case confirming that the road definitely existed in the late eighteenth century (construction dates from Dalradian estimated to be sometime between 1759-1765), and that there was no denying the significance of the road given the straight route it followed. He cited the Strategic Planning Policy Statement (SPPS) document, including 6.1 “Archaeological and built heritage assets…are all important sources of information about our past, and are often significant landmarks in the present townscape and countryside. This archaeological and built heritage constitutes an irreplaceable record which contributes to our understanding of both the present and the past and is an important economic resource. Their presence usually adds to the quality of our lives and promotes a sense of local distinctiveness which is an important aspect of the character and appearance of cities, towns, villages and the countryside.” He also referenced 6.8-6.11 of the SPPS which again highlighted the requirement of precaution from the Department (& the applicant), but which has seemingly been ignored to date. He stated that Department for Infrastructure (DfI) needed to consult with HED in relation to this, as they have failed to do so to date, claiming that this could actually cause the inquiry to be paused given the significance and severity of these failings. He referenced a number of legal cases, including Berkeley v Secretary of State for the Environment [2001] 2 AC 603,which noted that failure to conduct an Environmental Impact Assessment (EIA) renders planning permission unlawful, and a couple of others relating to an Environmental Survey being legally deficient as it failed to address the entire site and a failure with the screening of archaeological remains. Mindful of this, the takeaway from the FODC case is that the court proved this was a historic road and it is incumbent on DfI that they must speak with HED and make a call on this (& whether the inquiry can proceed).

Sinéad Ní Mhearnóg Uí Ghéibheannaigh spoke next on the focus of the inquiry, and the various legal and planning processes, on the English language and English language evidence, which is the direct result of a system of disconnecting people from their language, noting that history is written by the victor. She spoke how an understanding of the Irish language, the language of the area up until the mid-late twentieth century, is key to the entire understanding of our history, and how this feeds into what is “important”. The sense of one thing – in this instance the evidence brought through the course of the inquiry by the local community – as being inferior or of no use is not only disrespectful, but is to ignore vital and significant evidence being placed before the commission.

Sean Clarke, who was a founder member of Greencastle St. Patrick’s GAA Club noted that Derryloran Church, in Cookstown dated back to the sixth century, and that the historic Green Road was encompassed within the route from that location onto Strabane, Aileach and Gartan (site associated with St. Colmcille) in Donegal. His contention was that the road has been there since the sixth century, and he spoke also on the history of Cenél Conaill and Fallagh Fort in relation to this route.

Fidelma O’Kane, of SOS, reminded the inquiry that heritage significance is not confined to academic history, and noted concerns that the cultural value of the people and the area was being undervalued through the salami slicing our language, history, heritage and culture. She highlighted that the applicant has no understanding or grasp what any of this means to the local community. Indeed she queried what assessment they had actually conducted?

Mr. Long (Dalradian) identified that Dr. Logue, who had previously rebutted his take on the Logue & Ó Diobhlin submission, was known for his abilities in this particular field, indeed he acknowledged that he had previously used his work…before he incredulously again tried to reinterpret Dr. Logue’s work once more.

After his claims, Mr Elvin, legal counsel for DfI then claimed that DfI was an impartial body, before he decided to attempt to rebuke some of the legal citations from Pat Haughey – as someone who repeatedly claims to be independent this was a particularly strange tactic to employ at this juncture, and served only to raise more questions about the Department’s motivation.

At this stage, between the stage floor and the seats in the auditorium there were five or six individuals indicating that they wished to speak in response to the claims made by the applicant, but they were not permitted by the Commissioner, despite an appeal from Mrs. Brolly to accommodate them.

Discussion then moved onto the Mass Rock, Mr. Long claiming that it didn’t meet his specifications of a Mass Rock as it lay on the ground and wasn’t raised up, it wasn’t in a site of rich archaeological standing, there was no water source near the Mass Rock and there were no trees near the site.

Mr. Beattie, legal counsel for Dalradian said that at the time of purchase of the land Dalradian were informed by the landowner of the right of way issues, but were not informed by Mr. Charlie Ward about the Mass Rock on site.

Mr. Orbison, legal counsel for NIE Networks said that the Mass Rock was 2.8km from the nearest proposed powerline/pole, so he believed that there was no impact on the powerlines proposal.

Mr. McAleenan advised Commissioner Donaghey that although the Mass Rock was not a recorded site, it was currently under assessment so they cannot offer an expert opinion at this stage. When he noted that they had yet to visit the site Commissioner Donaghey asked, somewhat incredulously given the duration of the application process and concerns raised throughout, why not, when was the assessment process commenced, why was it not carried out compliant with due diligence prior to the start of the inquiry? Mr. McAleenan said that they were unsure of the exact location of the Mass Rock, and that DfI Roads provided a location in late 2025. This was added to the log by HED, with a site visit planned for early April 2026, prior to the public inquiry, but at this time it was “challenging to gain access” to the site. Commissioner Donaghey asked what process had been used by HED, with Mr. McAleenan saying that an evidence gathering process had been commenced including sourcing and investigating historical maps and the oral tradition – evidence that had been submitted to the inquiry was being considered. He also referenced a small, bonded off location at the edge of 3rd/4th Edition OS Maps which was on the edge of the parish boundaries, noting that this would be in keeping with post-medieval sites or Mass Rock sites. He also said that it was worth noting that other Mass Rocks have only been preserved through folklore and oral history/the oral tradition. Penal sites were not the focal point of early maps.

Another third-party objector noted that during the course of reclamation work on the site, Mr. Ward had allegedly filled in the headwaters of the Pollanroe Burn, which would have been located close to the Mass Rock (one of the specifications noted earlier by Mr. Long). Indeed, it was noted that in an interview with a farming publication Mr. Ward even spoke of the fact that there was a Mass Rock not far away from his cottage.

Mr. Pat Haughey spoke how the siting of the Mass Rock was in keeping with other similar sites as it offered the people a vantage point where they could see any oncoming soldiers/red coats during Penal times, and he spoke of the implications of losing the site, and losing access to the site in breach of Article 9 of the European Convention on Human Rights (ECHR).

Dr. Amy Strecker then spoke with reference to Dr. Hilary Bishop, who had been referenced as the leading expert on Mass Rocks by Mr. Long, noting that Dr. Bishop’s previously referenced research focussed on County Cork, which would differ to Co. Tyrone for obvious reasons. She also noted that the Crockanboy Hill Mass Rock actually appears on Dr. Bishop’s website, https://www.findamassrock.com/tyrone1

She also pointed out that the applicant’s statement that there was no church record of the Crockanboy Hill Mass Rock shows a fundamental lack of understanding about these sites. She noted that early cartographers has no cause to publish Catholic places of worship by putting them on maps, for fear that it may be seen to give them relevance. Mass Rocks, it was noted, ensured the survival of the Catholic faith and are an integral part of the religion today. They provide a sense of community and belonging which supports social cohesion. Right of access to these sites, Slí an tAifreann, is as important as the Mass Rock site itself, and that as part of our “living heritage” to rely or focus on written records is missing the point entirely.

Dr. V’cenza Cirefice confirmed that extensive research she has undertaken in this very area has documented this as an active site.

Fidelma O’Kane said that she heard from a reliable source that in the early 1980s Fr. Shields, the then PP had said mass at six Mass Rocks in Greencastle parish. (This number was reflected in the studies undertaken by Dr. Bishop to date, who noted that although there were approx. 100 Mass Rocks recorded in Cork, over 400 had been found as part of her initial studies.)  Ms. O’Kane continued that Fr. Hasson had said mass at three Mass Rock sites in 2012, 2013 and 2014, and that it was his intention to do likewise at the other sites, including Crockanboy Hill in 2015, before he was moved to another parish. He sadly passed away in January 2026.

She noted that, having visited the site the previous evening, that the lock and chain was back on the gate, once more denying access to pilgrims wishing to visit the sacred site. She said that only last week Pope Leo had, (to mark the 11th anniversary of the late Pope Francis’ landmark environmental encyclical Laudato Si’)  visited a place in Italy now dubbed the Land of Fires (once called “Campania felix,” Latin for blessed or fruitful countryside), where illegal toxic waste had been dumped causing an ecological disaster and a health crisis. The Pope noted how many people had suffered for the benefit of a few. Indeed, some of Pope Leo’s words could be aimed directly at the Departments supposedly looking after us – “There is always a subtle convenience to be found in resignation, in compromise, and in postponing necessary and courageous decisions,” and “Fatalism, complaining, and shifting the blame onto others serve as a breeding ground for lawlessness and mark the beginning of a desertification of consciences.” And, indeed, to the protectors, dubbed the “third-party objectors” by the inquiry/planning process here: “I would like to thank those ‘pioneers’ who, through their courageous commitment, were the first to denounce the ills plaguing this land and to draw attention to the obscured and denied reality of its poisoning. I am thinking, in particular, of the members of environmental associations. We all know that we must stand guard over the health of creation just as we stand guard over our own front door, and that we must resist the temptations of power and enrichment linked to practices that pollute the earth, the water, the air, and our shared life.” Ms. O’Kane concluded by saying that the whole area was described as ‘sacramental with a sense of transcendence’ and ‘everything belongs to God and we have a duty of care to those around us as well as to the environment.’

Marella Fyffe, Chair of SOS spoke to note that the Mass Rock had survived the Penal Laws only because the people kept going there, and she posed the question to the Commissioners – will it survive this new, toxic threat? She again highlighted the importance of the lived tradition and heritage of the local community.

Cormac McAleer noted that, on Day 20 of the inquiry, and having sat through vague references to phantom feasibility studies, bespoke modelling, secret spreadsheets and numerous other missing, incomplete and inaccurate submissions from the applicant, we are now to believe that they have concrete specifications for what constitutes a Mass Rock? He said that should tell us everything we need to know about this company and their intentions.

Dr. Peadar Mac Gabhann recounted documented written and oral evidence of Mass Rocks and their importance to the area, citing a record from a Michael Keenan dating back to the early twentieth century, and linking the presence of a rowan tree to the site of the Mass Rock in this instance.

Fr. Joe McVeigh spoke further on the impact of the Penal times, and how the threat to religion and those who practice it continues to this day, even relaying a documented story where he was approached by a man during Mass who said he works for Dalradian Gold in early 2019.

As Fr. Joseph McVeigh relayed to the inquiry, and in a report shared with Jude Collins:

“I was invited to attend and speak to the Public Inquiry in Omagh 

3 June 2026  by the local group ‘Save Our Sperrins’ (SOS). This Inquiry was set up by the Department and was supervised by three Commissioners who are supposed to be impartial. One of them acted like a cross schoolteacher dealing with unruly children shouting out threats and staring.

One of the issues raised at the Inquiry by the SOS was the presence of a Mass rock in the townland of Crockanboy hill overlooking Greencastle on the land where the Gold mine is said to be situated. This land around the Mass rock was always considered a sacred site in the local area. It was a place of prayer and pilgrimage. During the Inquiry today, a speaker on behalf of Dalradian denied the existence of a Mass rock claiming that there was ‘a stone slab lying on the ground which was hardly a place for an altar’. He claimed there never was a Mass rock there since there was no water nearby and it was not marked on any map.

I was asked to say a few words about the significance of Mass rocks in Irish history and culture. There were so many speakers that the time allotted to each speaker was limited.  I had done some research on Mass rocks in County Fermanagh. There are 60 known Mass rocks in my native county. These were initially called ‘Mass Fields’. The whole area was regarded as sacred or sacramental. There could be a local stone used as an altar or there might be a portable structure used for an altar.  They were also known as ‘penal altars’ as they were used as a result of the Penal Laws (1650-1755). Sometimes there were Holy wells in the vicinity.

These are some of my remarks to the Commission Inquiry on Goldmining in Tyrone held in Omagh on 3 June 2026.

“In 2016 in the month of June -10 years ago- Pope Francis issued a letter LAUDATO Si reminding all people of good -will about the sacredness of the earth and the water and the threat to our planet Earth by Mining and industrial farming.

I was inspired by the words of Pope Francis in his Encyclical Laudato Si. I am inspired by the example of the SOS campaign.

I am totally opposed to the Dalradian Company from Canada-USA mining in the Sperrins –for a number of reasons:

1. Their mining will do untold and permanent damage to the environment. This part of Ireland is an area of outstanding beauty with a rich cultural and religious heritage.

2. They have divided the community with their plans to blast 700 metres deep into the earth for gold and their enticements to locals and unrealistic promises of jobs and prosperity for the whole area, Dalradian has already damaged the cohesion of this community in the Greencastle-Gortin area of Tyrone. They have undermined the age-old sense of community and neighbourliness/muintearas. It is the classic colonial tactic of ‘divide and conquer’. Preserving the community and protecting sacred places is one of my important duties.

It is clear to me that Dalradian has no respect for this community and its heritage and cultural history and the health and well-being of the people young and old who live here and the health and well-being of the generations to come. 

The Mass rocks are a reminder of the Penal times in Ireland in the 1600s and 1700s-when the British banned Catholics from attending Mass and banished priests from the country. Catholics devoted to their faith had to gather for Mass in remote areas in order to be safe. Some were killed for attending Mass and many were banished from the country. This is part of the folk memory and is very important that we remember and never forget.

Dalradian has no interest in the Christian heritage of this community. Their only interest is making money – profit.

3. We must ask ourselves at this time -what kind of world and what kind of community do we want to leave after us for future generations. This community inherited a rich legacy in terms of stories and songs, faith and neighbourliness that must be preserved for future generations.

The intention of Dalradian to mine for gold  in the Sperrin Mountains is a real threat to the health and well-being of this community and to the health of present and future generations. Poisonous chemicals are used in the drilling and processing of the rocks to extract the gold.

They have already admitted that they would be using 40 thousand tons of explosives to extract the rocks- if they get planning permission. 40-thousand tons of explosives!!!

My opposition to Dalradian is not just about preserving the Mass rock in Crockanboy or the other five Mass rocks in the area. My opposition is about preserving a way of life -a priceless heritage, a religious/faith tradition. The mass rocks are stones but it is what they represent and symbolise that is important. Dalradian does not understand this reality nor do they care.

This Dalradian Company are destroyers of the Earth and of this community and others throughout the world. They should not be given planning permission to continue the destruction of this beautiful and culturally rich  environment. For those materialistic mining companies, Mass rocks have no value and the countryside has no value – and the sense of community that has existed for hundreds of years has no value. They do not seem to realise that to the local community these are far more precious than any mineral. 

I believe the late Pope Francis is a voice for the voiceless. He is the voice of sanity and reason crying out in this insane and materialistic world. I am following his example and speaking out here today for an end to gold-mining in the Sperrins and on behalf of the local community for the health and well-being of future generations who will live here.

I found the whole experience at the Public Inquiry intimidating. After seeing a man there who was working for Dalradian sitting staring at everyone who came in through the front door of the Strule Arts Centre in Omagh, I did not feel too comfortable. It was just as intimidating inside the theatre where the Inquiry is taking place. Dalradian and all their barristers and lawyers on one side and the Third parties on the other side. There was going to be no meeting of minds there. The three Commissioners did not inspire confidence that the SOS would get a fair hearing. The odds were stacked from the beginning.

We are sure that right is on our side and Dalradian is completely wrong in what they are attempting to do in the Sperrins –an area of outstanding beauty. They should never have been allowed in here in the first place –but even now we hope that their attempt to gain planning permission to destroy this beautiful and historic countryside in Tyrone will be rejected.

WE SHALL OVERCOME!”

Before we broke for lunch, and mindful of previous attempts by the applicant to misinterpret expert testimony, attention was drawn to Dr. Bishop’s profile on the Liverpool John Moore’s University website, where she notes “My research is vital for the identification and subsequent exploration and documentation of Mass sites in Ireland and I have been integral to the identification and protection of threatened sites including…Crockanboy Hill (Tyrone) Mass Rock, threatened by infrastructural changes and ownership challenges”.

After lunch we heard from Liam Monaghan, a retired Primary School Principal with an interest in local history and religious affairs. He explained how Mass Rocks arose in a critical period of Irish History, and stressed the impact of the Cromwellian campaign and the Penal Laws. He spoke of Laudato Si’ and it’s reference to a technocratic paradigm that seeks to reduce everything to an object to be dominated, and noted how this was particularly relevant, as technocrats believe if something doesn’t conform to a specific ideal then it must be discounted. Our history and heritage, the importance of the past – these things are unquantifiable, they are essential to who we are as people.

He concluded by remarking that, having worked for over 30 years in senior management in a Primary School, that if he had witnessed any of his teachers treating schoolchildren the way the commissioners were treating the third party protectors they wouldn’t get away with it.

Local man Martin Conway spoke how his father, Francis, had often during his lifetime talked about praying at the Mass Rock in question and said it’s existence could not be questioned.

A number of Dalradian supporters, Monica Coyle, Sean McCrory and Veronica Teague were then introduced, although they seemed to struggle with reading their prepared statements.

Again, at this juncture, a number of people indicated that they wished to speak, but they were not permitted to do so and with that we moved onto the topic of the Irish language, heritage, culture and linguistic themes.

This began with HED confirming that they had no policy remit regarding linguistic heritage and DfI asserting that these issues “were not raised in either the SPPS or Local Development Plan (LDP)”, which was later challenged.

Emma McAleer, a local mother of two spoke to register her shock and disbelief that there was no department or statutory body present to advise on the themes noted, given their importance and specialist natures.

Sean Clarke spoke on the importance of place names, field names and local historical sites by referencing the fact that the site which is home to the Mass Rock had spent over 100 years in the hands of absentee owners who didn’t live on the farm and were not from the area, which would explain why they didn’t know about the religious site it houses.

Dr. Peadar Mac Gabhann reflected on the work of Professor Emyr Estyn Evans of QUB who researched the symbiotic relationship between land and people, noting that the Muintir Luinigh were here since time immemorial, with language written since the fourth century (recorded on the Ogham Stone), and that language surviving into the 1980s, with oral recordings taken in 1930 and again in 1950-51 of the unique dialect spoken here.

Dr. Amy Strecker spoke of the threat to the language being a violation of cultural rights, and referenced both a UN Committee who identified that whilst compliance mainly lies with the applicant, governmental departments also bear a responsibility to uphold such rights, and the UN Special Rapporteur on Cultural Rights. She spoke of the importance, and absence from the applicant, of linguistic research, and referenced the five year research project carried out by Dr. Cirefice. She used the example of the Green Road, which was not solely a PRoW, but an important heritage site. None of this has been considered by the applicant and it runs contrary to the lived reality of the local community. She detailed the cultural and language revival, and the important role of cultural tourism, and concluded that a toxic mine is not compatible in any way with local, sustainable development of the area.

Dr. V’cenza Cirefice added that to say that a mine will not stop anyone from speaking a language relies on the assumption that an indigenous language is just an object that can be displaced without consequence to the speaker or to the language itself. It relies on the false assumption that language is just a collection of words or sounds or signs that people make, and that its use is not wholly dependent on context. This is an outdated and irresponsible argument given what we know about the complexity of indigenous language as a relational practice, and the environmental degradation that accompanies the mining industry. Indigenous languages are complex systems, part of biocultural memory, about the relationship between people and nature – or their landscapes and places. Language is intimately tied to the land.

Indigenous languages are reflections of millennia of human communities interacting with the natural world. From Arctic peoples and how their knowledge of winter weather to the Sámi have an extensive vocabulary related to reindeer. Ojibwe country in North America, there are important teachings that are often presented as sacred stories, dependent totally on the environment to be passed on. It’s the same with Irish.

There is also a growing body of academic evidence that access to one’s indigenous language has better physical health outcomes, academic outcomes, community wellbeing, and lower risk of suicide.

Research also documents the overlap of areas of high biodiversity and linguistic diversity

Terralingua produce maps showing the overlap of biodiversity and linguistic diversity

https://terralingua.org/biocultural-diversity/

Extractivism, including mining, is well documented in the academic literature for causing ruptures between people-nature relationships, which in turn disrupts local knowledge and language systems. Any change to the environment, even slight, will impact on an indigenous language.

Slight changes to the landscape can interfere with animal migratory patterns, or shorten/lengthen a given plant’s reproductive window, change the pH of the soil, shift the patterns of water runoff, etc. These environmental changes affect the relevance of the knowledges bound up in Irish. Every time we put the environment at risk, we put the language that is linked to that environment at risk.

The problem is, when Gaeilgeoirí say they want to protect their language, they don’t mean just ‘the words’. They mean they want to protect the knowledges and relationships that are embedded and made real through the use of the language. They are talking about lifeways that have kept people alive on this island.

Participants in her study highlighted the Irish language frequently, such as Irish place names that encode ecological and traditional knowledge about place and make up intangible cultural heritage and sense of place, identity.

Likewise the Irish name brought up by participants for the local area around Dalradian’s proposed site is Seiscaenn siul “the moving bog”, and comments during the research project included:

When we were young Greencastle was called Seiscaenn siul […] It’s moving bog yeah, remember recently there was bog moved, the Meenbog, over in Donegal over the border with Tyrone, and it was awful, the bog went into the river and all”,

“Yeah I didn’t know that this area was called Seisceann siúil ‘moving bog’. How anyone could think they could do anything to a moving bog, it’s written out in words for all to see and you just don’t touch a moving bog, talk about the arrogance of man”.

As Kimmerer (2020) explains, there is a “grammar of intimacy”, in the Potawatomi language, likewise, it was pointed out by participants that there was an intimacy with place in local names and the Irish language.

In her research it became clear that language was rooted in place and “a lens through which people view themselves and their relations with other people and the more-than-human world” (McCarty et al., 2021: 345).

Dr. McGabhann agreed, noting that the local inhabitants feel that intrinsic link between humans and the place they live in, something which was supported by academic research.

Pat Haughey noted that there was no townland or fieldname research whatsoever carried out by the applicant, as well as no Irish language assessment, which meant that we were in danger of losing all of these.

In rebuttal of the comment made by DfI I noted that both the SPPS and LDP made specific reference to cultural heritage, citing two examples including Table 1 – Strategic Objectives (p.30 of the LDP) which notes, “Our outstanding natural environment and built and cultural heritage is sustainably managed and, where possible, enhanced” and p.97, 6.272 of the SPPS which references “cultural heritage properties.”

Fidelma O’Kane reiterated that land and placenames are routed in the language and have a tangible affect on expression.

Sinéad Ní Mhearnóg Uí Ghéibheannaigh spoke powerfully on the direct impact of the Dalradian planning proposal on the local community through her involvement in Óige Muintir Luingh, which she had set up as an Irish language summer camp in the Greencastle area. She noted the negative impact on the language and how she strived to teach in an immersive fashion, noting her belief of “Tell me and I forget, teach me and I may remember, show me and I won’t forget”. She detailed how the language was a cross-community resource, making reference to her own ancestors on the 1901 census, and talked how Dalradian had managed to sow division in a previously strong, united and unbroken community. She made reference to innovators like Sean Clarke (founding the GAA club), John Donaghy (An Creagán) and other pioneers for cultural preservation and noted the impact from changes such as road names taking over from townlands when using addresses. Dalradian’s claims of no impact, she concluded, is an out and out lie.

Again a number of speakers indicated that they wished to speak, but they were denied the opportunity to do so.

Deaglan Ó Diobhlin, one of the authors of the ‘Landscapes of Hunting and Assembly in the North of Ireland’ detailed how knowledge of archaeology and language were the bedrock for any understanding of place, and that this was the process he and Dr. Logue had practised. The Irish language is a crucial aspect of cultural heritage and could be very easily damaged he cautioned, mindful of what is being proposed.

A statement from a Conor Scallon, (from Gortin or Fintona?) was then read out by Mr. McAvoy for Dalradian.

Once again it was notable that whilst Mr. Beattie for Dalradian was permitted the last word, Dr. Strecker, who had indicated she wished to speak, was not permitted to do so at this juncture.

Mr. McAleenan of HED advised that they had touched on oral history in their research, specifically in relation to archaeological sites “that warrant preservation”.

Dr. Peadar Mac Gabhann spoke on the tradition-bearer, Páidí Láidir Mac Culadh, who passed away on the 26th July 1958 and his obituary was noted in the press recounting the 78 year old Patrick McCullagh, the last native Gaelic speaking story teller in the six counties, who had been interviewed variously by both the BBC and RTÉ, and was the last plier in Europe of rush harness making, with examples of his master craftsmanship still in evidence in the National Museum in Dublin today, made with rushes pulled in The Sperrins. It noted that he learnt Irish from his Grandfather, who lived until he was 107, and his mother who survived into her 90s.

The landscape inspires me, confirmed Dr. Mac Gabhann, we have a connection with people and place and that connection isn’t false or phony. The land remembers.

Dr. Amy Strecker, an expert for SOS, again reiterated that the concerns raised were not just about physical access, but also about the language revival and future development of the area, that this application would foreclose and preclude. Mr. Beattie misunderstands this she noted, advising that this was a material consideration for the planners and the Commissioners to take on board when making their determinations. She referenced a House of Lords paper on the UNESCO Convention, which recommended a lift, not list approach, and advised that was what was required, but ultimately absent, here. She pointed out that this was incumbent on the state, and that Mr. Beattie was so far off the mark with his assertions in relation to this topic.

Dr. V’cenza Cirefice concurred with this, before speaking further on the inter-species and more than human aspect involved in the proposals, before another contributor noted that the proposals conflict with the Sperrin Partnership project undertaken by the councils covering the Sperrins AONB.

Emma McAleer noted that these proposals were simply “insane” in a rural area where resources are being lost – youth centres, primary schools, GP practices, etc. She noted the structural changes in rural areas due to decades of underinvestment and lack of support and stated that regenerative tourism is one realistic pathway to improve societal and economic well-being. We should be reinforcing community pride, which should be promoted not marginalised, and she expressed her concerns on the threat posed by this proposal, which she said will be a high risk to those seeking rural or community funding going forward. Contrary to the National Lottery Heritage Fund’s goal, we are not saving heritage but damaging heritage through this proposal.

John Donaghy, Manager at An Creagán Visitors Centre noted that An Creagán opened in 1994 after approx. 10 years of development work within the local community and now, 32 years later it is established and running archaeological tours around the area. If this toxic mine an processing plant are given the go ahead it will devastate the product we offer. He also detailed how 30+ employees at An Creagán were directly at risk as a result of this proposed “development”.

Sean Clarke spoke as a farmer, noting that for a long time this was the only work there was in the area, and that all or a substantial part of family income came from farming. The local practice of family farms cared for the land as custodians of it, and as a follow on from the history of farming in the area, the GAA Club has now become a social hub where everyday, local people congregate. It was a site core to the community and to community interaction, which was now directly at risk from this toxic proposal. He also spoke about a visit to Cornwall he had made, in reference to a point raised by one of the Dalradian supporters, and he described it as “a devastated landscape”.

Lynda Sullivan spoke on the importance of oral history, detailing her experiences when working against extractivism in Peru, and the reflections she saw with the campaign in The Sperrins. What oral history passes down is what other generations learn she noted, and that when a landscape is changed it is lost. Here we are being presented with a living guide to the place, and it’s important that this is not ignored.

Marella Fyffe spoke, much to the bemusement of the Commissioners, on the plight of the fairies, asking “What’s going to happen to the fairies?” who are said to roam the area in question. They’re not present, so we can’t hear that evidence today was the response from Commissioner Donaghey.

Pat Haughey pointed out that Dalradian treat folklore like it’s portable – that’s not how it works.

I spoke on the threats posed to both the GAA Club and Grounds, and to the local Primary School by this toxic application, noting that the strength, determination and knowledge gained by the community as a result of what’s been forced on us could ultimately lead to a positive outcome, and referenced the Gaeltacht project undertaken on the other side of the Sperrins in Slaughtneil as one potential outcome that could be taken on by the community, where language, folklore, history, culture and sustainable, regenerative tourism could be the focus.

Mary Brolly summed things up by noting that what was proposed was not restricted to one confined site, but to a shared cultural landscape, and that those who were voicing their concerns to these toxic plans had no financial interest in what is being proposed, but they do have a heart in it. There remains concern that the applicant hasn’t assessed the landscape as a whole, that the very real threats posed have been reduced or undermined by the applicant, and a reminder was given in relation to the cumulative impact of these devastating plans – don’t cut down the fairy trees, don’t mine their mountain.

Counsel for Fermanagh and Omagh District Council at this stage spoke in relation to the Sperrin Partnership Management Plan, as well as to references within both the LDP and SPPS (4.38 & 6.61), which DfI should be aware of.

With that, and a brief outburst from the Dalradian KC, we concluded for the day – see you all again bright and breezy tomorrow (Thursday) from 10am in the Strule Arts Centre, Omagh.

Thanks so much to everyone who has contributed, supported, spoke out and sent solidarity to date, it keeps us going and continues to inspire!

Aerial view of the Mass Rock
Day Nineteen 

Can You Measure a Sense of Place

Following an identification of all parties intending to speak and prior to Cultural Heritage questioning commencing,  a third party objector Niall Mc Aleer asked the Commissioners if opportunities to return to unresolved issues within the Roads element of the inquiry would be provided at a later stage in the inquiry, highlighting the visibility spay issue at the Camcosy Road access to the explosive store as an example.  Commissioner Donaghy noted that this matter was closed out last week, with the objector requesting that the Commissioners revisit their notes on the subject as third parties understood that the sub-standard sight-line in question had not been responded to by DfI Roads – who had advised this was being checked rather than confirming any dimensions. 

 

Commissioner Donaghy outlined the topics to be covered under Cultural Heritage: Applicant’s assessment methodology; sense of place + cultural identity; archaeological issues; ASSI/ Beaghmore Stone Circles; Cumulative assessment; Green Road (historic significance of route); Linguistic Heritage; Folk, memory + associative heritage; sub-surface archaeology (& peatland under same); Human Rights considered intrinsic throughout, with a  catch all question at end.  Commissioner Donaghy advised there was no need to cover everything submitted in writing, noting a pressing need to conclude this section in the three days allowed.

 

Q1. Commissioner Donaghy asked applicant to respond to third party views that the Applicant’s cultural heritage assessment methodology is flawed; understanding of heritage outdated (physical assets only); & failure to adopt correct HIA.

 

Mr Beattie (Counsel for Dalradian) referenced the written methodology as an accepted approach, and did not accept that this was outdated, too narrow or inconsistent with current standards. 

 

Mr Long (DGL Consultant: Gahan & Long) stated that the written methodology approach considered accepted as HED did not challenge this, noting that a HED guidance document on ‘setting’ was followed.  He noted that the scope of the study was set out in 2017 ES submission (Appendix A2: P.15 of 17 & Appendix A1. Section 2.10 P.64 of 116).  Mr Long proceeded to read from the submissions, noting desktop exercises undertaken on behalf of DGL.  Historic records reviewed, review of historic monuments within 1-2km of the infrastructure site, review of industrial archaeology within 1-2km of site, review of historic gardens over site area & 1-2km of site boundary; review of documents held by PRONI (for development area only); Review of Ordnance Survey photographs (for development area only); Detailed ‘walkover’ survey to assess archaeological assets ‘both unknown & known’.  Without identifying any survey tools beyond visual observations this statement raised questions.

 

Mr Long drew the Commissioners attention to a HED response to the PAD consultation dated 24/02/16 noting they were content with Gahan & Long’s cultural heritage assessment.

 

Mr Long asserted G&L assessment complied with HED April 2019 guidance document on Archaeological Works in the Planning Process and drew comparisons to 2021 CiFA, Principles of Cultural Heritage Impact Assessment in the UK document in TBR15 (P7) to refute outdated methodology challenges: referencing 2 principles of Cultural Heritage: A) understanding assets, describing + attributing importance and B/ understanding the impact of change.  Mr Long then referenced use of 3km search beyond the site boundary, as part of a desktop survey exercise, noting 34 known archaeological sites identified (8 considered regionally important), 2 listed buildings, 32 industrial heritage sites & 9 vernacular buildings.  Grading of sites from world heritage sites, to scheduled monuments and lower classifications set out in ES Appendix C15, Table 3 P.14, with severity of change levels included in Table 4 P.15

 

Commissioners then intervened to query references to both drilling and tunnelling within the Environmental Statement (ES) and how the impacts of this were assessed.  Mr Beattie (DGL) stated that no surface drilling was proposed in the exploration area, all underground (not to come within 100m of surface).  Commissioners recognised this is a contrary position to what was proposed in ES and pressed for clarification.  Mr Beattie on behalf of DGL, thought this was clear – noting that any sub-surface activity will not come within 100m of surface.  Dr Gordon (Turley for DGL) referenced an update to mine design parameter statement in TR1 Project Overview, Annex A, Section 13, Exploration Methodology P.27 (which notes ‘The exploration drives/ tunnels will be excavated into fresh bedrock below the transition layer of weathered rock at a depth of 100m or greater’.)  Commissioner Mc Parland queried the contradictory content across the submission, asking does it expressly say no drilling or are you inferring it Dr Gordon?  Dr Gordon reiterated the statement, which inferred this outcome.  Commissioners voiced their intentions to consider this matter further between themselves.  References to drill bays & drill holes were noted in Appendix E9, Project Description Update (October 2020).

 

Mr Beattie (Counsel for DGL) attention to DfI’s Draft Conditions without prejudice (contained within DfI SoC on Main Mine Application) MD8 Mine Design Statement, MD9 Mine Development Plans & MD10 Retrospective mine survey of work already done as a means to control this, adding if this is not of interest, we would be open to a (standalone) condition.

Mr Long (DGL) considered his assessment to also address intangible cultural heritage, referencing CIFA July 2021 guidance & HED guidance Guidance on Setting and the Historic Environment (Feb 2018).  His explanation cited points within this HED document but failed to give any account of how these were applied/considered or discounted in the context of this application.  2.3 The Extent of Setting; 2.4 Aspects of Setting – Settings can be complex and multi-faceted – any assessment of the setting of a heritage asset should include, as a minimum, consideration of the following aspects, although other, often intangible aspects such as ambience, may also be considered: 2.4.1 Physical, 2.4.2 Visual, 2.4.3 Functional.  Functional aspects of setting include the aesthetic, architectural, commemorative, historical, social, spiritual, symbolic, technological, traditional knowledge and/or other tangible or intangible values associated with human activity.  Mr Long noted CIFA (2021) doesn’t provide specifics on how to assess intangible cultural heritage in response to third party challenges this was not adequately addressed.

 

Attention then turned to physical views at ‘regionally important monuments in the search area’, Mr Long stated there was no intervisibility between monuments and the infrastructure site & Owenkillew valley.  Mine infrastructure site not visible at monuments, including Beaghmore Stone circles ASSI in the Applicant’s assessment – ES 2017, C15 Appendix 6, Pages 66-73 referenced.

 

Mr Long understood the International Council on Monuments and Sites (ICOMOS) 2022 Guidance and Toolkit for Impact Assessment applied to World Heritage Sites, noting only 4 sites on the island (Brú na Bóinne , Skellig Michael, Giant’s Causeway  & Gracehill Moravian Settlement) and did not believe this an appropriate standard to be applied in his assessment. 

 

Mr Orbinson (Counsel for NIE) was invited to speak next, noting broadly the same issues highlighted by third parties on Mr McGonigle’s (John Cronin Associates) CH assessment.  Mr Orbinson noted the assessment had been found adequate by HED; drawing commissioner’s attention to methodology set out in section 2 of RPS Technical Report 4 (Appendix A – Heavy Duty Powerline App) and Chapter 6.2 Archaeology & Built Heritage in DfI SoC for Main Mine Application.

 

Mr McGonigle (Archaeologist for NIE) advised that he completed a desktop survey of all archaeology and cultural heritage sites within 200m corridor of powerline route; assessment of all heritage monuments within 1km of proposed route; sites & monuments records; industrial heritage; defence heritage; historic gardens; historic cartographic surveys; and previous excavations.  A field survey – route ‘walkover’ following alignment of proposed powerline was carried out and identified 2 further potential archaeological sites nearby.  Assessment conducted to consider impact on setting (HED guidance followed), this involved creation of photomontage views.  No archaeological sites records in SMR (Scope & Methodology Report?); 5 industrial heritage sites recorded within study area (200m route corridor), 3 scheduled monuments within 100m corridor, with 2 further possible sites found as noted above.  Mr McGonigle noted the scale of mitigation measures were set out within Cultural Heritage Report and were agreed with HED to be adequate.

 

Commissioners then invited HED to respond.  Mr McAleenan (HED Senior Archaeologist) noted that in terms of adequacy of scope, in 2017-2018, HED did agree to the proposed ES scope, however 8-9 years later, ‘we would consider some elements too narrow.  Our approach to assessing large scale development, & other extensive developments along with recent policy changes (have) moved beyond individual sites to consider wider settings, broader& more landscape scope assessments, intervisibility, wider landscape relationships… scope of assessment now expected to locate at a larger geographic scale.  We recognise this thinking has evolved in recent years, since 2017-18’. 

 

Commissioner Donaghy pressed Mr McAleenan for specifics/ professional recommendations around this.  Mr McAleenan noted that in terms of assessment scope, where 3km zone around a development site may have been accepted in 2017, nowadays studies should extend 10-15km beyond development limits to ensure a comprehensive and robust assessment.  On other aspects Mr McAleenan noted impacts on peatland – how hydrology affects that, impacts of peat removal on archaeological survival.  HED would expect detailed photomontages & detailed wireframes accompanied with explanations to clarify what is being shown, so all stakeholders are clear on the impact on wider historic setting.

 

Commissioner Donaghy queried have these concerns been relayed to the Department & Applicant previously.  Mr McAleenan stated that the Peatland aspect had been clearly relayed to the Applicant and noted further information was requested around settings issue has been raised in Department’s SoC.

 

Dr Strecker (SOS Expert) questioned the methodology used by Gahan & Long: noting that their first report was based on CiFA guidance, which set out guiding principles rather than being prescriptive.  This wouldn’t be as methodologically robust as ICOMOS document referenced by HED. 

 

Dr Strecker drew attention to paragraph 1.10 CiFA Principles of Cultural Heritage Impact Assessment in the UK (July 2021), which notes ‘this document sets out a language and framework for understanding and assessing the effects of a proposal on cultural significance. This document does not seek to offer prescriptive methodological guidance on CHIA (Cultural Heritage Impact Assessment). Given the breadth of what can be regarded as cultural heritage assets and the diversity of potential change that could come about from a range of different proposals, there is no ‘one size fits all’ methodology to CHIA.’

 

Cultural Heritage – ‘setting can transcend’ – spiritual values, literature study/ review References are made to these aspects but these were not assessed within the Applicant’s CHIA.  Tyrone Folk Quest by Michael Murphy, recognised as the seminal work on folklore in Tyrone not mentioned under CHIA, no consideration of Irish language, no community consultation as part of impact assessment.

 

For landscape of this sensitivity adoption of a robust methodology would be expected even if it is not a World Heritage Site.  Dr Strecker noted that ICOMOS (2022) standards are widely used in assessments and are taught at Masters Level in UCD as the appropriate level of consideration for regionally significant areas/ area of archaeological interest.

 

Dr Strecker noted that Mr McGonigle references 2011 ICOMOS methodology in his original CH Assessment in association with the Powerline application, however when this assessment was updated in 2024, it doesn’t mention the 2022 ICOMOS guidance.  Dr Strecker queried this approach, noting a significant time lapse between the reports and developments in the interim in relation to policy norms & developments, an evolving framework of cultural rights and Community participation fundamental.

 

Dr Strecker highlighted relevant cultural rights under human rights legislation, noting the right to access one’s own cultural heritage, right to participate in decision making  – Article 15 1(a) International Covenant on Economic, Social and Cultural Rights (ICESCR) & Article 27 International Covenant on Civil & Political Rights (ICCPR).

 

Mr C McAleer (SOS) queried the new declaration of no drilling would occur within 100m of the exploration area and draft conditions MD8 & MD9: in terms of fair assessment at this inquiry and enforceability around violations.  Forward looking plans to be decided by the Applicant on an annual basis & submitted to the Planning Authority: the drilling depth to be decided, extent & location of tunnelling to be decided; areas for observation/ monitoring to be decided.  There are too many unknowns, and everything can change on an annual basis.  Furthermore he considered vertical drilling necessary for ventilation shafts to serve exploratory tunnelling.  SOS Rebuttal statement referenced steps that should be taken in CH Impact Assessment, anyone involved in Heritage Management at a high level would know that sub-surface archaeology would be adversely affects by this proposal – noise, dust, vibration, light, impact on dark skies all connected to this. 

 

Dr Cirefice (SOS Expert) spoke of the narrowness of CH assessments being a major concern and highlighted that central to the ICOMOS guidance is participation with local communities, as the first step.  Dr Cirefice noted the importance of Ethnographic studies, site visits and engagement activities which were not included.  Desktop studies do not engage with people on the ground, Dr Cirefice referenced a research project she had conducted in the Sperrins over 5 years funded by the Irish Research Council, engaging over 100 people which was approved by the Ethics Committee at Galway University and featured in Peer reviewed academic articles.  The research involved creative workshops -countermapping, photovoice – ethnography, interviews, walking trips, site visits, focus groups and a wide literature review.  Dr Cirefice considered the methodology, ethically & professionally speaking, to be so narrow that voices of local people are excluded.  The site possesses significant value for people’s sense of place, connecting with history, the natural world and physical & mental well-being. These holistic understandings of cultural heritage and landscape, reflected in current international law standards, ICOMOS Guidelines, and ‘Principles of Cultural Heritage Impact Assessment in the UK’, were not taken into account in the cultural heritage impact assessments attached to the Applicant’s Statement of Case. 

 

Emma Mc Aleer speaking from the public gallery, noted that built heritage is being talked about rather than cultural heritage.  CH includes speech, hard-won humour rising from the land itself, noting that living culture is not ornamental, in the Sperrins this survives because the landscape remains intact.

 

Sinead Warnock spoke from the public gallery about the importance of the Irish Language in the area, highlighting another text: Sgéalta Mhuintir Luinigh; Munterloney Folktales: Irish Tradition from County Tyrone and well-known native Irish speakers who had lived in the area, such as Paddy Laidir Mc Cullough.  The language is the basis for our culture, part of our sense of place and sense of community, with the same families living here for generations.  Reducing our lived experience to limited desktop studies.

 

Sinead referenced Josephine Clarke (nee McCullagh) who spoke on a previous day at the inquiry, whose uncle James Kate McCullagh farmed the land now proposed for the mine infrastructure site, left Sheskinshule regularly on a bike to tend to animals.  It was the granny of another local man who has spoked at this inquiry (Martin Conway – Chair of local GAA Club) who provided the water to tend animals etc at that time.  The story was shared to highlight the inter-connectedness of people locally.  Societal, political & environmental factors cannot be ignored, people were forced up the mountain onto the less arable land through colonisation. 

 

Dr Peadar MacGabhann spoke on the background to Tyrone Folk Quest; in 1950’s there was a drive to create a national folklore archive, with the Irish Folklore Commission in Dublin (which later became UCD) commissioning cultural intelligence officer Michael Murphy to complete the work.  Body of material covered withing book: buildings, origins of population groups, weather, elements, land, land use, farming, place names, pronunciation & meaning, ringforts, mass rocks, flora & fauna. 

 

Local man, Sean Clarke said that Murphy and wife & children lived in Teebane east for 4years, where he met local people, with a big contribution coming from Paddy Laidir McCullough from the townland of Curraghinalt.  Prior to this a German professor (Prof Wagner) came to Glenhull in the 1930’s, to study the language. Professor Wagner ended up living in Connemara, teaching people Irish.

 

Third Party objector Mr Haughey queried the practicality of the assertion of no surface drilling on site.  He again highlighted that only 1% of the gold resource is ‘measured’ and noted that in the Cavanacaw Mine the company frequently lost sight of the seams, he was aware of 4 permission requests to drill down to find these.  He considered vertical drilling with rigs essential, irrespective of the new position presented by the Applicant today.

 

Mr Haughey noted that TBR15 by the Applicant was only made available to third parties in February 2026 under the Transboundary Consultation, with third parties not afforded the opportunity to respond in writing, so oral responses need to be facilitated.  He considered it strange that the 2021 CiFA publication, Principles of Cultural Heritage Impact Assessment in the UK was only now being referred to by the Applicant and noted the Assessment was not sufficient by any means.

 

Mr Haughey noted that SPPS 2nd Edition (Dec 2025) should be applied – Strategic Planning Policy Statement for Northern Ireland- citing a number of relevant paragaphs:

‘6.1 Archaeological and built heritage are an irreplaceable record which contributes to our understanding of both the present and the past and is an important economic resource.’  The Applicant’s proposal to make a record of any archaeological features found during construction is not the same as preserving, excavation in this manner is simply controlled destruction.  It is a watching brief after the event.  Robust assessment needed to identify material beforehand – detailed survey work should have occurred but is absent.  Paragraph 6.8 notes protections not limited to scheduled monuments.  If the methodology proposed by Applicant was used on sites such as Beaghmore Stone Circles or Copney Stone Circles would have been destroyed rather than preserved.  Copney Stone circles (Creggan) most complex stone circles in our area, not mentioned in discussions to date. Paragraph 6.11 ‘Where a planning authority is minded to grant planning permission for development which will affect sites known or likely to contain archaeological remains, it should ensure that appropriate measures are taken for the identification and mitigation of the archaeological impacts of the development. Where appropriate, this may involve the preservation of remains in situ, or a licensed excavation, recording examination and archiving of the archaeology…’.  ASAI (Areas of Significant Archaeological Interest) designation recognises the level of archaeological features in the area and the high likelihood of more yet to be discovered (Areas of Archaeological Potential – AAP).  Bogs can preserve archaeology for thousands of years – DGL assessments are too focused on current recorded assets, rely too heavily on visibility/ intervisibility.  High resolution airborne LIDAR scanning is needed for entire site area and wider ASAI to know what is under the ground, if DGL were serious about identifying archaeology they would have declared the intention to conduct such surveys.  Mr Haughey noted peat depth modelling could be linked to archaeological potential, predictive modelling could have been done, with trial pits dug in areas of high potential – walkover surveys may indicate buried features through land surface evidence.  The area is extremely rich in archaeological features, 109 cairns locally.  Peat should not be disturbed to facilitate a mining company, the FODC Local Development Plan (Policy HE01 Archaeology) reinforces the use of SPPS (2ndEdition 2025), Policy L01 – Development within the Sperrin Area of Outstanding Natural Beauty reinforces refusal of this application, as could Policy MIN01 – Minerals Development.

 

Third Party objector Mr Donnelly, wished to make an observation on the use of drill rigs from his lived experience at Cavanacaw, noting it was 20 years post planning approval and 3 drill rigs appeared last week under permitted development rights – surface drilling was unavoidable in his view.

 

Third Party objector Mr Donaghy, manager of An Creagan Visitor Centre, reinforced the importance of in-depth research, noting that he was aware of 2 new archaeological sites being discovered locally in the last month.  The entire landscape of the Sperrins is an archaeological site, noting that he was involved with local tour guides who possessed an in-depth knowledge of archaeology in the area.

 

Mr Beattie (DGL) noted that there had been no rebuttal to DGL’s Peatland response from HED to infer acceptance.  He noted that Beaghmore Stone circles were 10km away from mine infratstructure site, with a 10km radius never issued from HED at any stage prior previously, also asserting that the landscaping material submitted by the Applicant picked up photomontages & wireframes.  Mr Beattie noted ICOMOS 2022 standards dealt with World Heritage Sites (WHS), not candidate WHS; with each section specific to WHS. Mr Beattie stated it was unclear how this proposal is going to impact on language & folklore.  Mr Long (DGL) stated whilst a literature review would provide further information on the area, it does not change the wider impact of the proposed development on cultural heritage.   Mr Long remained of the view that the Applicant’s Cultural Heritage Assessment (Appendix C15 – Nov 2017) was not out of date.

 

Mr McGonigle (Archaeologist for NIE) noted ICOMOS 2011guidance used in their original cultural heritage assessment, he considered the 2022 toolkit applicable to world heritage sites.  Mr McGonigle noted that he has since reviewed texts Tyrone Folk Quest & Scéalta Mhuintir Luinigh and noted only two references to townlands Rousky & Teebane West.  A third-party objector later challenged this, noting it was inaccurate.

 

Historic Environment Division (HED) were asked if they wished to make any further comment.   Maybelline Gormley (Senior Archaeological Inspector) spoke to note that Mr Beattie had referenced no further comment had been made on Dr Jill Plunkett’s report for the Applicant, this was incorrect as HED had provided a Statement of Case 18/11/24 and submitted a specialist report by Dr Ellen O’Caroll (peatland archaeology specialist) on 11/04/25.

 

Dr Strecker (SOS) challenged Mr Beattie on his assertion that ICOMOS (2022) was applicable only to WHS, noting that world heritage conventions were not his area of expertise.  These standards are not just taught in UCD, but as taught on MSc programmes around the world as best practice standards and should be applied to archaeologically sensitive sites.  She noted ICOMOS Ireland & ICOMOS UK Committees would recommend this approach, which is established in world heritage practice & context.

 

Mr McAleenan (HED) noted that their SoC submission followed the HED Guidance document on Setting and the Historic Environment (Feb 2018), with ICOMOS used to inform best practice.

 

Mr Fegan (FODC Counsel) noted that Page 12 of this HED document referenced the 2011  ICOMOS document Guidance on Heritage Impact Assessments for Cultural World Heritage Properties, which ‘while focussing on World Heritage Sites, contains useful guidance on assessment methodologies which may be applied to any heritage asset’.

 

Commissioner Donaghy noted the Applicant had failed to address intangible cultural heritage, posing the question who scrutinises the impacts on Intangible cultural heritage?

Commissioner Donaghy asked Mr Long (DGL) to comment on Applications impact on sense of place, identity, cultural continuity & people’s relationship with landscape.

Mr Long didn’t answer directly, choosing to speak about historic monuments and DGL’s public consultation process.

 

Mr McGonigle stated their assessment considered cultural heritage and intangible heritage.  Folklore is there for posterity and can’t be erased or removed.

 

HED asked same question: Are sense of place, identity, cultural continuity & people’s relationship with landscape adequately assessed within scope of Environmental Statement.  Mr McAleenan noted that the settings impact would warrant further investigation here.  The impact on language & wider folklore, not really in remit of HED. We assess proposals under archaeological policy requirements; impact on recorded archaeological sites & settings; sense of place should be taken into account in decision making & how ambience contributes to its experience & settings.  Intangibles should be assessed & ASAI.  These are not considered in a wider landscape sense, HED’s role is liited to recorded sites & ASAI (Areas of Significant Archaeological Interest).  This is not something we usually comment on.

 

Mr Fegan (FODC Counsel) noted the need to be careful about advice just given by HED.  One can see HED remit focused on a particular asset & impact on setting.  Sense of place outsider their scope of impact assessment.  FODC position is that sense of space is a material consideration, with a broad definition given to this in case law.  There is ample evidence from others on the impact the proposed mine will have on sense of place – which clearly needs to be weighed in the Planning balance.  The matter came up in Dorville inquiry, where the commissioner agreed sense of place is consideration.  We would caution against any approach that sought to minimise or remove this. 

 

Mr Elvin (DfI) noted HED Guidance Page 11 acknowledged there are wider issues to landscape character that do need to be considered.

 

Mr C McAleer (SOS) noted this isn’t a standard application, it is unprecedented as is the level of opposition from the community.  When we think of landscape within the Sperrins, we think of a wide area, what happens in one area affects the rest.  Rich archaeology in the area and the fact that there significant monuments only still being discovered.  He noted Cashel Hill could be threatened by this project through unspecified drilling & tunnelling, impact on underground hydrology unknown.  Cultural significance & connection of people to the monuments.  Concerns continue to be undermined, explained away, marginalised by the Applicant. 

 

Dr MacGabhann (SOS) noted the lack of reference to the value of memory, referencing connection between landscape and memory – referencing historian Simon Schama  1996 ‘Landscape + Memory’.  He quoted from  Monsignor Brendan Ó Doibhlin – native of Rousky – outstanding Irish & French scholar who wrote of the importance of the landscape to the people of the area.

 

Dr Strecker (SOS) noted that Gahan & Long’s cultural heritage strategy / engagement strategy contained a lot of misunderstanding & context missed: highlighting how promotional material is being classified incorrectly as engagement.  There has been a longstanding conflation on engagement, consultation & promotional activities.  Funding, tunnel tours, jobs does not constitute consultation. Citing DGL’s 2024 Responsible Business Report, P.24 Community perspectives on project – 5 quotes included, taken from SoC’s in support of application.  These are from Gerry Kelly, Chair, Silent Majority Group; Joe Rice, retired engineer, Tara mine; Pearse Bradley, Geo-technican DGL;  Alan Dolan, President, IMQS (Irish Mining & Quarrying Society) and Steven Kelly, CEO, Manufacturing NI.  These people are not the community and the views expressed are in no way reflective of the local community who are overwhelming opposed to this application.  The same report notes under SASB Standards (Page 63) ‘The engagement processes referred to relate to human rights as provisions relating to indigenous people and areas of conflict do not apply, Human rights do not apply’. 

 

Communication through tunnel tours & Facebook does not constitute consultation, 2 information sessions held in 2016 on the applicant’s infrastructure site rather than a public venue, do not constitute consultation.  We need to be really clear this is not community consultation, it does not meet the minimum standards of what consultation is.

 

Dr Cirefice spoke on the extensive ethnographic research she had conducted in the local area, noting that the mine application has contribute to a sense of solastalgia throughout the community, noting the narrow understanding of the issue in DGL’s Transboundary submission documentation.  It is a feeling of deep helplessness around major projects, especially when communities feel they have been excluded in the decision making process.  She outlined how intangible cultural heritage became the main focus of her research, noting this was intergenerational, sensory, emotive, embodied language, folklore, memories, archaeology, placenames and connection to the more than human & natural world (spiritual).  She explored the relationship between people and the land, more than seeing it as an object, documenting stories, hosting events & visits from international communities.   Cultural Heritage connects people with place, it is felt, sensed & heard.  You have to understand how cultural assets are experienced and which can only be done through speaking to the people affected.

 

Another third party objector, Mr Haughey reiterated the 2016 information event could not be considered consultation.  This was announced after the introduction of cyanide into the process, prior to its subsequent withdrawal.  The barometer here is 50,000 objections to this proposal.  DGL has not understood the sense of place attributed to this place.  It is about relationships, people, townlands, religion, archaeology, farming, walking, oral history & family community.  The remoteness, the darkness, the access, the silence, our dignity, cultural association, being part of an unindustrialised upland landscape.  You go to the mountain to breathe in fresh air, go to the river knowing the fish in it are healthy.  This is our sense of place & is what it has been for 1000’s of years.  The mine proposal, infrastructure & dry stack/ waste rock store threaten this irreversibly.  Lighting, dust, traffic, waste, HGVs, industrial business will change this place forever.

 

Mr Haughey noted the work of the Sperrins Partnership, documenting oral traditions and the development of a long overdue management plan for the Sperrins, based on retaining the Sperrins as a natural resource, as opposed to changing the area into an industrial landscape. 

Mr Haughey noted An Creagan Visitor Centre was built in 1994 in the Sperrin’s AONB, tourism created around that sense of place, people come here for the tranquility.  The sense of place has not been assessed.

 

SPPS (2nd edition) requires proper protection of archaeology, L01 in FODC LDP notes developments that adversely affect or erode special character will not be permitted – this is all sense of place.

 

Emma McAleer speaking from the gallery queried ‘who from DfC should be in this room to help the community defend intangible cultural heritage?’  She quoted a UNESCO definition for the subject: ‘Cultural heritage does not end at monuments and collections of objects. It also includes traditions or living expressions inherited from our ancestors and passed on to our descendants, such as oral traditions, performing arts, social practices, rituals, festive events, knowledge and practices concerning nature and the universe or the knowledge and skills to produce traditional crafts’. 

 

She noted that funding can be a barrier to local communities protecting heritage, if this project goes ahead, a community facing a toxic mining application would be seen as high risk by funders and any publicly allocated funds would then go towards environmental monitoring, remediation & mitigation, rather than protecting and celebrating the cultural heritage of a rural community.  UK & Ireland (including NI) are now developing living heritage inventories to preserve information on intangible cultural heritage.  She concluded with, ‘Please consider what the community is saying here today’.

 

Mr Elvin (DfI) later noted that there isn’t a specific consultation body within the department for these matters.  Referencing the SPPS, he stated ‘there isn’t a specific consultee that deals with this, it is accepted as a material consideration by the Department’.

 

Sinéad Ní Mhearnóg (Warnock) noted a simple example of this mine proposal on local folkflore – 10years ago if you typed Curraghinalt into a google search engine you would have been met with stories on Paddy Laidir Mc Cullagh, Scéalta Mhuintir Luinigh and the promotion of folklore & language led by the community, now all you get is references to Dalradian and this mining project.  Language initiatives & cultural initiatives are all community driven, these wouldn’t come about if the work wasn’t done on the ground.  She finished with a reference left by a visitor to the area in one of the local hospitality businesses, Pat Larry’s cottage, which read:  ‘Some places are visited, some places are felt.’

SOS solicitor Mrs Brolly noted that community cohesion has been adversely affected by this application and can only be seen to get worse.

 

Mr Beattie (DGL) did not agree with the view of HED that the scope of the cultural heritage assessment was narrow as to how it was set out, and sought to align the applicant’s view more with FODC & DfI.  Mr Beattie noted visual impact assessment at Cashel Rock was considered by Applicant, noting DGL SoC TR15 Cultural Heritage Section 4.2 Page 4.  Mr Beattie drew Commissioners attention to TBR Appendix 6, Annex 2 on comparisons with Dorville and how context is different in the applicant’s view.  Mr Beattie contended on behalf of DGL that the sense of community will persist with or without the proposed development.

 

Mr Buroni was then invited on behalf of DGL to talk about health impact assessments and solastalgia.  He referred to Solastalgia as more than environmental grief, it was the erosion of sense of place, unwanted change, but that this was complex, varied at individual level & at stage of life.  Mr Buroni considered this a response to dramatic & rapid environmental change linked to mines, windfarms & tourism.  He went on to note the perception of change may be unfounded and heavy industrialisation may not be what is proposed here – a statement clearly outside his specialism. 

 

Mr Buroni continued when you look at intangible aspects, concerns are linked to tangible and perceived intangible factors, perceived danger, if people are not involved in the decision making process – of which the inquiry was now playing its part.  He then stated all tangibles & intangibles are already addressed, there would be no change in demography and repeated all aspects already addressed, the challenge was drawing them together. 

 

Commissioner Donaghy directed that the inquiry would break for lunch at this point, with third party supporters to be given the opportunity to speak on resumption at 2pm, with third party objectors to be heard following this, noting many hands rising following Mr Buroni’s comments.

 

Mr McAvoy (Counsel for DGL supporters Silent Majority Group) introduced a local supporter Monica Coyle who wished to speak.  She stated that she was born in 1945, had lived in the area in the townlands of Aughnascribba & Sheskinshule her whole life, had lived through periods of change and did not see how the mine would change the sense of place, in her view Greencastle will always be Greencastle.

 

Dr Cirefice noted through her research project she had documented the already felt Solastalgia and considered the issue central to the assessment of intangible culture heritage.  She wished to have more clarity on the research assumptions used to inform Mr Buroni’s desktop analysis.  Her research has already documented feelings of solastagia at this exploration stage around environmental change but also around the feelings of distrust towards state bodies and powerlessness around the decison making process.  A Key recommendation from Solastagia literature is to: Increase participation of local communities in decision-making related to new infrastructure or development projects, resource management, restoration efforts, as well as when designing adaptation strategies

 

Another third party objector Mr Tracey drew comparisons with mining operations in Australia & South America and did not accept this mining proposal & monstrous waste dump would not have adverse effects on the community.  He queried how Mr Buroni could conclude there would be no change to the area when considering the noise, dust, HGV increase the mine application would bring if permitted.  He noted that there was extensive research to show a decline in social relations in areas that are mined, particularly where this was contested from the outset.

 

Multiple third parties challenged Mr Buroni’s submissions as so far removed from reality, it was meaningless.  Such baseless sweeping assumptions if made by third parties would rightly be challenged by Commissioners, with one objector commenting if they were to make a statement citing health concerns that young children living in the area could develop rare cancers from proximity to this site, this would be more easily justified through worldwide examples of mining consequences than the stance presented of there’s nothing to see here.

 

Third party objector Mrs Byrne (SOS) noted how the people most affected by this application are the third parties, rather than the consultants brought in to help sell this application.  She stated ‘I will be buried here, this is my life.  I see don’t look at the Sperrins AONB as an opportunity to exploit resources.  I see life, the creatures that crawl across the sphagnum moss.  The Sperrins are me & I am the Sperrins.  If industrial level development is permitted, it will leave the area decimated.  This ancient area is unspoiled, there are structures here that predate the pyramids in Giza.

 

Third party objector Mr Haughey called Mr Buroni’s comments as grossly insensitive to the people of this area.  Concerns will be covered in technical issues later on – that in itself shows no consideration for the people of this area.  He challenged the commentary that the issues of concern are dependent on a person’s age alongside the coment that heavy industry is not what is being proposed.  What planet is Mr Buroni living on – this is exactly what is proposed.  A mining operation running 24/7, 365 days a year, with high levels of HGV use and Police support due to daily explosives.  The third parties approach is that this should not be here.  DGL representatives are coming at it from, this is coming here, this is what you have to deal with – mitigation, mitigation, mitigation, condition, condition, condition, fund, fund, fund.  This is a massive industrial proposal with DGL having prospecting licenses across 122,000 ha of counties Tyrone & Derry.  The suggestion that discussing it here today will remedy it, as some form of therapy for local people is outrageous.  It is tragic what is happening, narrative is being framed like we are accepting this.

 

Emma Mc Aleer noted built heritage, natural heritage & cultural heritage all need to be taken into account.  The landscape itself shaped culture, culture in turn, names & shapes landscape – in the Sperrins, the two are inseparable. 

 

Sinéad Ní Mhearnóg talked about the ‘pull of home’ noting as an example Gerard Hollywood, who has returned from Australia with his wife and young children to build a home in Greencastle in close proximity to the proposed mine site.  There is a palpable sense of place to the people of this area, this application threatens to disrupt our sense of place & spirit of home if permitted.  All of us in Greencastle, Alworries, Currgahinalt, Coneyglen are extremely concerned, clearly there is an impact.

 

Dr Gordon (DGL) noted that the Pre-Application Community Consultation met requirements & was tested in the courts.  Dr Strecker (SOS) tried to raise a point on archaeological assets in Beaghmore/ ASAI, but was not allowed to contribute again.

 

Mr Long (DGL) expressed surprise that HED consider scope of assessment not wide enough.  He reiterated Mr Beattie’s point that Beaghmore Stone circles are included which are 10km from infrastructure site.  Mr Long noted he was involved in a 2010 consultation for a gravel pit near the Beaghmore Stone Circles (I/2010/0086/F) which was granted planning permission May 2011; and a windfarm application 2.5km east of stone circles (I/2014/0413/F).

 

Mr Long advised that on behalf of DGL he consulted with statutory bodies on ASAI’s in July 2017, identifying views to surrounding land forms & skylines.  Pre-historic, neolithic & bronze age monuments found in the area, with their significance enhanced by their relationship with each other, topography, route ways & skylines.  Three main clusters or bands of monuments currently exist within ASAI:  (1) North from Beaghmore Stone Circles – band on a north-south axis extending to east side of Kerrin Rd, (2) Cluster in Owenkillew Valley (basis for Mhuintir Luinigh), and (3) extending west, no monuments which overlap with mine site.

 

Mr Long noted that the ASAI overlaps with subterranean mine site, the boundary between the two along site fenceline, at boundary of Crockanboy, Teebane West & Monanameal townlands – the boundary follows ridgeline of Crockanboy hill.  In his view, which is at odds to that held by third parties, the subterranean element cannot alter the ASAI, and mine infrastructure cannot impact on ASAI but has potential to impact on setting. 

 

Mr Long continued to repeat the content of his written submissions, Beaghmore ASAI established through desktop & field survey considering surrounding views/ horizons of landscape, these widely encompass settings for stone circles.  He argued the mine site doesn’t have any impact physically on Beaghmore ASAI, noting setting of ASAI considered through 3 methods: (1) viewpoints within ASAI, (2) monuments within ASAI – principally those within 3km of site and (3) historic landscape of Owenkillew Valley (considered in RR15).

ASAI viewpoints marked on map by Mid Ulster District Council (Figure 1, Appendix 3, Critical Viewpoints, Rebuttal submission) noted 5 critical viewpoints.  Applicant put forward that the mine infrastructure site would not be visible in views 1, 3, 4 & 5, with no impact on setting.   Mr Long noted Kerrin road considered one of the most scenic driving & walking routes in locality, and ‘dry stack facility’ (mine waste) potentially visible from viewpoint 2.  However considered this to not intrude significantly to compete in landscape across ASAI; and contended the infrastructure site would not be visible at inter-related views to landscape within ASAI.

 

Mr Long then moved to discuss content of his rebuttal submission (RR15 – Cultural Heritage) drawing the Commissioners attention to his challenge to the document/findings of Dr Paul Logue & Déaglán Ó Doibhlin, Pages 6-8 of same and Figure 7 on Page 31 showing the location of mine infrastructure site in relation to archaeological monuments and points of interest as identified by Logue and Ó Doibhlin.

 

Dr Gordon (DGL) talked about the importance of the Crockanboy Hill ridgeline being recognised in the Applicant’s Design & Access statement and trying to place buildings within existing trees, referencing a LUC drawing (LUC 6335 LP PLN 001 Rev H) which showed trees to be retained to the north of the site relative to the ridgeline.

 

Mr McGonigle (NIE) invited to comment on Powerline relationship to ASAI- noted the closest pole set is located over 2.5km away to west of stone circles & closest pole set to Dun Rhuadh (TYR 019:004) 5.4km away.  Mr McGonigle noted the proposed powerline will not impact on primary views of Dun Rhuadh & associated monuments & stone circles.

 

HED invited to comment – Mr McAleenan noted that ‘impact has not been clearly demonstrated to date’ adding ‘impact on character of ASAI not clearly demonstrated’.  Mr McAleenan added that the ASAI Development Plan updated in 2023, with Beaghmore ASAI recognised as being of regional significance.  ASAI substantial expansion of previous designation – which is a statement of significance in this case.  Designation encompassed multiple sites, enhanced by inter-relationships & connections to historic routeways.  Further evidence is required, to date this has not been adequately addressed.  This should incorporate key viewpoints and wireframes; assessment & analysis should be accompanied by understanding of historical information.  Mr McAleenan noted that the Applicant (DGL) referred to rebuttal reports & accompanied 3D modelling, HED have reviewed this information but is not clear what 3D modelling is demonstrating by way of impact – HED seek clarity on what 3D modelling is showing.

 

Commissioner Donaghy asked does HED agree with ambit of views?

 

Mr McAleenan repeated that photomontages or wireframes from key monuments including Beaghmore Stone Circles were required, with accompanying detail/ descriptions of these.  This is key to how the ASAI is understood.

 

Third parties were then allowed to comment.  Mr Tracey raised the Battle of Formil and differing views on where the battle site was, considering local knowledge and topography of 3 mountain ranges & two valleys.  References to this battle within Annals of Four Masters/ Annals of Ulster ‘proud were our people when we fought at Formil’.

 

Dr Strecker (SOS) then advised Commissioners she wished to make an oral statement on behalf of Gabriel Cooney, Emeritus Professor of Celtic Archaeology, UCD School of Archaeology.  She was met with fierce objections & multiple interruptions by the Commissioners on the timing & content of this submission, despite explaining that Professor Cooney had hoped to be present on behalf of SOS an expert witness, but could not on health grounds and his comments related to issues raised in the Transboundary submissions which third parties had not yet been given the opportunity to respond to either in writing or orally.

 

“To whom it may concern,

I am providing this statement to the Public Local Inquiry into the proposed Dalradian Curraghinalt Project with regard to the potential impact of this proposed project on the Beaghmore Area of Significant Archaeological Interest (ASAI).

 

I am an Expert Member of the International Committee on Archaeological Heritage Management (ICAHM) of the International Council on Monuments and Sites (ICOMOS). I sat on the World Heritage Panel of ICOMOS 2018-2022 assessing candidate World Heritage Properties. On behalf of ICOMOS I have carried out Technical Reviews of Historic Impact Assessments (HIAs) of potential impacts on World Heritage and other historic properties.

I should disclose that I was chairperson of the Historic Monuments Advisory Council (HMC), a statutory advisory body to the Department for Communities, Historic Environment Division (HED), when the Beaghmore ASAI was extended. The Historic Monuments Council supported this extension and wrote to Fermanagh and Omagh District Council (FODC) in July 2017 expressing its support for the extension and the inclusion of the extended Beaghmore ASAI, along with the Creggandevesky ASAI, in the Fermanagh and Omagh District Council Local Development Plan. This was in line with the guidance in the Strategic Planning Policy Statement (6.29) that District Councils are required to protect already designated ASAIs and to consider as appropriate the designation of further ASAIs. It is important to note that the Strategic Planning Policy Statement further outlines that HMC is to be consulted on the designation of ASAIs.

 

I wish to make reference here to the Technical Report (TR15) on Cultural Heritage and Reponse (TBR15) (Gahan and Long) and the Rebuttal Statement (Turley), with specific reference to the section on Cultural Heritage, submitted as part of the ongoing public local inquiry into Minerals Planning Application LA 10/2017/1249/F I PAC Ref: C005.

 

The focus of TR15 is on the area of the infrastructure component of the proposed development. There is some consideration of the potential impact on the setting of regionally important monuments identified with a 3km radius of the infrastructure component of the proposed development and on the potential impact on the setting of the Beaghmore Stone Circles within the Beaghmore ASAI.

 

However, there appear to be significant shortcomings with the approach taken. Firstly, TR15 seems to have been conducted with knowledge of the initial ICOMOS guidance on HIAs for Cultural Heritage Properties (2011). The applicant notes in TBR15 that the ES chapter methodology sets out a methodology that is comparable to standards established in the ICOMOS 2011 and 2022 guidance, referencing Table 4 of the document which sets out the definitions for severity of change using terminology similar to that contained within paragraph 5.7 of ICOMOS 2011, and referencing Table 5, which forms a significance of effects matrix based on the table set out on pages 9 and 10 of the ICOMOS 2011 document. However, there appears to be no reference to the expanded and more detailed methodology contained in Guidance and Toolkit for Impact Asssessment published by UNESCO, ICCROM, ICOMOS and IUCN in 2022.

 

Secondly, no detailed consideration is given to the fact that the boundary of the ASAI now directly abuts the edge of the proposed infrastructure area which includes a mine waste storage facility that would be in excess of 50 metres in height. This clearly would have a potential significant impact on the ASAI, but this is not addressed or assessed.

 

Thirdly, the 2022 Guidance and Toolkit for Impact Assessment specifically mentions (p.33) the International Council on Mining and Minerals ‘No-go’ commitment not to explore for oil, gas or minerals in World Heritage Properties and to ensure operations adjacent to properties are not incompatible with the Outstanding Universal Value of the property. Beaghmore ASAI is not a World Heritage Property, but the consultants who undertook the assessment for the powerlines (RPS) have quite rightly applied a HIA process used for World Heritage and other cultural heritage properties. Its designation as an ASAI recognises that it is a heritage landscape area of regional/national importance and the Statement of Significance for this ASAI recognises its sensitivity to change from large scale development, including mining.

 

Against this background I consider the discussion and assessment of the potential impact of the proposed development on the Beaghmore ASAI as somewhat limited and inadequate.

Section 3.34 to 3.42 of the Rebuttal Statement deals with the Historic Environment. By contrast with TR15 this focuses on the potential impact of the proposed development on the Beaghmore ASAI. In 3.37 it should be noted that the Rebuttal Statement appears to agree with the characterisation of the ASAI landscape as particularly sensitive to change. However, the Rebuttal Statement is clearly incorrect in stating that the ASAI is beyond the ridge to the north of the surface infrastructure site. Figure 6 in TR15 clearly shows that the edge of the proposed infrastructure site directly abuts the boundary of the ASAI. This means that the statement in 3.42 that the project will not adversely affect the Beaghmore ASAI has not been demonstrated.

 

I have restricted my comments here to the assessment of the potential impact of the proposed infrastructure component of the proposed development. Clearly the underground element of the proposed development is much larger and extends into the Beaghmore ASAI. There are a range of potentally serious, ongoing and detrimental impacts arising from the proposed development. However, assessment of these are not within my professional remit.

In conclusion I would agree with the consideration of the Fermanagh and Omagh District Council that the proposal is contrary to Policy HE01 of the Local Development-Plan Strategy and paragraph 6.8 of the Strategic Planning Policy Statement as it would adversely affect the Beaghmore Area of Significant Archaeological Interest.

 

Yours sincerely

Gabriel Cooney, Emeritus Professor of Celtic Archaeology,

UCD School of Archaeology”

 

Third party objector Sean Clarke, spoke next from the audience, referencing a book ‘Sites of Prehistoric Life in Northern Ireland by Harry Welsh’, quoting from page4, there are 59 individual monuments in Broughderg, 28 burial cairns, suggesting the presence of an extensive sacred area.  Over 4-5000 years, tens of thousands of humans were interred here and over 50% of the area is covered in blanket bog.  In the last two years, 18 additional sites discovered in Broughderg, over the whole area, he estimated this to be about 50.   He then referenced speaking with David Gavaghan 27/04/26 (CE of Titanic Quarter, when this was being developed) who referred to Beaghmore as the iconic landscape unique on this island, as the future of tourism.  It is a high valley, approximately 600ft above sea level, with the earliest farmers in Ireland; noting that Dun Rhuadh is the most important site of its type in Europe.  Green Road believed to be 1500 years old.

 

Emma Mc Cullagh (Mid-Ulster District Council) also spoke from the gallery, wishing to clarify a comment by Mr Long on 5 viewpoints within ASAI.  The Council did not consider these to be static viewpoints, but transient viewpoints with protected views along routes between these, asking that this impact be considered by the Commission.

 

Third party objector, Mr Haughey spoke on his personal connection to the Beaghmore Stone Circle site, which was owned by his Grandmother, then his parents, he now owns the farm beside it, with the land vested over in 1980’s.  Remembering a reference by Dr Claire Foley (Archaeologist) on Beaghmore at the time, of the stone circles being the tip of the iceberg in terms of what is there.  Historic position has always been – the safest way to preserve monuments is to leave them in the ground.  He noted 129 stone circles in the Sperrins region, outlining the vast scale of known archaeology in the area.  Mr Haughey queried why DGL were allowed to return discussions to visual & landscape matters, on multiple occasion without challenge, when these matters are to be discussed at another section of the Public Inquiry.  He also queried why Gahan & Long did not look at the archaeological features between the mine infrastructure site (or 2km radius) and Beaghmore (10km away as we have repeatedly been told), referencing the ‘cock of the north’ area of historical significance as an example.  Mr Haughey noted that he can see the lights from the GAA Club pitch floodlighting at night (when teams are training in winter) from his farmland adjacent to the stone circles, so would see the lights from the mine infrastructure site from this location.

 

Third party objector, Mr S Tracey noted that a bronze age burial cairn was discovered this year in the Murrins Area of Special Scientific Interest, near Omagh, with photographs published in local newspapers in February / March – with the Application site clearly visible in the background of the photograph.  This development will have an impact on nearby archaeological sites. 

 

Fidelma O’Kane (SOS) noted that DGL’s evidence is based on ground water predictions which are unproven.  Mining will alter the water table and impact on hydrology below ground, it is reasonable to assume this will adversely affect sub-surface archaeology, known & unknown.  DGL mitigation measures are untested & may fail.

 

Mr Fegan (Counsel for FODC) noted that FODC put forward a draft reason for refusal in their SoC based on LDP HE01 – Archaeology, linked to maintaining the integrity of settings & reference to viewpoints; noting this concern was shared with MUDC & third parties.

 

FODC’s position is we don’t think either of the exceptions on HE01 are engaged.  ASAI’s are particularly distinctive historic landscapes.  Paragraph 5.8 notes ‘Generally, it is unlikely that ASAIs will be able to accommodate large scale development such as quarrying or mining operations, …  waste disposal … as it is likely that the overall impact of such proposals could be particularly damaging’.  Mr Fegan noted that DGL had objected to extension of ASAI during process.  FODC took advice, consulted with historic monuments council, statement of significance produced of relevance to your assessment.  ASAI takes surrounding horizons of landscape into account, stone circles & alignment considerations.  The surrounding landscape shaped by farming is characterised by open vistas, distinct absence of industrial developments/ large scale development.  The area is sensitive to change, which would adversely affect landscape character, contribution it makes to setting, experience – Mr Fegan noted the statement of significance goes further than ASAI test.  Extensive consultation undertaken with HED, viewshed analysis, mapped out area /envelope in terms of views, & extensions of view, tested and examined these during local development.  FODC considers this a breach of HE01 Policy & relevant exceptions not met.

 

Mr Beattie (DGL) advised that HED comments were previously picked up in the Applicant’s DfI Rebuttal 18/11/24 (Pages 169-170 referenced for 4-5 short paragraphs).  Mr Beattie noted impacts raised by FODC + MUDC, whilst also noting Turley’s SoC which seeks to address issues in context of ASAI.  HED consider insufficient information to allow full assessment, but don’t provide a list of outstanding items. Mr Beattie continued ‘I’m not sure if I am better informed or any wiser in what they want to be assessed or why.  I don’t find HED’s intervention particularly informative.’  He responded  to Professor Clooney’s oral statement on TBR 15, again expressing the view that ICOMOS (2022) is exclusively for World Heritage Sites and invited the Commissioners to apply their own judgement on this.

 

Dr Gordon (DGL) noted a viewshed analysis was contained within DGL’s Main Mine Rebuttal submission (RR13 Landscape, LUC Figure 1, Page 117), which shows where the mine waste facility (Dry Stack)/ infrastructure can be seen from.   

 

He also referenced Appendix C16_2nd Addendum (2020) to the LVIA & Visualisations Appendix 1and viewpoints from Stone Circles pages 94-100.  Dr Gordon contended that this night time visual from carpark at stone circles focused on sky glow, and the conclusion from Miss Oxley (LUC) was no significant impact at that point.

 

Dr Gordon also referenced LUC analysis within DGL SoC submission TR 13 Landscape & Visual (paragraphs 211 – 217, Pages 73-79).  Noting that a screenshot showed low levels of visibility of plant roof & 3D model of development located below ridge (Crockanboy Hill).

 

Mr Long (DGL) challenged FODC’s response to HE01as containing no analysis of Beaghmore ASAI viewpoints and provided a planning reference for an extension to a gravel quarry within the ASAI granted in July 2002 as justification of existing industrialisation (I/2001/0023/F).  Mr Long noted that monuments within Owenreagh Valley were not assessed unless they fell within 3km of infrastructure site radius.  This was in response to third party assertions that the Owenreagh Valley would arguably be more impacted by the mining project than the Owenkillew Valley.

 

A third party objector Niall McAleer, wished to challenge the repeated references that the retention of small areas of existing trees would screen buildings at the infrastructure site, noting that the processing building alone spanned 100metres in length, with 25m ridge height which would dwarf any existing vegetation.  He also objected to the deliberate conflation between quarrying & mining, which are in no way comparable, to make this toxic application more palatable.

 

Mr Haughey challenged the Applicant’s response to HED, which tried to offer the defence they didn’t tell us, so we didn’t do it.  The Applicant knew this was an issue.

 

There was no update on timetable for the remainder of the Public Inquiry and no indication of when this will be made available.  Proceedings were then closed for the day.

 

The Sperrins — More than a Landscape
Day Eighteen

Yellow Cards and Who are our Departments actually serving ?

Wednesday’s session began with a question from Commissioner Donaghey regarding the safety of crossing points associated with site-related traffic on Dalradian’s proposed new road compared to those provided by the existing road.

Mr. Dorman, speaking for Dalradian, claimed that the “layout was agreed with Department for Infrastructure Roads” and further stated that development traffic would not use the proposed new road, with priority instead being given to public traffic. However, he went on to explain that barriers and security gates would be installed along the route. These security measures would include a barrier located 5 metres from the junction and gates positioned 17 metres from the junction, both operated by fob access for Dalradian employees and an intercom system for visitors.

Questions were raised regarding sightlines at the junction and the gradient of the proposed road. Mr. Dorman referred to a safety audit carried out for Dalradian, which he acknowledged had identified concerns, although he did not specify what these were. He stated only that these concerns had been taken into consideration.

Mr. Elvin, legal counsel for DfI, was invited to contribute at this stage but declined to comment.

Third-party protectors drew the Commissioners’ attention to what they viewed as a contradiction in Dalradian’s position. Although the road was presented as an alternative public route, they argued that it would in practice function as an access road for Dalradian staff. They highlighted concerns that the barrier’s location just 5 metres from the junction could create a backlog and a safety risk if three or more vehicles were present simultaneously. Dalradian’s own submissions, they noted, indicated approximately 240 vehicle movements per day. It was also argued that the reduced sightline splays proposed for the junction would create an additional safety hazard.

Reference was made to the Precautionary Principle, with objectors arguing that assessments should assume single-occupancy vehicle journeys. They maintained that the first road constructed would inevitably become the default haul road for site traffic. Basic road safety considerations, they argued, would ordinarily include a lay-by or turning lane at the entrance to the proposed mine site to minimise impacts on through traffic.

Objectors further contended that the possibility of traffic queuing on the proposed new road represented a previously unidentified hazard and raised questions about the validity of the safety audit itself. It was noted that, had local residents retained access to an engineering expert following the expulsion of Doug Hill from the inquiry the previous week, they believed the evidence presented by Mr. Dorman could be readily challenged.

The practical implications of the proposed access system were also discussed. Using Dalradian’s own projected employment figures, it was argued that delays caused by employees locating and presenting access fobs could quickly create significant queues. Estimates were offered suggesting that if each employee took ten seconds to present a fob, delays could total around twenty minutes; thirty seconds per employee could result in delays of approximately an hour; and one minute per employee could generate delays exceeding two hours.

Additional concerns were raised regarding the absence of facilities for minibuses, despite references to their use, and the lack of identified turning areas within the plans.

Questions were then posed regarding contingency arrangements. What would happen if the barrier failed? How would emergency vehicles gain access along a road only 3 metres wide in the event of congestion or a traffic incident?

Another local resident highlighted that the road is located in a rural setting and argued that no consideration appeared to have been given to traditional rural uses, including the movement of livestock. The existing road, he noted, is regularly used for such purposes and is well suited to them.

Attention then turned to the transport of explosives. Concerns were raised regarding previous indications that neither the applicant nor the Department had been able to clarify whether police escorts would be required. Questions were asked about what priority would be afforded to explosives convoys and what impacts such movements would have on local road users and road safety.

The Camcosy Road was again cited as an example of difficulties already experienced by local residents. Community members described previous occasions when individuals working for Dalradian allegedly failed to use designated passing bays, resulting in roads being blocked before local residents themselves were reported to police.

Stopping distances for HGVs and other large vehicles were also identified as concerns in relation to the proposed junction and security arrangements. Commissioners were reminded that official stopping-distance figures assume modern, well-maintained vehicles rather than older vehicles that private operators may use for economic reasons.

Cormac McAleer, speaking for Save Our Sperrins, argued that there was “no comparison to the existing road,” describing instead “the sound of the cuckoo, the curlew, the wild hare and the heather.” He contended that the proposal, with the tacit agreement of DfI, failed to respect biodiversity, public access, or local people. What was being proposed, he argued, was effectively a private road controlled by a mining company.

Mr. McAleer also referred to the feasibility study, noting recommendations involving second-hand vehicles for economic viability. He questioned what precisely was meant by “site traffic” and stated that, were the proposal not part of the wider conjoined inquiry, it would be treated as a joke. He reiterated local opposition, stating that residents were determined not to become a sacrifice zone for the company.

Mary Brolly, legal counsel for Save Our Sperrins, argued that information supplied to the inquiry on safety matters was incomplete. She noted that the consultants who produced reports relating to the road abandonment were engaged and funded by the applicant. She also questioned the basis upon which the DfI safety audit had been conducted, arguing that it failed to properly account for the proposal under consideration.

Responding to questions from Commissioner Donaghey, Mr. Elvin stated that DfI’s intention would be to adopt the replacement road, including responsibility for vesting the road and associated drainage infrastructure.

The discussion later turned to the issue of professional corruption. When I attempted to refer to the term as used during discussions at Stormont and within presentations by The Environmental Gathering to the Northern Ireland Audit Office Inquiry into Planning on 10 March 2022, Commissioner Donaghey interrupted before I was able to complete the definition. I had begun citing the description used by The Gathering, which framed professional corruption not as bribery, but as unethical conduct within public service, including withholding information, poor record keeping, rationalising obvious mistakes, and the use of misleading evidence.

Although I was prevented from continuing and another participant was cautioned, it was notable that Mr. Elvin was subsequently permitted to address the same topic before eventually being stopped following interventions by Commissioners McKeary and McParland. This led to concerns being raised regarding perceived bias by the Commission in favour of DfI and against third-party participants, with some arguing that such conduct undermined scrutiny of the proposal and confidence in the inquiry process.

Mr. Beattie, legal counsel for Dalradian, argued that public access could not realistically be prevented on a public road. Local residents responded by noting that anyone familiar with the Camcosy Road during Dalradian’s previous operations would likely disagree.

The session continued with extensive discussion of road abandonment powers, equality impacts, Section 75 obligations, access to the Mass Rock, human rights concerns, the Rural Needs Act, road safety conditions, sightline standards, and the legal obligations of DfI. Throughout the discussion, local residents, Save Our Sperrins representatives, Fermanagh and Omagh District Council, and other third-party participants repeatedly challenged the Department’s characterisation of impacts as “minor,” questioned its reliance on mitigation measures to be delivered by a private company, and argued that equality, human rights, and rural needs considerations had not been properly assessed.

Following the lunch break, discussion moved to potential conditions that could be attached to any approval. Mr. Elvin outlined proposals including baseline video surveys, Section 76 agreements, infrastructure monitoring, and mechanisms for road repairs and dispute resolution. Debate followed regarding the legal sequencing of road abandonment and construction of a replacement road, as well as the adequacy of proposed sightline standards and road safety measures.

Further concerns were raised regarding the reduction of required sightlines from 2.4m to 2m, with objectors and Fermanagh and Omagh District Council questioning the basis upon which DfI Roads had relaxed its standards. Historical planning refusals at the same location due to inadequate sightlines were referenced, and participants questioned whether the proposals would satisfy an independent road safety audit.

The final exchanges focused on the need for independent structural surveys, traffic management planning, hazard assessments, route option reviews, and independent verification of gradients and safety standards. It was argued that road safety for all users should remain the overriding consideration and that DfI appeared overly reliant on evidence provided by Dalradian rather than independently verified assessments.

Shortly afterwards, Day 18—and the final day devoted to Roads Abandonment matters—came to a close. The inquiry is due to move next to Culture and Heritage issues, with hearings scheduled from 26–28 May. Members of the public are welcome to attend and contribute.

Many thanks to everyone who has attended, spoken, provided support, shared advice, or offered assistance throughout the process. Your contributions have not gone unnoticed and are greatly appreciated. Enjoy your weekend, and we go again next Tuesday.

Schedule for P.Inquiry
The timetable: a work of fiction updated often
Day Seventeen

Road Abandonment

The Day began with Third Party objectors procedurally challenging how the DfI Roads elements (Transport & Road Abandonment) have been dealt with, which is contrary to the Road NI Order (1993) and Roads Service Policy & Procedure Guides (RSPPG S019 & RSPPG S027).  This should be a separate Roads inquiry conducted by Inspectors.

SOS Solicitor Mrs Brolly, DfI’s approach has been contrary to RSPPG S019, which states DfI Roads Division must consult and must assess proposals put before them.  Three newspaper advertisements do not constitute consultation on this issue, DfI should have meaningfully assessed submissions rather than abdicating responsibility of their statutory obligations and passing assessment task to the PAC.  Third parties noted that whilst a pothole inspection had been completed on the existing road proposed for abandonment by DGL’s consultants, no structural assessment had been conducted on the existing road, perhaps the DfI Roads Engineers in attendance today, who were absent last Thursday (21/05/26) could be invited to comment on this (Evidence from DFI Roads not given to date).  Mrs Brolly noted that the manner in which the inquiry was proceeding was not in keeping with rules of natural justice.  Roads Division must consult with all land owners affected by proposal (2.1.2 S019), Roads Division must assess whether its proposals comply with the European Convention on Human Rights (2.3 S019); Article 8 of the EC HR also referenced.

 

Commissioner Donaghy noted that complaints on procedural matters need to be made in writing to the appropriate body – Dfi or PAC.  Another third party objector noted he had made several submissions to the PAC website & has received a response that nothing will be dealt with until after the inquiry finishes.  Can the PAC agree now to respond within the statutory period for responses? 

 

SOS vice-chair Mr McAleer noted that following Mr Hill’s exclusion last Monday (18/05/26), SOS are now without an expert in this field and have been trying to recruit another engineer with the relevant experience to assess proposals and offer specialist input in these discussions.  Two engineers have been shortlisted with a view to make an appointment this week, however any new expert would need to be afforded time to review documentation with a time estimate of 50hrs associated with this.  In line with the PAC’s decision to move Landscape discussions to facilitate DGL & FODC experts this week, could the inquiry discussions on roads matters be adjourned to afford third parties time to acquire expert representation on these matters?

 

Another third party objector Mr Haughey noted he had contacted 4 roads experts including one in Cork & Mayo, but with the bank holiday weekend was unable to instruct an able replacement for Mr Hill to date.  He also suggested adjourning until a replacement expert is in place, with an appropriate time allowance for them to review the abandonment documentation bundle & visit site.  The lack of a centralised database remains an issue, which documents are current and valid – noting DfI Roads SoC available on their website but not before inquiry due to its late submission.  

 

Commissioner McPharland noted that only information has been issued directly to third parties from PAC is to be considered and should be shared by them with their experts. 

 

Another third party objector representing CAM (communities against mining) noted that they did not appoint a roads expert as they were aware SOS had done so, and were consolidating resources to reduce expense and third parties now found themselves at a disadvantage both collectively and individually.  He also queried if an EQIA screening had been included in the Roads documentation – which was required by law & wished to know what date was recorded on this if the document existed.  Commissioner Donaghy noted that a copy of DfI’s Working file was available for inspection at PAC’s office, noting that some notes could be held within this that were not issued to third parties in bundles.  Commissioner Donaghy understood Rural needs assessment & HRA included, but did not believe distinct EQIA provided for this.

 

DfI Counsel Mr Elvin noted Aarhus & Article 6 of Human Rights Convention allow for an opportunity for all parties to present case, which can be down through filing written material, there is no entitlement to a public hearing.  Decision Maker can decide if an oral hearing is needed.

 

Mr Beattie (DGL Cousel) noted that the appropriate place to challenge this was the High Court, with third parties not electing to do so since last week.  DfI Counsel Mr Elvin did not consider an adjournment request on this issue to be well founded.

Inquiry adjourned for 10mins to consider this proposal.

 

Commissioner McPharland advised that as Mr Hill’s exclusion was self-inflicted on the grounds of his own behaviour, the inquiry would proceed without opportunity for third parties to appoint another Roads expert. 

 

Commissioner Donaghy moved on with impact on tourism queries, firstly directing to applicant.  Mr Tom Tebitt   (DGL consultant/ colleague of Mr McVittie – day 14) stated the applicant’s research showed negligible recreation use & even less tourism, tourists not visiting Sperrins to visit ‘adopted track’, tourists can use different road within 30,000hA AONB.  It became clear these comments were based on a difficulty establishing a measurable amount of spend from tourists within the area, which multiple third party objectors again challenged the applicant’s limited research, noting this did not rule out significant visitor numbers to the area and considered it not reflective of what happens on the ground.  106 archaeological sites noted within an 8 mile radius, Sperrins Management Plan now developed to help realise the tourism potential of the AONB asset.  FODC Counsel Mr Fegan noted the Sperrins AONB is a tourism asset, although the road proposed for abandonment is not part of a promoted walking route, submissions have shown regular usage as natural tourism from within the area, noting people come to the area for the love of landscape, particularly unspoilt landscape, people come to disconnect and it is reasonable to say that the industrialisation of the Sperrins could deter people from coming.  On one analysis it effects a small part of the Sperrins, the Council’s written submissions note it could also be viewed as ‘Death by 1000 paper cuts’.  It is entirely reasonable to assume it will have some impact on tourism and the reason visitors come (unspoilt natural landscape).

 

Discussion moved to the alternative provision section of new road realigned around the applicant’s mine waste store / ‘dry stack facility’.  DfI asked to present this proposal, with Mr Elvin immediately directing to the Applicant to provide current drawing references.  Mr Gordon (DGL consultant Turley) referencing Hoy Dorman drawings – Proposed Private Streets Determination Plan Layout (Drawing No. 2016021-P-CIV-130) and section (Drawing No. 2016021-P-CIV-131 + Drawing No. 2016021-P-CIV-132).

 

Commissioner Donaghy asked DfI Roads to outline any derogations on proposed new road/ alternative access provision.  Mr Logue (DfI Roads) noted some matters of derogation from current standards  vertical alignment of road an issue, width of road and speed bends 

Mr Logue referenced a Scheme Design Overview (SDO), noting the Carriageway substandard (3m wide as opposed to 6m wide for new roads) to match the existing roads in the area & the introduction of 2 slow bends to control speed – to prevent new road from becoming a race track for anti-social behaviour.  Mr Logue noted the SDO was approved in principle subject to the outcome of the PAC inquiry, detailed design stages and road safety audits at construction & beyond.  Mr Logue noted a relaxation given on speed bends and vertical alignment, where appropriate standard of 8% is exceeded in a couple of sections where 10% gradients are proposed, noting not all areas sit on a constant gradient.  6m road width considered uncommon on U-class roads.  Minimum Stopping Sight Distance is 70m on proposed road, standard is 215m.

 

Third party objector Mr Haughey queried why provision for walkers, runners, cyclists was not considered for road safety, noting separate cycling/ pedestrian areas distinct from traffic were now common practice.  Absence of geotechnical investigation, geo-engineering/ buildability study, earthworks strategy, culvert assessment/ drainage strategy were fundamental omissions in his view, ‘this is not engineering, this is facilitation’.  Drainage calculations, discharge consents, where overflows/ surface water goes – Pollanroe Burn – where are Rivers Agency/ Loughs Agency on consultation? Why are NIEA not here today?  Why is a CEMP (Construction Environmental Management Plan) not provided?  Why has Design Manual for Roads & Bridges (DMRB) not been followed – Hoy Dorman designed roadway, legislation/ guidance noted that the designer can’t then check their work, it should be done by a separate company. 

 

Derogations from DMRB may mean the road cannot be adopted in future – in theory, a gate with a lock could be fitted and it closed off as a non-compliant private road.  Third parties rejected the assertion that the two bends were part if a speed reduction strategy, proposal shoe-horned into application site.  Proposal not designed as an alternative for the public, rather planned to facilitate DGL’s application from day one – not because public road is redundant, to extinguish public right of way. 

 

Mr Haughey stated that the Design speeds noted in the documentation are internally contradictory, with 100km per hour noted on proposed roadway, compared with 85th percentile applied to existing ‘access track’ translating to 20mph.  Geometry plainly deficient, design methodology wrong & unresolved, minimum stopping sight distances of 70m, reducing to 50m at bends, massive deficit from 215m allowance.  Visibility splays incompatible with 100kmh speed.  Road safety depends on fixed low speeds based on sub-standard geometry, ‘this is not design, this is accommodation.’  Crest K Values in proposal, instances referenced at 15 & 10, with minimum recommended value of 100.  Hoy Dorman’s existing traffic survey (January 2015) considered outdated and not representative of seasonal use & weekend patterns.  Site constraints are presented as a design strategy, excessive visibility could increase driver speed – this is an inverted interpretation of the DMRB standards.

 

The inclusion of VRS (Vehicle Restraint Systems) shows alternative proposal is poorly designed, with reduced visibility meaning a reduction in reaction times and increasing  danger on the road, with no pedestrian footway.  Full road closure for maintenance is another failure of the alternative provision. Drawing No. 2016021-P-CIV-130 refers to adoptable carriageway & adoptable verge – must make it clear if it is to be adopted.  Presence of mine waste stack/ reservoir ponds not considered by DfI Roads when reviewing risks of alternative provision.

 

Prior to lunch break, Mrs Brolly returned to this issue of Mr Hill’s exclusion, acknowledging that inappropriate language was used, we would reject the description that Mr Hill’s behaviour was threatening & would consider a mis-characterisation.  Clarification was sought on procedures being followed, Commissioner McPharland noted that PAC/ WAC procedures apply throughout and have been publicly available since 2024.  Mrs Brolly noted that we will consider this matter further and reserve judgement on pursuing a legal challenge on whether exclusion procedures were correctly followed.  Commissioner McPharland noted if third parties wished to pursue this line of inquiry, they could ‘rock on’.  Additional third parties attempted to raise the adjournment issue, but this was closed down and the inquiry broke for lunch.

 

DGL Consultant Mr Hoy (Hoy Dorman) noted that DMRB standards are applied with modification in NI, however as the road proposed for abandonment is classified as a Non-Trunk Road, the proposals could instead be considered under Director of Engineering Memorandum DEM 162/16: Scheme design approval procedures for non-trunk roads.  This assisted where design manual geometry cannot be met in a non-trunk road.  This approach was deemed more pragmatic by the Applicant & DfI, to avoid more bureaucratic/ overly problematic procedures within DMRB standards.  Mr Elvin noted that geotechnical surveys/ matters are for the developer to resolve and any safety issues are a matter for more detailed stage design and can then go through a safety audit.

 

Third Party Objectors challenged references to the road to be abandoned as a ‘track’ within the DfI’s documentation rather than using the official road title (U1244), which was considered by many to be a tactic to detract from the existing road.

 

Mr Elvin (DfI) noted that the alternative road provision was not a like-for-like exercise and did not need to provide this.  A third party objector noted that the Department cannot ignore a material worsening in this regard.

 

Remaining topics for tomorrow Day 18 Wednesday 27th May:

  • Exercise of discretion
  • Equality impacts/ Section 75
  • Rural Needs Impact Assessments
  • Session on Conditions (for both Transport & Road Abandonment topics)

 

No update on timetabling available.

 

 

 

A cardboard sign, a simple message, and a mountain of concern
Day Sixteen

Four Seasons in a Day, but only Two Weeks Bad Weather a Year!

The day began with discussion returning to the timetabling issues noted at the end of the day yesterday, with Stewart Beattie, (legal counsel for Dalradian), stating that the Landscape topic should not proceed next week. He said that it was important for the Chief Commissioner to know what’s going on, and that the Dalradian/FODC Judicial Review (JR) would preclude the course being proposed by the PAC. If Landscape was to proceed next week this would have to be reflected in the JR. He claimed that he had listened to the residents and groups who had contributed to yesterday’s hearing and that their evidence would be taken into account. The “lack of certainty is close to intolerable” he continued.

He did say that the applicant was content if the Roads Abandonment section should overrun into next week, but if the Commissioners were minded to proceed with Landscape then he would have to take instruction.

Conor Fegan legal counsel for FODC noted that the Council are a joint applicant to the JR, and that he would align them with the comments made by Mr. Beattie. What was said yesterday [in his absence] is relevant to proceedings tomorrow and the Chief Commissioner needs to know. As what was proposed has the potential to be a factor tomorrow then the High Court Judge also needs to know. He said that we are running out of time for a solution to be found and it is in no one’s interest that the High Court would be asking why they were only told about this on the eve of the JR proceedings. He proposed that the inquiry adjourn for a period so that the Chief Commissioner could be updated, and any legal advice/updates communicated.

Commissioner McParland then proposed adjourning to 10:50am (with the time just after 10:10am at that stage.

This adjournment was subsequently extended to 11am, then onto 11:30am.

The Commissioners at this stage made a prepared statement, presumably issued by the Chief Commissioner, that the inquiry is dealing often, if not always, with a highly fluid set of circumstances and that they do not want to waste scarce public resources.

With that in mind, it was confirmed that the Landscape topic will not proceed next week for the following three reasons:

  • The Road Abandonment Order is now “leaching” into next week
  • Perceived advantage would be given to Dalradian
  • Risk of duplication

Dalradian propose a further recess to update the High Court (Beattie), Commissioner McParland suggested an early lunch be taken, returning at 1pm.

Third Party objector (MT) noted that legal action would be pursued by him in relation to the change to timetable, contrary to the judgment of Judge O’Hara.

Counter proposal from Mary Brolly, SOS Counsel that lunch break be extended until 2pm to allow third parties take on legal advice, which was accepted by all parties.

After lunch Commissioner Donaghey Questioned that if the abandoning of the road left access to turbary unaffected, were there any arrangements or existing arrangements?

Mr. Beattie, Dalradian, claimed that Turbary Rights are for individuals and that it is up to them to tell Dalradian where they are. He claimed that he had already spoken on Turbary Rights on what he termed “the infrastructure site” and further claimed that evidence of “peat activity” was small scale and personal. Again he said that it was up to the individuals in question to show where, and that unless they see title documents they don’t know. During the course of his input he referenced the Greencastle People’s Office (Point B on their map, access there – if you have Turbary Rights, “or you may be a trespasser”), as well as the picnic and wind turbines along the Green Road.

Mr. Elvin for DfI had nothing to say about this.

A third party protector noted that Mr. Beattie must be confused, and that people who own Turbary Rights don’t have to show them anything. There are 32 different households have land either in or around that they use the road proposed for abandonment for access.

Another third party noted that regardless of who owns the land, access to turbary is enshrined in Turbary Rights, that is the closest route to where turbary is. It was noted that Turbary Rights are for families, and that as the landowner the legal burden of proof lies with Dalradian.

Mary Brolly, legal counsel for SOS reflected on the contribution from Mr. McCullagh yesterday that he used this road to access his Turbary Rights, and that with Turbary Rights there is right of access. In relation to Dalradian’s claim of “trespass”, in the exercise of Turbary Rights there is no question of trespass. Surely DfI with their consultation, or the applicant with their extensive consultation carried out could advise?

Moving onto the Mass Rock, specifically access to the Mass Rock, it was noted how in their contribution Dalradian could reference The GPO, but not the Mass Rock, with Mr. Beattie referring to it as “the rock”. Perhaps, it was noted, that the threats made to local people (including priests) made people fearful. As well as pilgrims making their way to the Mass Rock it was noting that many people of other religions, or none, also enjoyed that particular walk and scenic view as they made their way along the same stretch of roadway. A comparison was made to the rights of way/rights of access, and questions were posed if there was a sectarian aspect to what had been instigated by the applicant – this was flatly denied.

It was pointed out that removal of access to a religious site/relic, particularly relevant at present with the on-going May Rosary, was religious discrimination. Dalradian have a portfolio of 122,000 hectares – why had they chosen to locate their toxic waste dump here?

Cormac McAleer, SOS, recounted how his father had been born and raised in Teebane West, how he had been raised knowing all the townlands, local access points, fairy trees, holy wells, etc. The proposed “pathway” he stated, was of little importance to the faceless backers of this toxic proposal – people like Oskar Lewnowski (Orion) and Randy Smallwood (Wheaton). He implored, and hoped, that the Commissioners would be both aware of and respectful to the sensitivity and emotional attachment given the history of the Mass Rocks within local culture, and pointed out that the locked gate and refusal of a priest attempting to bring people together were not actions carried out by the third-party protectors. The idea that people would be corralled along some narrow alternative space defined by Dalradian was not on he said.

Day Fifteen

Well earned lunch break

Expert Evicted, Speculators Spoof

 Although not the first to speak this morning, Douglas Hill, a retired civil engineer with 45 years’ experience in industry of quarrying, road design, health & safety and public safety attempted, on behalf of SOS, to support a previous speaker, Mr. Pat Haughey, to highlight how DfI had failed to follow their own guidance and the relevant legislation by progressing the Roads Abandonment Order as part of the Inquiry process, noting that today had been noted as being Day One of the Inquiry relevant to the Roads Abandonment. When his contribution was cut short and refused to be heard by Commissioner Donaghey, Mr. Hill stated (mic cut off at this stage), that he refused to jeopardise his professional integrity by participating in “this noise”, and called on all other professional engineers present to examine their conscience before proceeding with, what he termed, “a non-compliant” inquiry. The Commissioners ordered that the police be called, Mr. Hill advised that was not necessary as he was leaving himself.
There followed a short recess, and upon resumption it was confirmed that Mr. Hill was being excluded from not just the remainder of the day’s session, but the remainder of the conjoined inquiry. When queried by legal counsel for SOS on what grounds, we were advised that he hadn’t taken advice to sit down and be quiet, and he was being excluded as a Public Order Offence under the 1994 Act.
Counsel for SOS, Mary Brolly noted that she had highlighted, on numerous occasions, feelings of tension and frustration around this inquiry, and that people felt they weren’t being hear. She recounted numerous instances which supported the perception that there was a different attitude/approach to third party environmental protectors, noting that more than one Commissioner had requested that people make submissions “quickly”, and she called for a degree of understanding as the remainder of the inquiry is to be set and worked through.

In response to the opening question of the day from Commissioner Donaghey, DfI confirmed that they had not submitted a Statement of Case in relation to the Abandonment Order. In terms of the process, Mr. Elvin (legal counsel for DfI) advised that the application is made to DfI, DfI consider the terms, it is then for the applicant to prove statutory requirements have been met. He further advised that for the Department to consider abandoning a road it had to be proven, Under Article 68 of the The Roads (Northern Ireland) Order 1993, that either a) “the road is not necessary for road traffic”, or b) “the provision of alternative facilities for road traffic” exists. Although the Department was “satisfied in principle” with the application for the abandonment order, he noted that it involves a departure of standards and continued the DfI theme of passing the buck by stating that it was up to the applicant to prove its case and to the PAC to decide. He also noted that there were at least two identified areas of contention – the vertical alignment and the Mass Rock – and that the applicant (Dalradian) must justify the terms of the order.
Following further questioning from Commissioner Donaghey, Mr. Elvin noted that a Draft Abandonment Order had been issued prior to the commencement of the inquiry. Commissioner Donaghey pressed further, does this indicate a Departmental decision or preference?

It was then queried by the third-party protectors whether the application was for a road abandonment or a “stopping-up” order.
It was claimed that the Department hadn’t taken any of the measures required under RSPPG 019, whilst Mr. Haughey insisted that although the Department may abandon the road, they cannot extinguish the right of way.
He noted that an Abandonment Order should not be applied for until planning permission has been granted, indicating that “this is prejudicial to anything further down the line”. The “alternative road” isn’t currently available, and that it can only be made available if some of the works applied for are permitted. This alternative is “not approved, constructed, certified or adopted”, which is contrary to the Abandonment Order.

It was noted that 32 local landowners had submitted a letter opposing the road abandonment, and the question was raised whether, given the state of the existing road, DfI were intentionally running down local infrastructure to permit the Dalradian application. Further questions were raised about Turbary Rights, PRoWs and whether DfI were aware of any title deeds relating to the existing road.

Dr. Louise Taylor, for SOS, spoke of the Department’s repeated claims of “neutrality” in the face of their actions to date, reminding them that they are tasked with protecting the public, who ultimately pay their wages, and that rather than being “neutral” they should be on the side of those protecting public health, biodiversity and the local environment, quoting Desmond Tutu, “If you are neutral in situations of injustice, you have chosen the side of the oppressor. If an elephant has its foot on the tail of a mouse and you say that you are neutral, the mouse will not appreciate your neutrality.”

Commissioner Donaghey questioned Mr. Elvin (DfI legal counsel) further on consultation surrounding the road abandonment, and he noted that ~2,000 objections were received (1,073 plus 845 petition signatures), and that FODC objected to the later date of the revised order (March 2021), having not objected to the original consultation in July 2016. Paul McDermott, Lead Planner for FODC countered this saying it was his understanding that “the council opposed abandonment from the start”. Mr. Elvin continued that The Roads Order extinguishes PRoW (68.2 b “any public right of way over the road shall be extinguished”), but not private rights or ownership, and that it was then up to the landowner on how to proceed, noting the potential for vesting. He said that the order has to provide for the carrying out of works, but if permission was refused then work cannot commence.

It was queried if DfI were pre-empting planning approval by including this abandonment order at this juncture, without planning approval, where access and public rights are to be sacrificed for private financial interest – how is this aligned to the Department’s remit, and to the legislation queried Mrs. Brolly for SOS.
Questions were also raised as to how the volume of objections to the abandonment had been considered by DfI when proceeding with the order? Mr. Elvin responded saying if the Department considers submissions are not capable of resolution then the application can be referred to public inquiry and that there was a “public interest balance” with the requirements of legislation. In response to the lack of statutory consultee input, Mr. Elvin advised that he was “not aware” of any responses from the likes of the police and fire service, but stated that as part of the process communications are sent to all statutory consultees, and if no response is received within a specific time period a reminder is then sent out.

At this juncture concern was raised with a number of third party protectors refused speaking time to address a “factual correction” and a “point of clarification”. This, alongside the expulsion of the SOS roads expert earlier in the morning, and a misquoted statement from Commissioner Donghey, where he referenced “any public right of way over the land shall be extinguished”, when the legislation actually states “any public right of way over the road shall be extinguished” – the Commissioner corrected this when it was pointed out to him, but the atmosphere was particularly fraught at this stage of the day.

Stewart Beattie, legal counsel for Dalradian, spoke next to confirm that they were seeking a road abandonment, not a stopping-up order, as the section of road in question “sits entirely within the site infrastructure”. The application was made under 68.4 (a) – “No order shall be made under paragraph (1) in relation to a road unless— (a) the Department is of the opinion that the road is not necessary for road traffic or that another road is available which provides, or is capable, if improved, of providing, alternative facilities for road traffic”. He confirmed that if approved then PRoW will be extinguished, under 68.2 (a), and advised that the acquisition of land along the route has been completed.

Commissioner Donaghey asked whether, in reaching a preliminary decision that the road is no longer necessary, what assessment was made by the Department?
Mr. Elvin confirmed that this was not undertaken, rather it was referred to the Public Inquiry.
Given the quantum of responses received does the Department view this as a road that is used locally?
Mr. Elvin stuck to the DfI line, saying that was up to the PAC, that the Dept. hasn’t resolved the issue of necessity.

Cormac McAleer highlighted the use of language, presumably from DfI, on some of the maps submitted, which noted the abandonment of an “adopted track” at Crockanboy Hill and a “track to be abandoned”, and he asked why the Department was using this terminology and not “roadway”? During the course of his submission he also noted that there is, along this road, a memorial stone to local man and Greencastle 5 founder, Oliver McCullagh, which he added “won’t be moved”.
He queried why the Department thought it fit for purpose to pass this on, without due process, when they are the ultimate decision makers, asking why did they make so little of this important infrastructure, which further evidences the attitude from DfI and Mr. Elvin to date.
Counsel for SOS supported this view that ultimately the consultation was little more than a tick box exercise and that no further action was taken. Mrs. Brolly asked what steps were taken by DfI before presenting this to the PAC, again questioning the bias (subconscious/unconscious/other) being shown to the people directly affected and impacted by these proposals – the local community, who she reminded the inquiry were people, not “receptors”.

The history of the road was then discussed, with one submission noting it dated back to the 1600s and querying if there was vestment documentation available for it? As an access route to The Royal Chartered Market of Frederickstown (present-day Greencastle) surely it would have its own folio with notes of easements, rights of way, etc? Has due diligence been carried out by DfI? How can they propose any alternative if they don’t know who owns the land? The result, it was claimed, was bias and adverse impact on the local community.
Further questions were asked why DfI propose to abandon a road when there is no public requirement or demand to do so, but there is a vested private, financial interest from Dalradian? DfI were reminded that they are custodians of the road, not owners of it, and that the stance they had taken to date was solely to facilitate the company. Their own documentation noted there must be an identified need – there is no public need for the abandonment.
At this juncture it was pointed out that there did exist a DfI Statement of Case, having been submitted outside the deadline set by the PAC by DfI Roads, and that this was available on the DfI website, but the Commissioners ruled that this was outside the parameters of the inquiry and was not considered. When Mr. Haughey proposed it be brought as new evidence, he was quickly told by Commissioner McParland, “No”.
Mr. Haughey continued by highlighting DfI RSPPG E067 v2.1, paragraphs 191-195, which deal specifically with road abandonment, and how this ran contrary to the actions of DfI to date.
Fidelma O’Kane (SOS) spoke next on the people of The Sperrins asserting their right to the road on 3rd April 2021, with copies of the assertion sent to the statutory planning bodies (FODC & DfI Roads), and she reminded those present that this assertion still stood.

Undoubtedly the most powerful submission of the day came next, from Olivia McCullagh, daughter of the late Oliver McCullagh, who spoke on the use and value of the existing road to the local community, and to her family. She recounted how she had been running the road since she was 13 years old, going onto represent Ireland as a distinguished runner herself, and how her now 13 year old son uses the road as part of his training (indeed he was out at 7:30am this morning), and he represents Ireland as a boxer. She spoke of the recent Darkness into Light charity walk hosted along this route, and how it is “not just a strip of road, it is a part of us”. She mentioned the memorial stone placed along the road for her father, and the people before him, and how the road continues to be used for Emergency Vehicle Access during the annual Greencastle 5 Road Race each St. Stephen’s Day. She reiterated that an “alternative road is not wanted or accepted” by the local community, and that her hope for her children and future grandchildren was that they too would be able to continue using the road their relatives had, that the health and well-being of future generations would not be destroyed by a toxic waste dump sitting alongside any proposed alternative road. With that, in an atmosphere you could hear a pin drop, the inquiry broke for lunch.

After lunch DfI Counsel, Mr. Elvin, noted public costs for this part of inquiry are paid by DGL, confirming that this expense doesn’t come out of public purse in response to a query under paragraph 195 of the RSPPG E067 v2.1. He claimed that DfI have made no decision on the Road Abandonment Order (RAO) at this stage.
SOS Solicitor Mrs. Brolly noted DfI stance advised by Mr. Elvin on no decision yet taken on the RAO, however uploaded/ available documents contain a ‘Abandonment/ stopping up order’ in favour of DGL dated 3rd February 2016.  This is not marked as a draft order.  A schedule of costs billing sent to DGL in 2015 associated with this.  Mr. Elvin noted draft orders are signed and can then not be proceeded with, which is what happened in this case.  Costs were spent processing this original draft and were billed to DGL.
Mrs. Brolly sought clarification on consultation around both the road abandonment & realignment proposals.  We are only aware of notifications i.e. advertisements in newspapers as opposed to consultations.  We would contend no consultation with respect to road abandonment and road re-alignment.  No site investigation, geotechnical reporting, EIA were shared with third parties.  Commissioner Donaghy noted the EIA for the entire mine application should encompass this element – other queries were not responded to.

Mr Beattie (Dalradian) noted un-tarmacked nature of road, claiming that the applicant believed it to have been constructed 1837-1854, and asserting that it did not exist in the 1600s, although this point was later challenged by Peadar Mac Gabhann, SOS Cultural Heritage expert, who referenced Brian Friel’s play ‘Translations’ and the context of royal engineers & indigenous Irish over the mapping process which was considered a tool of colonisation in Donegal and amplified more so in the area under discussion, noting that we need to be careful that we don’t accept that the road didn’t exist simply because it isn’t on an OSNI map at that time.

Another third-party protector referenced a text where the high road between Rouskey and Pomeroy was used on Tuesday 3rd November 1775 and included in a Statement of Case submission to the inquiry, whilst a further speaker noted that it was not up to the applicant or their legal counsel to determine if there was a need for the road they wish to abandon – that this is, in fact, DfI Road’s responsibility to assess.  The condition of the road in terms of the failure to maintain it, does not mean that it is not widely used by the community, which it is. The Department are seen to have abandoned the road already, perhaps with a view to assist this application – there is certainly a perception of this locally.
FODC lead planner Mr McDermott noted that the condition of the road was referenced in FODC’s statement of case – paragraphs 4.3 – 4.4 and was very topical in the council chamber, remaining a matter Council are engaging with DfI on.

Mr. Beattie (Dalradian) went on to state that access to The GPO “is a trespass”, with the applicant of the view that the “same applies to the Mass Rock”.

A Dalradian supporter, Sean McCrory, offered a short submission in which he noted that “all changed in 2016 when Dalradian came in” – about the only thing of substance from his brief contribution before he left the inquiry.
As was noted at the time, no clarification was provided for those speaking for Dalradian in terms of their financial interest for doing so, despite being raised as a matter for concern with the Commissioners.

Contrary to Mr. Beattie’s suggestion that the road proposed for abandonment had nothing to do with the Greencastle 5, it was noted by a race steward that this road was actually favoured as a warm-up track due to it’s “more forgiving” surface, and with the site being on top of ‘The Hill’ it was actually an integral part of the run. Representatives for the applicant were also advised not to make assumptions on people’s connection to the land when offering their opinions.

Kevin McVitty spoke next on his work for Dalradian “surveying” the road to be abandoned, although he spent the majority of his time talking about the Green Road this was worryingly not picked up on by the Commissioners, as it had no relevance to the topic being discussed. Ultimately he submitted that he made three short visits to the site and he contested that, contrary to the description from FODC in their rebuttal that the survey was limited and cannot be relied upon, he was an authority who should be considered as such. His submission was subsequently picked apart, from his visits during Covid to the site, to statements like “no paraphernalia associated with tourism” being noticed (although this description was not defined further by the applicant), to his questionable understanding of sheughs along the road and his random passing opportunities (which could have been a description of the Camcosy Road) this was an individual out of his depth. Indeed, he spoke at length about sensitivity, only to then suggest that the memorial stone for Oliver McCullagh should be located at “a suitable point” along the race route – for this read “somewhere more convenient for Dalradian”.
Mr. Elvin again confirmed that DfI carried out no assessment, that they had left it to the applicant to satisfy the PAC.

Next up was a written submission from a Michael McDermott, who we were advised by Mr. McAvoy (Dalradian) was a member of the “Silent Majority”. He spoke of the road to be abandoned as “an isolated place”, which is exactly why so many local people avail of it for recreational purposes. Indeed, rather than this being the “problem” he suggested, this splendid isolation was part of the appeal, the safety posed to users and the peace and tranquillity of the area were what made the place special and worth protecting. It was pointed out that a quote to him, attributed back to the 1960s was “a bit outdated, much like the current mining legislation”.

Caoimhe Warnock then spoke from the audience on behalf of Martin Conway, Chair of Greencastle GAA Club, to confirm that the road was viewed as an essential and integral part of the local community, that it was used by parents who dropped children off to training at the club, that it was used by players (particularly during pre-season when pitches can be water-logged and the gym can be over-subscribed), and that the positive impact that this has on local people’s health and well-being is valued much more than the threat of imposing a toxic waste pile beside the Gaelic Grounds, Community Centre and any proposed alternative road.

The Rural Needs Act 2016 was brought up in relation to the removal of public infrastructure to suit private interest and the question, where is the evidence rural needs have been assessed and evaluated in this proposed abandonment was posed.
Rural Needs Impact Assessment, Human Rights Impact Assessment and Ecological Baseline Assessment were all to be discussed further under future topics/subtopics we were advised. Clarification was given that Ecological Assessment was to be revisited in the Non-Water Ecology section (currently not timetabled).

That DfI have failed to carry out their own assessment in respect of this, relying instead on the word of the applicant and mindful of the threat posed by this notoriously toxic industry was disappointing stated Mrs. Brolly, noting that three short site visits was completely insufficient.

It was again pointed out to the Commission, and all those present, that the local community was not specifically complaining about the new road, but rather the reason for the new road – to accommodate Dalradian’s toxic application.

Local man Eddie McCullagh spoke next, detailing how during the inclement winter weather he has no option but to use the road proposed to be abandoned given it’s lack of incline, and that he also uses it for turbary rights and for recreational purposes, as do his children. He noted that the applicant had 40 tonne trucks driving the same road back in 2016 for their drilling pads, so there was further proof that the road was structurally sound. He identified that previous contributors for Dalradian, from Sean McCrory and Michael McDermott were not actually local to the road in question, despite pretences to the contrary, and that both stood to gain financial benefit. He also recounted bringing his concerns to Brian Kelly of Dalradian in 2015/16, only to be told that he wouldn’t be getting through their land. Finally he pointed out that his own house had been removed from some of Dalradian’s maps, which he suspected was done to make the area seem more isolated than it is in reality.

Another speaker from the audience, Kerry McCrory spoke how her and her husband farmed sheep locally, and how organic farming is practiced as much as possible as the people locally value the area, the ground and their environment – they recognise that there’s an ecological value here, and all of that must be protected.

Josephine McCullagh, a sister of the late Oliver McCullagh spoke to contradict Michael McDermott’s denial of the local Mass Rock, noting that her uncle had spoken of its existence in the early 1900s and that she herself knew about it from the time she was a child.

Mr. McVitty, in response to some of the rebuttals which had earlier come his way stated that the “sheughs were not well engineered”, that he did see them and he understood what they do, but that he had carried out a desktop survey coupled with these short site visits to reach his conclusions in support of the applicant. He also stated that issues around his visits occurring at the height of the Covid pandemic as “completely outside my control”.

And that drew to a close Day One of the Road Abandonment discussion, with Commissioner McParland then taking over to discuss further proposed timetable amendments, pending the outcome of the joint Judicial Review being taken by FODC & Dalradian this Friday. She advised that this process was not adversarial litigation and that there was no right for the last word, and with this it was proposed that they run the Landscape topic without FODC/Dalradian next week as scheduled, but that both parties (if successful in the JR) would be afforded the chance to contribute their submissions at a later date (as yet to be confirmed). This was proposed as a cost saving measure, as well as one which kept the dates pencilled in for next week live.
Legal Counsel for SOS pointed out that this was not, in fact, a saving but rather an additional expense as those wishing to attend and contribute would have to attend next week and as yet an unspecified number of additional dates at some stage in the future. It was noted that this goes against the narrative surrounding the inquiry, and that rather than a cost saving this is actually a duplication of expenditure, which most adversely affects the third party protectors and offers a distinct advantage to the applicant who will have advance notice of the questions posed and an undetermined period of time in which to prepare responses. It was confirmed that should additional dates be added to accommodate FODC/Dalradian, then the third parties would be able to participate fully in these further sessions. The cost of third party experts (who may now have to attend two different sittings of the same topic) was highlighted as an issue, as was the unknown future date with potential impacts on expert availability.
Mr. Orbison (NIE Networks) queried when would the cumulative impacts on landscape be detailed, and was advised that this would follow the individual impacts.
It was then queried how much of the Road Abandonment topic remained outstanding, to which Commissioner Donaghey replied there was “a significant volume of questions still to cover”, and it was suggested by the Commissioner that perhaps this topic could be concluded next week as an alternative, pending expert availability.
In response to a question from Mrs. Brolly the Commissioners confirmed that Mr. Hill was not going to be let back into the inquiry.
A further request came from other third party protectors that a proposal for a new timetable is put forward as the process risks becoming procedurally biased, noting that topics should not and cannot be “changed at a whim”, with the Commissioners being reminded that the current timetable risks being changed due to Dalradian & FODC, and that full participation of the third parties is required throughout.
This is all to be taken away and considered overnight by the Commissioners, who will provide an update tomorrow, with the day finishing up at 5:15pm.

Huge thanks again to all who contributed today, it is truly appreciated, we’ll see you all again in a few hours – feel free to drop in if you’re interested in hearing about the proposed abandonment, or in witnessing how the inquiry works.

No cameras. No problem. Artist's impression of the SOS team hard at work in the PI.
Day Fourteen

Roads Risks and Responsibility 

Discussion returned to DfI’s proposal to deal with counter-charging the applicant for damage to the roads caused by mine traffic (if permitted) through a Section 76 agreement, in lieu of an Article 11 agreement as originally suggested in DfI’s submitted documentation.  Mr Elvin (Counsel for DfI) noted that a video survey could be taken to record a baseline and the area inspected for repair 6 months before end of construction phase or 12months before operations commence.  Mr Elevin noted that a clause for determination could be included for dealing with disputes.  Mr Beattie (DGL) noted he had taken instruction overnight from the Applicant, DGL were content that this be dealt with through a Section 76 agreement.  Mr Elvin then sought the Applicant’s thoughts on whether the responsibility for repairs should apply to construction & operation or only construction.  Mr Beattie noted that the Applicant thought this was unnecessary post construction, with repair works completed at this point being subject to a 12month defects liability which could be considered as a 1 year warranty. 

Third party contributors were then invited to give their thoughts and outlined the lack of detail around what was being discussed and how this could be enforced.  Queries began: What Road infrastructure is to be covered by this? Who would assess the damage & determine remedial works and at what frequency? What baseline information has been or will be established?  If no bond mechanism is put in place, is this agreement enforced under injunction?

Mr Haughey, an independent third party objector noted that he had made an urgent procedural application last night, as he believed this change from an Article 11 to Section 76 represented a material change to the project, noting that road deterioration, ‘extraordinary traffic’ (as referenced in the NI Roads Order 1993), repair liability, financial security or infrastructure impacts have not been agreed nor information shared with third parties to meaningfully consider this.  Third parties must be provided with full wording, evidential basis & opportunity to respond.  Summarising this as an expense recovery mechanism due to damage caused by excessive weight on roads.  His view was the inquiry should be suspended, until DfI disclose full wording of proposed agreement, DfI provide all baseline road & structural data, proposed monitoring, repair triggers, bond/ security, indexation & enforcement arrangements.  Mr Elvin (DfI) rejected this, noting his view that the inquiry was the appropriate forum to interrogate information.

Mr Hill (SOS, retired civil engineer) note that a video record as a baseline is insufficient – this would be a preliminary task in advance of the necessary meaningful assessments. integrity, drainage.  A team of people are required to carry out specialist inspections.  A Geotechnical engineer would assess stability of embankments, skid resistance, structural integrity; a drainage engineer would consider drainage, a lighting engineer would consider signage aspects, environmental engineer would explore relevant matters etc.  DfI Roads as the Management Agent for the road should know what is required and/ or be able to subcontract out relevant inspection reports to independent specialists on their minor works framework agreement.

SOS Solicitor Mrs Brolly, noted that with this section 76 proposal third party protectors are again very much in the dark.  Financial redress for road damage should be in place for life of mine & thereafter – throughout decommissioning phase.  Unknown parameters: identification of parties, content of agreement, duration, community involvement.  Without full information for the proposal we are in the dark, on workers (questionable car-sharing 4 per vehicle for construction, 2 per vehicle operation to control vehicle numbers on site), on haulage of concentrate (destination unknown).  We are again very concerned a talk of no bond, having previously disclosed our concerns on DGL, Wheaton, Kayman Islands, Orion and now a contractual basis being considered for DfI Roads to pursue DGL for costs.  DfI Roads advised to exercise great caution, bonds are commonplace for minor developments and ought to be considered rather than litigation and injunction proceedings.

A succession of third-party objectors described the video survey as wholly insufficient baseline mechanism and noted that road repair responsibility should continue throughout the life of mine operations, decommissioning and 12months beyond this (if applicant permitted).  One third party representative noted that 54,000  HGV journeys were planned over the two year construction period, with 218,000 HGV journeys planned over the 23 year mine life and staff vehicle movements in excess of 2 million journeys over the same period – damage to the local road network over the entire project life is fully predictable and repairs should be carried out at the expense of the Applicant.  All bridges, culverts and services on the effected roadways should also be considered (Drumlea bridge, Pollanroe bridge highlighted on Crockanboy Rd, Attagh bridge impacted on Camcosy Rd); with appropriate survey tools used – Ground penetrating radar etc. as necessary.  One third party objector noted that the baseline survey should stretch from the Crockanboy Road junction at Newtownstewart to Creggan crossroads.

Commissioner Donaghy sought clarification if there would be a series of Section 76 agreements potentially adopted or if it would be a single S76 with different sections relating to each issue agreed through this mechanism, if scheme permitted.  Mr Elvin confirmed latter would be the case.

DfI consider adequate consultation has taken place around Transport Assessment –third party objectors dispute this, querying what consultation if any, has taken place since the sham consultation exercise at Camcosy Rd in November 2016.

A local community member Sean Clarke, spoke from the audience, noting he was a founder of St. Patrick’s GFC in Greencastle in 1969 and club secretary for 40years, and never had any contact/ communication from DGL.  Mr Clarke noted that the club was the hub of the community and should have been consulted on proposals.

A third party objector raised key receptors for consideration in a Transport Assessment: school & pedestrian safety; community exposure to HGV Risk, community use & industrial traffic.  Kids walking & cycling to school, early arrival at school/ nursery/ daycare facilities for breakfast clubs all require consideration.  With mine operations planned 24/7, 365 days a year, parking on roads to attend wakes will introduce situations where roadways are reduced to single lane traffic, how has this been considered?  The safety of people is paramount, proposal is considered a threat to life.

A retired principal in the audience, was compelled to speak, noting his shock when he learned of the extent of HGV traffic involved and that the local schools had not been consulted or involved in the process.

Commissioner Donaghy asked third parties if the Applicant’s rebuttal in relation to Transport queries addressed their concerns or if they had further concerns.

A third party objector noted that a child specific road safety assessment was a fundamental omission from the submitted documentation.  He noted that NI are current bringing in a law to ban vehicles overtaking school buses – referencing Greencastle PS (Our Lady of Lourdes).  No mitigation in place, no studies undertaken of where children walk/ desire line exercises conducted or included.  He noted that these foreseeable risks should have already been identified by the Applicant and/ or DfI Roads on assessment with third parties then commenting on them – rather than pointing these out in the first instance at this late stage.

SOS Chair, Marella Fyffe shared powerful personal testimony noting that as a youngster she lost a brother to a HGV accident.  She posed the question: Will the parent of the first child killed by a HGV be content with the rebuttal information?

A third party objector highlighted the number of young relatively inexperienced drivers locally – school children/ with 17-18 year old pupils travelling to 8 different post-primary schools locally.  One objector noted that the project before us was incompatible with rural life in the area, referencing the Annual Average Daily Traffic (AADT) capacity level of 10,800  for the Crockanboy Road put forward by the Applicants traffic consultant yesterday, & the proposal adding an additional 270 vehicle journeys daily to the current level (circa 1300), with the rationale appearing the local community should perhaps be grateful this is not more.  This additional traffic will have major implications on road safety locally, it represents a massive risk to our area.

Local resident Barbara Ward noted that a child was killed getting off the school bus approximately 20 years ago on the Crockanboy Road.

Objectors asked that questions be put to DfI Roads on how they accept the Travel Plan submitted within the original application in the first instance?  Commissioner Donaghy invited any further comments from DGL, DFI / DFI Roads.  Mr Beattie stated that in the applicant’s view adequate consultation had been carried out. Mr Elvin noted DFI Roads position as regards HGV traffic remains same as yesterday.  Mr Murray (DfI Roads) reiterated that their position hasn’t changed on process went through yesterday.

Mr Dorman (DGL Traffic Consultant) noted that a study had been undertaken in the area around the proposal, at pick-up/ drop off times at Greencastle PS and movements observed were typical with any rural primary school, school signposted, noting traffic calming measures in the area.  Majority of HGV movements kept outside peak hour (8-9am).  Every road user should be aware of the risks.

Third party objectors contended that it was not a typical situation where the local shop is in close proximity to Greencastle PS, children know where this is and perhaps have a line of sight to it, however it requires the crossing of two roads to reach this.  There are no traffic lights in Greencastle, nor pelican crossings to facilitate safe crossing.  Similarly in Gortin there is a shop across the road from the Primary school, with no traffic lights or pelican crossings in place.

Mr Elvin noted that the Traffic Assessment was consulted on, noting it was subject to transboundary consultation.  It is worth noting, whilst not picked up at time, the transboundary response by DGL TBR 20 document on Traffic reads only ‘Dec 2025 No comments to make’.

The Applicant’s sustainable traffic & transport plan was then discussed with comments sought first from FODC on their view if concerns had been addressed by the Applicant’s Transboundary responses. 

Mr McDermott (Lead Planner FODC) noted concerns remained as outlined in the Council’s Statement of Case & Rebuttal documentation.  Sustainability plan is ‘long on promises and short on outcomes or guarantees’, highlighting how measures such as car sharing or use of alternative forms of transport were to be ‘promoted’, and paragraph 5.5 which reads ‘It will be the responsibility of the (Travel Plan) Co-ordinator to review the effectiveness and cost efficiency of the Travel Plan,’ introducing an opt out clause.

Third party objectors noted the lack of depth, aspirational nature of plan and problems with enforcement, with one contributor labelling it meaningless.  Another third party representative queried how realistic the car sharing proposals were, citing travel hub Ireland noting a 10% uptake over 3 years and a 2025 study by Essex County Council with a 5-10% update.  What measures are in place if this element is unsuccessful or underperforms significantly on targets set?

Mr Elvin (DfI Counsel) conceded that he could see problems around enforcement measures and that improvements could be made to the travel plan.  This was a new stance with DfI in RR15 previously accepting/ adopting the plan put forward by the Applicant.  Mr Elvin suggested that an equivalent plan be agreed/ submitted for approval by DfI; or equivalent obligation be put into a section 76 agreement to address this point, citing S76 agreements he had previously seen where financial penalties were introduced where aspects didn’t work or underperformed (such as car sharing). Mr Elvin noted ‘I see criticisms that it is internally policed rather than open to external scrutiny’, acknowledging concerns on the performance matrix & enforcement/ monitoring elements.  “Public interest requires a better response”.

Commissioner Donaghy noted that this was a new opinion being expressed by the Department so opened floor to third parties.

SOS solicitor Mrs Brolly noted that it has taken DfI some time to identify & accept criticism of travel plan.  At this late stage in process, it ought to have been apparent long before now, are we now being asked to consider this under condition with no details on what is being proposed?

Third party objector Niall McAleer noted his understanding that the purpose of this inquiry was to interrogate the submission before it and if aspects were found to be deficient this should be noted & the element rejected.  He queried why DfI continue to propose workarounds to plug holes in the information, offer the applicant further opportunities by kicking the can down the road, noting a perception that the inquiry is about facilitating the application rather than assessing it.  Commissioner Donaghy noted that this was the second aspect being couched into legal agreement in two days so did allow the query to be put to DfI.  Mr Elvin noted this response was simply listening to some of the objections, stating the purpose of the hearing was to respond to queries being made. 

Mr Beattie (DGL) noted travel plan is of some vintage, we recognise that (Appendix B4, 2017).  He noted that the car share provision is proposed to be implemented by mandatory mini-bus provision (4 per car in construction, 2 per car in operation).  Applicant considers an Article 11 agreement or condition a better way of addressing this aspect, DGL don’t consider section 76 agreement necessary.  Breach of condition, stop notice, we think adequate… I don’t accept financial mechanism necessary.

Mr McDermott (FODC) noted some policy context (15.4) Council would not accept because we are not in Belfast (following references to Belfast travel plan by DGL consultants) that the provision of sustainable transport should be minimised, it should be of greater importance (especially when considering scale & size of proposal).

Discussion moved to 37.9km Powerline Application – Commissioner Donaghy queried what roads would be subject to closure and for how long.  Mr O’Hara (DGL – Tetratech) noted installation of underground cabling may require road closures, not known definitively as yet, depending on where cable can be sited – verge etc, partial closures may be accommodated – any closures will be limited to 9am-4pm.  Mr O’Hara noted a 12-18months predicted construction period, with works planned 7am-7pm Monday to Saturday. 

Third parties noted concerns around 10months of road closures noted in submitted documentation, installation difficulties due to access difficulties (gradient, narrow lane access, bogland, farmers refusing leeway access), line selection (from Artigarvan – to be discussed again at Climate section); has transport modelling considered maintenance of 10m wide strip beneath powerlines/ between/ around poles?   Mr Orbinson (Counsel for NIE) noted NIE very experienced at producing powerlines like this, he believed over 1000km of powerlines has already been installed in the AONB by NIE & its subcontractors.

Formal questioning on traffic & transport closed.  Conditions next to be discussed, with Commissioner Donaghy advising these will be discussed without prejudice on the basis of the scheme being found acceptable, what conditions would then be proposed.  Draft conditions included in DfI submissions at SoC stage.  Third parties contended that the detail isn’t there to consider the majority of these, with some topics yet to be discussed to which these relate.

Lengthy discussion on existing mine infrastructure at Camcosy Road which is unlawful and subject to ongoing enforcement proceedings – presently with a separate PAC next sitting 08/07/26.  Mr McDermott noted FODC’s view that the exploratory site & explosives store should be treated as a greenfield site (as they are supposed to be) in condition wording.  Sub-standard visibility splays serving the explosives store access to the south of the Camcosy road again discussed.  Mr Beattie noted that this was investigated in 2014 and confirmed acceptable by DoE Minister 29th January 2015 through an AQW (assembly question), with a request that the accepted tolerance then be also accepted now for a planned future works (if permitted).

Third party objectors noted this has been a long running issue, with the deficiency highlighted to Strategic Planning and DfI Roads in 2014, with DfI Roads recognising there was an issue here & accepting a relaxation on the 2.4m x 60m visibility splay stated as achievable in SLR Drawing 12 at that time.  It was noted that the explosives store building was only shown on a site plan at 1:2500 scale in the K/2013/0072/F without the necessary floor plans & elevations provided for it to be considered and later in the 2014 application (K/2014/0387/F) this was wrongly presented as a relocation of a previously approved structure.  The matter was further compounded by the Keenan family submitting an planning application to restore a local vernacular dwelling in close proximity to the explosives store prior to the 2014 application being submitted by DGL, yet permission was refused on Mickey Atty’s due to inadequate visibility splays & the explosives store & mine taking precedence (K/2014/0600F).  Commissioners sought confirmation on the level of visibility splay currently achievable in this location this week.

Mr Elvin shared a draft condition on an amended travel plan submission, should the position be that this isn’t incorporated into a Section 76 agreement:

‘Prior to commencement of development a Travel Plan in substantively the form contained in Appendix B to the Environmental Statement shall be submitted in writing to the Department for approval.  Following approval of the plan by the Department it should be implemented and complied with according to the terms approved.’

Mr Elvin noted that the applicant’s Judicial Review on the Landscape topic proceeding next week, would be heard by Justice McAlinden on Friday 22/05/26, suggesting contingency planning may be necessary, as if this succeeds we don’t know what we’re doing next week.

End of a long day
Day Thirteen

Mine Would Transform Scenic Sperrins Road into Industrial Haul Route

Commissioner Donaghy led inquiry proceedings today, with responses restricted to narrow question parameters & third parties further limited by having to speak prior to comments or updates being made by the Applicant & statutory bodies. 

FODC deferred to DfI Roads on suitability of existing road network for this project as a statutory consultee with ‘expertise in this area’.  DfI Roads were represented by Mr Logue, Mr Kearney & Mr Murray. 

A third party objector noted, how can transport be meaningfully considered when we don’t know where the concentrate product is going when it leaves the mine gate?

Mr Hill, a retired civil engineer with 45 years experience in industry of quarrying, road design, health & safety and public safety spoke on behalf of SOS against the application.  He disagreed with the scale of the mining proposal in traffic terms and its impact – which would turn the Crockanboy Road into a Haul road due to the level of industrial HGV use on a daily basis.  Mr Hill noted this road was part of the central Sperrins scencie route, and promoted by the NI Tourist Board for its scenic beauty.  He asked DfI Roads to confirm when the road was last inspected, outlining how surveys should be conducted under best practice (scheme development highway agency DMRB) and absences from the submitted information.  Fundamental considerations relating to the specific location were missing, peak traffic events such as school pick-ups/ drop offs, events at the community centre/ football club, rendering this ‘desktop garbage’. 

Baseline data surveys completed in November 2015 (7 day survey at 13 junctions), with manual classified traffic counts carried out in April 2017 & September 2018, with a speed survey in January 2020 and a one day spot check in June 2023 (TR20 Appendices B + C).  Third party objectors queried if outdated data could be considered reliable, with one objector citing a report identifying data more than 3years old as unreliable.  DGL consultants Hoy Dorman referred to the consistency of traffic data from 2007-2015 as a suitable justification for the applicant’s assumptions to still be accurate – taken from published data from a fixed DfI Roads permanent traffic counter on the Crockanboy Rd.

Third party objectors spoke of surveys being superficial & questioned the failure to take into account the increase in tourism post covid 19, visitors holidaying locally, the Giant’s experience & Davagh forest/ dark skies initiatives being developed in the area, spike in local glamping pods, self-catering accommodation.  With no regular bus service in the area, it was noted that all young adults 18+ need cars to get about/ be independent.  One third party objector noted that best practice guidance for surveys notes these should be completed in designated ‘neutral’ months with the majority of these falling outside this designated period. 

Mr Logue (DfI) noted that in their assessment, the Crockanboy Road was treated the same as every other B Class road and did not see the need to carry out any surveys beyond those provided by the applicant.  Updates to applicant’s surveys ‘did not present anything significant’.  DfI have calculated growth factors up to the year 2037, based on proposal data provided by applicant.   The 2037 year allowed for mine construction and 15 years when this year was also referenced by DGL consultant Mr Dorman. 

Commissioner Donaghy asked DfI Roads if they had applied any reduction in standards to the application, Mr Logue advised ‘Not that I am aware of’.

Applicants DGL & NIE Networks were invited to make any additional comments, Mr O’Hara (NIE Consultant – Tetratech) noted survey data had been carried out in 2021, 2024 and Feb 2026 in relation to powerline application.  Commissioner Donaghy queried the 2026 data as not being submitted, Mr O’Hara noted this was used to verify their previous surveys remained accurate but did not form part of the submission before the inquiry. 

Mr Dorman noted an Annual Average Daily Traffic (AADT) level of approximately 1,200 vehicles on the Crockanboy Road as existing, noting Hoy Dorman’s view that capacity on this network could be 900% greater (10,800 per day).

Third parties queried if the 1,200 AADT figure remained accurate, noting that 1,300 was referenced by Mr Dorman on the one day spot survey in 2023 and also highlighting that the with the traffic easement works taking place recently at the Greencastle PS, a comparator should have been readily available for DfI Roads to double check current traffic levels. 

The increased risk to road safety for both drivers, pedestrians, famers & cyclists due to the high levels of additional vehicles (approx. 272 additional journeys daily) on the Crockanboy Road was repeatedly highlighted. 

Mr Hill (SOS) talked about the irrational journey route from the Camcosy road infrastructure, turning right across the Crockanboy road traffic to cross the narrow Drumlea bridge (stone arch bridge) to turn left onto Lenagh road followed by a right into a private holding and return to the Lenagh road (left) and then having to cross the traffic again to turn right onto Crockanboy Road.  This cumbersome movement highlighted the narrowness of the roads involved and best practice not being possible from the existing infrastructure site (now unlawful with planning permission long expired).  Mr Hill queried if the applicant could detail the material movement of this massive handling operation, what type of vehicle is being used? (6-8 wheeler), are traffic lights planned anywhere, stop-go boards to facilitate safe movement, what is moisture content of material? Is this netted or covered?  what about spillage/ breakdown?  Mr Dorman noted this route was only planned for the first year of construction (70 HGV journeys a day – 35 return trips).  However Mr Gordon (DGL)  later noted that this was to be retained for training/ secondary access post construction.  Mr Hill highlighted structural problems in Crockanboy Road, noting embankment slippage and cracks; manhole covers on road on zone of wheel track so will crack, poor drainage exists on the road with the odd gully trap, piped culverts/ stone culverts beneath road also at risk with heavy vehicle.  Mr Hill noted a daily safety inspection would need to be put in place if application was to be permitted (recommending twice daily). 

One safety measure put forward by Mr Dorman (DGL) for the Camcosy Road interface with the Crockanboy Road, was to provide a high friction surfacing on the Camcosy Road near junction – it was noted by third parties that this was ineffective in snow/ frost.

One third party objector noted that there was no allowance for farmers moving livestock on the road – dairy farmers move cattle twice daily for milking, local events such as Gortin Mart on a Monday night which draws a big crowd, and similarly underage & senior team training at local football clubs (both male & female teams) regularly draw crowds most evenings, alongside larger events such as the Greencastle Run on Boxing Day which is internationally known.

One third party objector queried if transported modelling considered slow moving traffic such as tractors on the roads, or indeed peaceful protest which the scheme if permitted would undoubtedly attract – referencing the GPO protest camp at the proposed site which has now been there 8 years.

Another third party objector noted that the Omagh to Derry Road has an Annual Average Daily Traffic (AADT) level of approximately 13,000-14,000 and highlighted the absurdity of Crockanboy Road being considered to have a capacity of 10,800.  He noted that the traffic distribution proposed is based on a lot of assumptions – 30/70 east-west split referenced in documentation unproven, highlighting significant impact of Heavy Good Vehicles (HGV) journeys proposed over life of the mine 26,981 one way and 53,962 two way journeys.  How has the cumulative effect over years been assessed?  The weight of vehicles themselves, especially when laden will damage the road.  The third party challenged that the applicants sensitivity testing had not been stress tested for failure of car sharing model (4workers to a vehicle during construction considered highly unrealistic), single occupancy car travel to work commonplace, especially when considering the nature of shift work; how 44,000 tonnes of explosives would be moved to site over mine life; 3.3m litres of diesel, concentrate movements, peak construction & operational overlap must be considered; alongside school traffic at drop-off/ collection, seasonal tourism, farming traffic (citing sileage/ slurry  spreading from February to October in the area).

Congestion caused by HGV’s, additional delays, frustration/ road rage at a toxic industry not wanted in the area, accidents, abnormal load disruption – cranage, large machinery, winding/ undulating nature of local roads all needs to be considered.  Proposed staffing across administration, day operations & night operations during mine life resulting in 123 one-way and 246 two-way journeys daily to account for 425 people employed in the mine 365 days a year 24/7.  Traffic assessment based on assumed car behaviour, not measured, hub based travel unproven, limited car parking available at identified location and proposed mine site itself.  This proposal also introduces movement at night, which has not been there before – this is a quiet rural area 10pm -5:30pm.

A single joined up materials movement schedule should have been provided by the applicant, not sporadic documents & movement variations across multiple submissions received to date.  A consolidated document should consider movements such as underground & overground waste, paste backfill materials, binders, flotation chemicals, explosives, concentrate leaving site, waste material leaving site, abnormal loads, decommissioning traffic, construction plant, drilling rigs etc. as all affect road safety, emergency access locally and can cause disruption.  With narrow road widths locally, damage to roads, verges inevitable, pollutants such as CO² from exhaust fumes a further consideration.

A local mother raised concerns on if a lorry broke down on the narrow roadways locally, how would this impede on emergency services access, if the vehicle contained explosives for example, would the road be closed?

Entirety of road network affected by this application of concern to local residents and third parties.  Area not considered compatible with this application – substandard visibility splays highlighted by one third party objector in relation to the access route to the explosives store to the south of the Camcosy Road, where enforcement action on this expired planning application is subject to a separate PAC hearing.  These sub-standard visibility splays were deemed not expedient to enforce in 2015 by DfI Roads due to temporary nature of 3 year permission – are they now to be permitted for 40years if this application is approved?

DfI Roads were asked if their assessment considered the 44,000 tonnes of explosives reaching the site or 65 tonnes of concentrate per day leaving the site?  DfI advised that they would have considered anything that was included in the applicant’s transport assessment at that time.  (This information was unavailable to third parties until after inquiry commenced). 

Commissioner Donaghy asked DfI Roads if any sensitivity testing had been carried on whether assumption of 4 employees per vehicle can’t be realised.  Mr Logue (DfI Roads) noted he didn’t believe this would be significant to the transport model, or assessed as as a significant change.  When pressed again on the question Mr Logue noted he was not aware of any testing in this.

Updated traffic generation tables discussed (Page 268 of C22Transport Assessment Addendum July 2019, Appendix 5) and tolerances built within this to detail journeys associated with concentrate and explosives. Addendum removed 70-30 east west split and replaced with 50-50 split. Query over whether applicant could transport explosives in 25tonne loads raised by third parties.  Mr Merry (DGL) confirmed that 97.5% of 44,000 tonnes (ammonium nitrate blasting intermediate) was classified as class 5 and could be transported in these quantities.  2.5% of 44,000 tonnes needed to be transported in line with Carriage of Explosives Regulations (NI) 2010 which had smaller limits (detonators, caps referenced as more hazardous).  Commissioner Donaghy confirmed this breakdown was not in documentation previously shared.

SOS solicitor raised human rights impacts of the increased traffic proposals, voicing concerns on noise, dust, congestion, inadequate risk assessment, people have the right to a healthy environment, the right to privacy, the right to cultural life and the right to freedom of movement. 

A third party representative noted that roadways locally are constrained, narrow carriageways, bends & gradients and vulnerable road users (elderly, cyclists, families walking, children).  Roads may appear on a desktop study to have spare capacity in terms of AADT, but be geometrically and operationally unsuitable for larger volumes of traffic. Traffic assessments must consider road width, bends, vertical changes/ crests, junction visibility, passing opportunities, verge conditions and footway absence.  The legal planning test is safety not capacity (PPS 3: AMS2), where access cannot prejudice road safety.  Road safety must be promoted and adverse affects mitigated on vulnerable road users.

Local resident Barbara Ward spoke of the problems with HGV traffic on the Camcosy Road whilst exploration works were ongoing, noting that passing bays were inadequate and two vehicles cannot meet without both cars going into ditches.  She noted local people were originally told 15 years ago that they would always have precedence over HGV’s, however it is the locals who have to give way to lorries coming through, passing bays not used by lorries.  She also noted that people who live in this area, part of the AONB and have chosen to raise families here to experience nature, could not take their children out on the road due to the increased traffic, dust, noise created during operation.  Bill Donnelly noted that in his view, the number of HGVs on the roads is likely to be the single biggest impact on the lives of local people from his experience living near the Cavanacaw mine.

Discussion followed on how the damage to the roads caused by mine traffic (if permitted) would be charged to the Applicant and how this could be monitored/ enforced.  An Article 11 agreement had been suggested in submitted documentation as the appropriate mechanism to deal with this.  Third party contributors noted that the Crockanboy Road was ill equipped to deal with mine traffic and serious concerns remained on the absence of baseline surveys for the condition of the road and how ‘extraordinary traffic’ as identified in the NI Roads Order 1993 would be established/ agreed to enable this to be used as a maintenance recovery mechanism for road deterioration over 25years.  The question was posed had DfI Roads recouped any monies from the Applicant for damage to the Camcosy Rd  during exploration works under Article 11?

Following contributions from third parties & DfI Roads, DfI Counsel Mr Elvin noted that DfI would now propose to deal with this through a Section 76 agreement, using a video survey of the road pre-commencement as a baseline for future repairs.  Commissioner Donaghy noted this was a new development and would be discussed further tomorrow, bringing proceedings to a close.

A timetable update was then requested, with Commissioner Mc Pharland advising an update for the current proposed dates should be available by close of play tomorrow.

SOS Outreach - Active in Japan
Day Twelve

When is a Waste Facility Not a Waste Facility?

The day began, as it was to end (more about that later) with a discussion on the inquiry timetable.

The Commissioner confirmed that a further amendment to the timetable had been made, with Landscape to replace the Non-Water Ecology Topic pencilled in on 26th, 27th and 28th May, however neither FODC or Dalradian were supportive of this change.

I again reiterated the procedural unfairness and disadvantage we, the local people – particularly those in full-time employment, those with children or caring responsibilities, were being placed in with an incomplete timetable and missing topics, and made the plea to the Commissioners that, mindful of the legal obligations under the Aarhus Convention that efforts be made to postpone the remainder of the timetable until April 2027, which would coincide with the new financial year for resourcing implications for the PAC/WAC.

The Commissioners confirmed that the proposed spreadsheet related to Tourism economics figures from Mr. Pat Haughey discussed yesterday was not being accepted into inquiry evidence, which brought accusations of double standards, but the Commissioners were quick to stress that this was an unfounded allegation and noted that third parties had evidence accepted earlier this week.

Questions on the Development Plan then commenced, with Q.1 for FODC querying whether the new area plan superseded the Omagh Area Plan, and whether Strategic Planning Policy Statement (SPPS) had materially changed. Mr. Fegan for FODC confirmed that the Local Development Plan was the most updated document, and that mindful of responses to these questions when the inquiry met last year he didn’t intend to add much to the previously recorded comments. He did note, in relation to the SPPS question that nothing of materiality had changed, and having checked the tracked changes the only identified amendments were capitalisation of letters.

Whilst noting that need is a material consideration, he detailed that SPPS details need should be balanced against impact on the environment.

In relation to the specifics of the LDP Mineral Policy it was also noted that points j) & l) must be met within Areas of Constraint on Mineral Development, otherwise there is a presumption against mineral development (that is j, that the mineral is valuable; and l) the development is for less than 15 years duration.

In his contribution, Michael Gordon for Dalradian claimed that they wouldn’t expect the introduction of ROMPs to affect their plans if introduced during the proposed timeframe for the mine, and claimed that 25 years was “short term”, seemingly at odds with Mr. Merry for Dalradian who had previously classified five year jobs as “long term”.

In response to the Dalradian contribution Mr. Fegan opined that there was a general attempt by the applicant to restrict or downplay local policy that they don’t like as they’re slightly stricter and he pointed out that Dalradian were “largely unsuccessful” at independent examination of the LDP when they attempted to make the same arguments. Mr. Fegan said, the applicant was asking the Commission to give less weight to the local policy documents that they don’t like and may find hard to comply with. As had been agreed at independent examination stage, sound judgment was shown by the Council and the general line of argument pursued by Dalradian was one we should be sceptical of said Mr. Fegan. He continued, just because you claim there’s a 15+ year resource there, doesn’t mean you’re entitled to dismiss the 15 year period noted in the LDP, mindful that safety and environmental standards evolve and improve over time. Things move on, some things are unforeseeable.

Speaking on “investor uncertainty, Mr. Fegan noted that this was not a good reason to set aside planning policy, and just because it’s a less attractive investment doesn’t mean planning policy, which is designed to protect the environment, is set aside.

A material consideration does not change the application of relevant planning policies, particularly in a specially designated site (AONB, ASSI, SAC, RAMSAR, etc.)

In response to Dalradian’s claims about “a modern mine” it was countered that surely such a modern mine should be compliant with modern mining guidance, such as that accepted into evidence by the Commission yesterday.

Whilst commenting that no approved drawings of the approved site were contained within the application to date, the Commissioner noted that she had had sight of some drawings and she was satisfied with this.

Cormac McAleer, for Save Our Sperrins (SOS) made a submission on candour from Departments and the position of Departments, noting that for the best part of a decade they had been aware that this was a contaminated site, with this even noted in the company’s own consultation reports. Despite the Department being made aware of issues then, and strong and repeated representations being made to DfI, no action was taken.

Commissioner McParland noted that the Water Topic would cover issues including outliers, discharge on-site and NIEA concerns over discharge not complying with 2015 regulations, and that these would be addressed at a later sitting of the inquiry.

The scale of the threat posed to the AONB was noted by another third party objector, with some 122,000 hectares being under prospecting licence by the applicant currently. He felt it strange that Dalradian were picking this protected site only in relation to their planning application, noting again that the P1B Form states that the application is for “gold with associated silver” only, and also referencing the huge volume of peat to be extracted from the area.

Mr. Fegan detailed that under 6.4 of the Planning Act there appears to be disagreement over the extent of policy adherence by the applicant, and that the Council’s Statement of Case should be read in the round, with all submitted and evidenced detail taken on board by the Commission.

Fidelma O’Kane, from SOS, stated that she was amazed that so many of these so-called planning experts seemed to think that planning policy was optional and could be ignored or moulded to suit the applicant’s specific requirements. Their interpretation of policy was queried, and their valuation process was described as a social construct. Again it was pointed out that policy compliance is essential in planning decisions – how could these “experts” even consider deviating from it?

A question was raised from the floor – was the applicant using the PAC to circumvent the Local Development Plan?

Having been aware of, and actively involved in the independent examination process linked to the Local Development Plan, Dalradian had the chance to legally challenge the outcome, but they chose not to.

Questioned on the LDP Waste Management Policy (WM01), Senior Counsel for DfI said that DfI don’t believe the Waste Management Policy applies.

Counsel for FODC responded cautioning that last year, and in relation to the majority of other questions put to them, the Department said they would await direction from the PAC on issues of consternation before taking a firm view, but for some reason they have now. Mr. Fegan queried, if you removed the waste heap from the current site and put it somewhere else, what would you call it? He stated that he believed the Department, and the applicant’s position to be an error of law and a misinterpretation of the policies.

A number of local protectors then spoke on the DfI response to the question, as well as the jagged accusation they had quite remarkedly levied at FODC.

It was noted by legal counsel for SOS that when planning policy is applied or questioned, DfI sat on the fence and repeatedly attempted to pass the buck to the PAC, but in this case, it was our belief, that they had prejudiced the inquiry.

Another local person noted that DfI gave a response and attributed a reason to FODC for their stance was worrying at the very least.

Concerns were raised about the input and the attitude of the DfI representative, and fears were expressed that, as this was the very body charged with making the ultimate decision on the planning application, indeed one comment made was that “the mask of neutrality had slipped”.

It was fair to say that when we went into this process we had reservations about the attitude and the impartiality of the various government departments, but to see the arrogance and partisan attitude on display here was truly shocking – I presume even the Commissioners were taken aback.

When we got back to questions on Waste Management, Commissioner McKeary asked Dalradian if the application involved a waste facility, Michael Gordon responded, “It’s a waste facility for extractive waste” – fairly straightforward you would thought, but he continued claiming that it would be “inappropriate” to apply the waste management policy to it and went on to compare consideration of a toxic waste dump to planning permission for a car park – indeed this theme was followed through by another Dalradian representative, from Gravis Planning, who compared it to the disposal of coffee grounds at a café – breathtaking in both their ignorance and their seemingly lack of understanding of the subject.

The Dalradian representative continued that there was no reference to include mining within the WM01 policy, but as was later pointed out, there was no reference to exclude it either, and as noted yesterday, absence of evidence does not equate to evidence of absence. He said that the sheer volume of waste to be produced from the extractive process was an inhibitor to using another landfill site, but simultaneously claimed that no waste would be removed or transported off-site. Again, when questioned about the make-up of the concentrate that is now being produced, and not the refined gold product, it was pointed out that there is intrinsic waste involved

Timetable Version 3: Because the last one was getting familiar.
Day Eleven

Tiresome Naturally and "No Negative Impacts"?

An observation was made early on that there appeared to be no critical analysis from the Department for Infrastructure on any documentation from the applicant, but that they seem very quick to readily dismiss any documentation proposed by the “third party objectors”, i.e. our local community.

In response to the first question of the day from Commissioner McKeary, in relation to the management of the so-called “community fund”, we were told by Mr. Hunt (Dalradian), that the fund was designed to “promote community benefits, including community cohesion”. What followed was a unanimous response from the community that this was in no way reflective of our experience to date.
The role of the Lord-Lieutenant of County Tyrone, the English King’s representative in the county, and that of his deputies in the distribution of the Tyrone fund was noted, with questions raised surrounding the Crown Estate interest and purpose of the funding – was the intention to silence future concerns about this toxic project?
When DfI refused to answer whether they felt the community fund was a material consideration, once again passing the buck to the Commissioners, Counsel for Save Our Sperrins interjected that the local protectors were finding their supposed “stance of neutrality somewhat tiresome”, and that we were also finding it increasingly hard to believe, given their words and actions. “Surely the Department is tasked with making a decision, and we call on them to do so.”

Silence from the DfI table.

Cormac McAleer from Save Our Sperrins made reference to his years spent working with community funding, cautioning both the Department and the PAC that, “if you want the antithesis of a community fund, or a community cohesion fund, then Dalradian would have already come up with such an example.”

It was again noted that there should have been a core feasibility study, and that contrary to the applicant, the evidence brought to the commission through the local community (in their written submissions previously and oral submissions at the inquiry) are evidence of the failures of the fund, and of the applicant, as opposed to references to vague “bespoke models”, phantom feasibility studies and mystery spreadsheets – what evidence has the applicant actually presented to support their fanciful claims?
This is unfair both to the PAC Commissioners and to the public.
It was also noted that Rather than “promoting community benefits, including community cohesion” it was the belief of the local community that the applicant was attempting to buy a social licence – part of the societal and community rupture, division and upheaval – as per the mining industry playbook. It was not viewed as part of the solution, rather it was part of the problem.

It was pointed out that the Tyrone fund underwent its rebranding in 2020, coincidentally following remarks made in the local Council Chamber by Victor Warrington (Ulster Unionist Party), who has since that time become a voice in the wilderness for Dalradian in terms of promoting their toxic intentions outside his DEA, and indeed his county, and questions were raised in relation to perceived conflicts of interest and potential donations to political parties.

It was again stated that community benefit funds are generally not considered a material planning consideration by courts, as planning permission cannot be bought or sold. According to Supreme Court rulings, for a benefit to be a material consideration, it must serve a proper planning purpose related to the development, rather than offering general community benefits.

The Key Legal Principles include – (1) No “Buying” Permission: Offering money to the community does not make a bad application good; (2) Relationship to Land Use: Benefits must be directly related to the development and its impact on the site, not just a general benefit to the neighbourhood; & (3) Valid vs. Invalid Considerations: A cash donation for something that is not directly impacted by the development usually does not qualify a material consideration.

Dr. Louise Taylor spoke on “Pre-Traumatic Stress” and how this factored into the lives of the local community in the years since the arrival of Dalradian and the announcement of their toxic plans, working through the inquiry process, and how ultimately the “event” – the application and future fund – would lead to Post Traumatic Stress Disorder if approved.

Mr. Hunt for Dalradian claimed there was no evidence of any impact on tourism from the toxic proposal to build a mine, processing plant, 38km of powerlines and mountain of toxic waste in the heart of a designated Area of Outstanding Natural Beauty, using what he later termed “economic logic”, seemingly based on criteria drawn up by the applicant without any questioning or research undertaken with local tourism providers. He reiterated that the tourism effected was defined as an economic effect, and spoke on a differentiation between visitor numbers and tourist numbers within the district.

Countering this speculation, Mr. Fegan (legal counsel for Fermanagh and Omagh District Council) noted that their tourism input was “parasitic” on their other analysis, advising that there were factual disputes in relation to other topics, and that there would be an impact on conclusions and analysis dependent on the commissioners’ findings.
He continued that, amongst other things there was a generalised sensitivity analysis, that the application was fundamentally flawed and contrary to planning policy noting the Doraville judgment as well as the Local Development Plan’s Tourism Policy, notably TOU01 in this instance, and the adverse impact test on a “tourism asset or any part thereof”.
The applicant’s Landscape submission acknowledged adverse impact, and contributions from the applicant’s representatives, it was said, “begs of speculative argument that the applicant has relied upon.”

Mark Tierney, a local angler speaking on behalf of the Ulster Anglers Association noted initiatives undertaken, particularly in relation to children and young people, moving them “away from the X-Box and into the tackle box” and stressed the importance of the Foyle system of which the Owenkillew is a feeder. He spoke of the fact that Salmon numbers are already in decline and how they did not need the threat of pollution from a toxic gold mine and processing plant to further destroy their habitat. He also referenced a PwC report on Angling Tourism which had a projected annual spend of £64m in 2015 and, by his own conservative calculations could be worth as much as £120m annually in 2026, noting that this was a sustainable industry, and an environmentally friendly one. “The Foyle is the jewel in the crown of the North’s angling culture, and we should not be gambling on our health or that of our environment” he concluded.
Following this, Mary Brolly, legal counsel for SOS added, “Whilst noting that the Foyle system, and indeed the wider Sperrins AONB is indeed the jewel in the crown, we take this opportunity to remind the applicant that we prefer a green crown to a gold one.”

Lynda Sullivan for SOS continued, pointing out that the distinction between tourists and visitors was unnecessary and unwelcome, and that local tourism is regenerative, whilst rejecting any attempt by the applicant to reduce the richness of The Sperrins to money spent.

There followed contributions from the audience from a number of local tourism providers, a businessman and local employer, a member of the Greencastle St. Patrick’s Senior Gaelic Football team, who is a new father and new home owner in the area and a mother of two young children, all impacted by this toxic proposal. They spoke how what was being forced onto the community was “genuinely terrifying” and “unbelievable”, noting “multiple threats” not limited to, but including health impacts, fears for the future of their businesses, light pollution, dust/air pollution, noise pollution, unnecessary anxiety and stress, community and family impacts, beauty of the AONB blighted, water pollution, threat of subsidence/sink holes, worries for their own houses, their home places and their business premises as a result of “unknown tunnels” under their feet, the “fear of losing workers to jobs that don’t exist” (referencing Dalradian’s inflated wage propaganda), the psychological impact (both for local families and the impact on people planning holidays – why visit the “toxic/polluted” Sperrins?). An appeal was made, urging the Commission to “consider the long-term consequences” of what was being proposed here.

Cormac McAleer continued, “We live in one of the most beautiful areas in the world – indeed sometimes you have to go away from home just to return and appreciate it.” Despite years of neglect from the Tourist Board, cycling, walking and driving routes are all now proving to be very popular locally. Yet, in spite of all this, DfI Roads now propose to abandon a stretch of the Crockanboy Road from roads traffic to be turned into a haul road. He asked the Commissioners, and those present to visualise that – a haul road, in both directions, whilst active travel and cycling, walking and driving routes were also being promoted, and that the same road was an access road to local tourism providers, including those who spoke today – could they grasp/understand what was at stake here?

The importance of internal tourism was again touched on by Marella Fyffe, Chair of Save Our Sperrins, who noted it’s particular relevance presently and in times of global conflict/crises and seemingly never-ending rising costs. She also referenced the tie-in with the Local Development Plan (LDP) as the Tourism Policy Clarification specifically referenced the “Sustainable tourism industry”, something far removed from the proposals of Dalradian and NIE.

The narrow specification of the NIE submissions, dealing exclusively with the route corridor and not an overview impact on the Sperrins AONB was picked up next, and one local community member spoke on the “postcard from hell” at Cavanacaw and how anyone could argue that this would be a tourism asset was seriously dubious.
Mr. Hunt for Dalradian’s “economic logic” was countered with Dr. Taylor’s (SOS) fear over “sacrifice zones”, and Cavanacaw resident Bill Donnelly advised from personal experience there that trucks are not restricted to haul roads and don’t want to be restricted by them.

An attempt was made by Mr. McAvoy, for Dalradian, to again promote the Tara Mines fiasco, but this was dismissed noting that archaeological sites have “disappeared” within the tailings site, with another, St. Clare’s Well, being enclosed on-site and not accessible to the public. It was also reiterated that, as written and oral submissions to the Commission had clearly evidenced, not everyone in Tara was a supporter of the mines there.
As a follow on to this, Mr. Donnelly spoke how the Felix Kearney Cottage was now in the pit within the Cavanacaw site, “in the moonscape – gone completely”.

Mr. Fegan for FODC spoke of the “Council and wider stakeholder involvement” in plans for The Sperrins and referenced a Tourism NI Visitor Survey/Visitor Attitude Survey which didn’t seem to differentiate between a visitor and a tourist and defined visitor as leisure, overnight and day tripper. He said that TOU01 within the LDP departed from the Strategic Planning Policy Statement (SPPS) in that it was much stricter. Council had justified this departure during independent examination, and it was appropriate and approved at this time. He noted that, despite NIE’s attempt to downplay the footprint of their project for Dalradian (11m poles not “massive”, Mr. Orbison), the “…or any part thereof” meant that this was in contravention to the LDP.

He noted also the first mention by Dalradian (Mr. Hunt) of a “tourism fund” and queried this, as well as supporting the input from various members of the community noting that where the applicant seemed to rely on assertion, the local people had submitted evidence, and that if you introduce a development like this into an area known for its tranquillity, then it is safe to say that this will have an impact.
Further countering the assertions of Mr. Orbison, that an electricity pole ~200m from a holiday let wouldn’t be visible to those holiday makers renting the property, Cormac McAleer stated, “I’m not sure how Mr. Orbison thinks, but people have the habit of looking in different directions, especially when taking in scenic views”. This was echoed in a further response from the property owner who noted that the panoramic views offered by the holiday accommodation would be undoubtedly impacted by this new, visual impediment.

A local mother of two detailed the threats posed by this application, including landscape alteration, pollution risks and industrialisation, and noted how these had a direct impact on tourism strategies which promoted local place, stories and landscape. She spoke of the relevance of regenerative tourism and how, in 2026, “we shouldn’t have to fight for the right to exist in a safe space within The Sperrins AONB”. She continued on the importance of strengthening community led tourism rooted in heritage, well-being and environmental stewardship, which she hoped would be pursued by The Sperrins Partnership, and how a large industrial gold mine sits in direct contradiction to these aims. She also spoke of the real threats posed, as a result of progressing this application, to grant allocation and the worry that funding itself will be difficult to secure for tourism, landscape development, etc. in an area seen as “high risk”. She concluded by pleading with DfC, DfI, DAERA & DfE to exhaust all avenues investigating the detail of the applicant’s proposals, as well as the third-party submissions, before making a judgment which will have such a major impact on the people who ultimately pay their wages.

Nature-based tourism was mentioned as a key theme of local tourism, which had already been acknowledged as being economically important. Again, the lack of reliable/stated information from Dalradian, the fact that they hadn’t taken to issuing any questionnaires (to local accommodation/tourist providers, or to tourists visiting the area) was highlighted. The claim that 322 poles at 10m clearance distances would have no impact to the AONB was also ridiculed further.
The proposed preferred route of the powerlines was also queried at this stage, with a question asking if it was also an attempt by NIE to bring in further wind farm and anaerobic digestor connections at a later date, but this was agreed to be brought back at a later date within the inquiry deeming it not necessarily relevant to tourism.

Mr. Hunt, somewhat incredulously, and in absence of any reported data or evidence, reiterated his belief that “I don’t think there’s a tourism impact” at this stage of proceedings, before conceding that if DfI or the PAC “were to take a different view then it could be mitigated through a tourism fund”. Michael Gordon, for Dalradian, claimed that the TOU01 policy was “so strict that it could be prayed in aid to prevent any development across the AONB”, but as reminded by Mr. Fegan, the LDP had been through independent examination and Commissioner O’Neill had found squarely against Dalradian on these same issues at that time.

When questioned on the road abandonment, and it’s use for leisure/recreational activities, Mr. Fegan responding for FODC said the council had to rely on the evidence of others, namely the third-party objectors (us) and that the Council had nothing further to add on this matter.

There followed a question from Commissioner McKeary for Mid Ulster District Council, but they had no representation present so it was proposed that this would be repeated at the “Lighting Day” when they were scheduled to be present, and Commissioner Donaghey for NIE on the research carried out in relation to the visual impact, but Mr. Orbison claimed that their expert witness wasn’t in attendance and requested that this be moved to the Landscape Topic.

Questions then followed on proposals made to financially mitigate the proposal, with it being noted as a matter of on-going concern for the local community that whilst planning conditions, in the words of Bill Donnelly “as we know them are not fit for purpose at a toxic mine”, any proposed Section 76 agreement featuring the trio of DfI, Dalradian and the Crown Estate, required an independent or third party representation, and potentially FODC sign up as well. DfI have repeatedly shown that they are uninterested and ill-equipped to deal with the specifics of monitoring and enforcing against the applicant to date, and have openly acknowledged that they do not have the knowledge or resources specific to this toxic industry, whilst both Dalradian and the Crown Estate have a financial interest in the project and their commitment to scrutiny can be questioned.

As was noted by legal counsel for SOS, to date environmental protectors have been the ones who have been forced to monitor and highlight issues to the Departments.

The day concluded with a brief discussion of the timetable (dates causing concern for FODC, NIE and Dalradian representatives), before we were advised that there would be further discussion on the timetable in the morning, and the Commissioners agreed to accept two documents referenced by protectors at yesterday’s sitting, namely the Commonwealth Model Mining Feasibility Study Guidelines (2026) and the International Association for Impact Assessment journal.

The Strule Arts - Home of the Public Inquiry
Day Ten

Deep Concern Over Mine Waste, Bonding and Community Safety

The day began with a brief discussion on availability of statutory bodies, expert witnesses and third parties for additional days being added to the inquiry late June/ early July.Discussions moved onto the appropriateness of the use of a Section 76 a

greement as a bond mechanism to deal with mine closure/ site restoration / address possible pollution instances should the applicant be unwilling to address any arising matters.  The Applicant had developed a draft Head of Terms & included this in their Rebuttal submission – proposing a bond of £20,024,144 for the project.  Amount to be agreed between three parties to the agreement: Dalradian, DfI and Crown Estates.  DfI noted that third party experts from Valuation Office would be involved in setting bond value, with bond agreement needed in order for planning permission to be granted. 

 

Commissioner McKeary quizzed DfI Barrister Mr McKay on the implications of accessing these funds, if there was a difference of view on a pollution incident, teasing out that a court injunction could be needed to stop mine activity on the scenario posed.

 

Mr Merry (acting for DGL) noted that the applicant does not accept that there is potential for catastrophic failure, so no allowance has been made for this, referencing a 20% uplift on a parameter within an unseen cost model for unplanned closure as their tolerance facility.

Third party objectors considered the bond amount wholly inadequate.   SOS noted that the Dry Stack is a marketing term created by the applicant for a mine waste dump that represents an eternal risk to the Greencastle community & primary school.  Who will protect our children, our people, our animals, the fish in our rivers & fresh water pearl mussels?

 

Objectors again highlighted the presence of acid mine drainage known to be on site at Curraghinalt and the need for monitoring in perpetuity in relation to this and the Mine Waste tailings facility.  Mr Merry (DGL) noted the applicant considered the waste dump would be a stable land form 15years post closure, designed for a 1:10,000 year flood event.  Objectors referenced the restoration works at Curraghinalt to date for the expired Planning approval which is now unlawful, noting this as inefficient, incompetent and unfit for purpose. 

 

All third parties expressed concern at the open-ended nature of the bond discussions and no realistic figure in place to reflect the severe risk this project represents to our environment and people, citing examples of mine failures using the same technology around the world (classed as catastrophic events).  Liability of the developer beyond the closure bond also queried but unanswered.  References to the use of standard clauses within S76 agreement by the Applicant, queried by Protestors on a non-standard application before the Commission.

 

SOS representative noted Mine Waste facilities as per that proposed by Applicant have a failure rate of 50% over a century and 100% over several centuries, citing reporting from Dr Emermann & Dr Vicks (Specialists in the field).  This was followed with questions:  What is the impact on future generations?  Surely for such a high risk proposal an S76 is completely inadequate – is mine failure an uninsurable risk?

 

Another SOS representative noted a December 2025 publication referencing US Forestry service reports on failure models & effects analysis on mining, which stated ‘tailings facilities require perpetual maintenance … natural processes that drive risk always present.. only solution is to maintain site care & maintenance forever.’  Post closure obligations may last much longer than mining company has allowed for.

 

Another third party objector noted the S76 is a planning tool, not a mine security regime; highlighting a material doubt how this could be used for mitigation, with an obvious lag between the risk cover held & the real liability, the public are excluded from enforcement/ no third party rights if DfI reduces bond level or refuses to enforce.  Parties also released from their responsibilities should they part with their land ownership i.e. sell on.  Bond is an agreement to pay a sum, rather than having the fund in hand readily available to deal with a disaster/ no holding money serious contention – risk of bankruptcy etc.  Any bond that does not fully consider inherent risks in project deemed inadequate by third parties.

 

Dr Garvey (SOS) referenced two mining projects involving the same engineering teams (SRK, SLR) one of which suffered a tailings failure & the other suspended due to inadequacy of environmental information.

 

A third party objector noted the £20m bond was pittance in relation to the proposed value of the project discussed previously, noting this to be 0.1-0.6% of GVA figures discussed last week.  Highly concerning that failure and appropriate plans have not been considered, which he considered insulting to the community.

 

Dr Taylor (SOS) likened the lack of consideration of catastrophic failure to the Titanic, thought to be an unsinkable ship prior to its maiden voyage; highlighting the real dangers, health & safety risks and fatalities in this industry in recent years. 

 

FODC are not party to S76 agreement and cannot be.  Mr Fegan noted that the relevant authority is DfI with the application made directly to DfI, reiterating that as a regionally significant application DfI to take lead on enforcement.

 

Discussion on impact on agriculture proposal would have if permitted, which applicant had limited to lost agricultural land on the mine waste stack/ project site.  Mr Beattie (Counsel for DGL) noted pathways & receptors debate to follow on water ecology days but without wishing to inflame room, applicant doesn’t accept there are issues.  Commissioner McKeary asked if any economic value had been attributed to this, with Mr Hunt (DGL) responding ‘there is no pathway to effect, therefore it doesn’t feature in the economic model’.

 

Third party objectors challenged this – noting it was more than just the mine site impacted by these proposals.  Removal of peatland from mine site, could release contaminants stored within peat.  Local farmer Paul Hollywood spoke out against the proposal, noting he was a dairy farmer in the area immediately beside the proposed mine for 72 years, with two sons building houses in the adjacent area & his concerns for the future of the farm and health of his family/ animals. 

 

Lynda Sullivan (SOS) referenced living in Cajamarca, Peru for 5years and shared her lived experience of massive farming impact by a Newmont mine (US Company), naming a local farmer who lost 20 healthy cattle who died after drinking from a stream coming out of a goldmine there.  Nobody wanted to buy dairy produce from the area as a result of mining there.

 

Sean Clark, local resident/ farmer read out a statement on behalf of Pat McCullagh, a local farmer who owns land which the application site borders.  This noted he had never been contacted by DGL despite seeing his land shown within red & blue line boundaries contained within the application.  He noted his objection to the proposal, never permitting the applicant on his lands, and concerns on the impact of continuous blasting would have on his farm and animals and local wildlife & fear that the area could face a disaster similar to Aberfan in 1986 should the proposal be permitted. 

 

SOS Chair Marell Fyffe shared powerful testimony from Pat & Nuala Gheoghegan and their experience living 5 miles from a mine waste/ tailings stack in Co.Limerick (Aughinish Alumina Refinery).  In the 1980’s they noticed cattle were not thriving, cows were lost, animals becoming sick and dying too young.  People spoke of dust on grass, health problems crept in over time.  Pat & Nuala both suffered strokes & heart attacks, developed breathing difficulties (having been previously healthy), their children have rare disease and learning difficulties.  Nuala herself had four miscarriages.  All their cattle (previously healthy) miscarried.  The issue is the storage of vast amounts of industrial waster and mixtures of noxious chemical.  Over time waste is exposed to wind or rain and settles as fine dust on grass or soil, washing into rivers and moving well beyond the boundaries of the site.  In the end, Pat & Nuala had to leave their home to protect their health, 28 other farmers in the area have also moved on to do something else.

 

A member of the public shared concerns on the wider impact on agriculture this project could have if permitted, noting the Balmoral Show was starting shortly as a showcase of our agricultural standards/ outputs, linking this to the high quality food produce produced in NI and how this is sought after at present – is this now at stake?

 

FODC Counsel Mr Fegan noted that the area affected by the proposal was much wider than the limited site infrastructure/ waste stack extents highlighted by the applicant.  Noting a comment on a previous sitting by DGL Economist Mr Hunt, setting a challenge to find identify a negative economic impact – Mr Fegan stated there is some negative economic impact.  There will be some downsides or at the very least potential downsides, which must be recognised for the purpose of balance.

 

Dr Chris O’Connell, Policy advisor at international charity Trocaire, shared SOS & third party concerns highlighting issues encountered with mining in Central America (Guatemala & Honduras), many of them run by Canadian Mining Companies, since Trocaire becoming involved the region in 1973.  Dr O’Connell described impacts on ‘food security’, noting water security, water pollution, extinction/ migration of plants, animal & wildlife; seismic activities disturbing sub-soil, air pollution issues, tunnels dug under fields leading to sink holes, drainage to properties – citing 10 freshwater springs documented as drying up since a mine opened (Marlin Mine, Guatemala), with cumulative negative effects leading to out-migration and displacement.

 

Local mother Carol Glass shared her health concerns for her daughters should the mine proceed, one aged 20 with severe asthma and another daughter with Autism, ADD and the impact of living beside this toxic industry.  Are sink holes a concern?

 

SOS noted a Nestle representation at previous planning commission hearing on the Cavanacaw Mine some time ago in Omagh, where the company who made dried milk for export said they would not be able to sell their product on the international market due to the contamination risk from heavy metals and dust should permission be granted.  Permission was granted in that instance & the factory closed down.

 

Local disability activist Dermot Devlin (my way access) noted health conditions he faced to maintain his respiratory function and the severe risk this project poses to his health after spending years lobbying for access to medication that has improved his quality of life – airborne contamination is a serious risk to him & others with respiratory illnesses living in the area.

 

Third party objectors queried why DfI had not undertaken a baseline agricultural study of the area and noted that no analysis of the 44,000 tonnes of ammonium nitrate explosives has taken place to date which is a fundamental issue.  Farmers are asked to limit their usage of both ammonia and nitrates – the impact of these chemicals from blasting on land, spreading on fields & airborne particles has not been considered. DGL have not produced a proper agricultural assessment, it is narrowed to consider the proposed site in isolation when the reality is the whole local farming area/ network will be impacted.

 

DGL supporters invited contributions from a retired mining engineer from Tara Mines (Mr Kelly) and Geoscience Ireland, an industry representative body (Mr Finlay) who spoke in favour of the proposal and their positive experience at Tara Mines.  Third parties refuted many of their comments.

 

Discussion on turbary rights held on the proposed mine site followed, with no agreement reached.  Affected third parties invited to challenge legally to assert these.

 

Mr Buroni (DGL) was invited to comment on the applications perceived risk to mental health and community cohesion.  His contribution highlighted a complete absence of any lived experience & was based on a desk-top study carried out from England.  Assertions that hazards were being confused to infer risk, receptors not identified, no clinical mental health impact was present and that stress/ anxiety through the planning application could be addressed through consultation which was viewed as central to the process from the outset – were repeatedly challenged by third party objectors & FODC.

 

SOS noted credible death threats to three local people standing against the proposal delivered by the PSNI, violent episodes/ encounters objectors faced, threatening phone calls, harassment, sexually explicit calls, online trolling/ abuse faced by land protectors over more than a decade due to this mine application which has divided the local community.  Many people in the area are suffering from stress, anxiety, not sleeping or on medication due to these conditions as a result of this application.  The lack of communication / consultation was highlighted in the submittal by the local primary school in their statement of case.

 

SOS solicitor Mary Brolly noted the receptors are the local people who experience the harassment, trauma, sleepless nights trying to protect their area and the health of their families.  For many people it is in the mind, all of the time, from getting up in the morning to going to bed at night.  FODC Barrister Mr Fegan noted that a Public Health Agency within SoC submittals dated 23/11/20, noted the PHA were aware of a great deal of anxiety & distress in the local community over this project – which was material evidence.  Mr Fegan also cited the Dorville inquiry where the Commissioner decided the perception of fear associated with the application to be a material consideration.

 

A third party objector noted it is not the fear of the unknown, but the fear of the known, referencing the documented mine waste failures raised over the course of the inquiry by objectors.  The more knowledge people have about the effects of mining, the more fear & anxiety increases.  The community have a lot of knowledge about mining because they have taken it upon themselves to check & double check, in the absence of a pro-active Department which has the statutory duty.  Instead there has been a passive approach which only increases the anxiety over any future oversight and enforcement should the application be permitted.

 

Dr O’Connell noted 6,300 attacks on environmental defenders since 2015, noting 2,200 people killed or disappeared 2012-2014.  These statistics reflect global tendencies, with mining and extractive industries the most dangerous areas.  ‘Violence is a shadow that follows mining around the world’.

 

DfI were asked to advise how the DGL Community Fund is weighed in the Planning Balance?  DfI through their legal counsel Mr Elvin, evaded comment, stating to the Commissioners ‘if you think it is a material consideration then we can take it into consideration, which is not to say they can’t be offered but not influence any decision’.  When pressed to give a definitive answer the response came ‘we’re not deciding it at this stage are we?’.

 

SOS sought to introduce a new document to the inquiry: Commonwealth Model for Mining Feasibility Guidelines (January 2026) DGL & DfI legal teams to consider overnight.  Social Impact Assessment Information by International Association for Impact Assessment also to be considered – publication date may be used to justify its refusal on inclusion – tbc.

 

Discussions on timetabling were then re-introduced:

Transport now scheduled for 18th-19th May, with Road Abandonment Order to follow 20th-21st May.    Landscape has now been moved to 26th, 27th & 28th May, with Cultural Heritage to run 2nd– 4th June and residential amenity 16th June to 1st July on dates previously proposed.  Updated programme for these topics to be on PAC website this week.

 

No further detail given on PAC’s intention to run remainder of topics later in 2026 or in the next financial year (April 2027) to suit third parties who are using all of their holiday leave to attend and contribute to the public inquiry.  The extension to the timeframe is a barrier to participation and may exclude people from attending.  Inclusion should be prioritised. 

 

Commissioner McPharland noted that third parties repeating points raised by others was causing delay to the timetable.  We wish to note that the third parties do not share this view. 

 

It is our view that the inquiry has been delayed firstly due to the inadequate information being provided by the applicant (DGL); secondly due to the failure of the Department DfI to meaningfully assess the information before it & then prematurely instructing the PAC to proceed with this inquiry; thirdly the lack of a video record or transcript of the proceedings to ensure all points are captured & indeed the commissioners being tasked with their own note taking as well as directing & chairing proceedings; fourthly the decision to accept late information by NIEA (on day 2 of PI after refusing in writing on multiple occasions in advance of the inquiry sitting) & DGL (under the guise of transboundary submissions but unrelated to this) and the decision to allow additional oral testimony into the inquiry as a consequence of this; fifthly, the programming decision to use some of the first 3days of the reconvened inquiry under strategic matters to recover questions asked & answered when the inquiry originally sat in January 2025 and sixthly; unrealistic time allowances within the programme set:  when commissioners advised participants on level of questions they had generated in relation to topics (such as economics 150 questions) it was evident that there was no realistic way these could be covered in the original time allocated.

Just helping Mr Anderson remember the people he came to consult.The "wellie-wearing sheep farmers" have been doing their homework.
Day Nine

Dfi Department for Incompetence

Today started with a question on profit distribution, and ultimately where the profits from the proposed works would go.
 
Mr. Hunt advised that the profits would go to the company (in this case Dalradian Gold Ltd.), and that what happens with the profits is not of material concern. He also claimed that the company  had “made certain commitments”, when pressed further on this by Commissioner McKeary it turns out what he was talking about was their “community fund”.
 
Interjecting for Fermanagh and Omagh District Council, Mr. Fegan advised that the concern was more so on the use of the profit, and where the profit goes that matters hereMr. Hunt spoke again of the 25% corporation tax (for the exchequer in London) and the 4% (pre-tax profit) payable to the Crown Estate, which it was confirmed would be paid on the concentrate and not the refined gold previously noted by the company in their application.

In response to this it was noted by the local environmental protectors that the duty is on the Government/Statutory Bodies and it was obvious that there had been a lack of due diligence in relation to this application. It was also claimed that rather than arriving here in 2009, as previously believed, this company, under various guises, has actually been operating here since the 1970s. There was continued discussion on the optimism bias shown to the applicant by DfI, and the negligence the Department has shown repeatedly in relation to this application.

Speaking further on due diligence concerns, legal counsel for Save Our Sperrins noted that “gold laundering” has been identified as a “key concern” for the British Government. In November 2023 the UK National Crime Agency (NCA) issued a Red Alert entitled ‘Gold-based Financial and Trade Sanctions Circumvention’ with the aim of promoting its’ awareness.  It highlights the role of due diligence and that enablers often seek to obstruct other parties from carrying out necessary due diligence.

The NCA, the Royal United Services Institute (based in Whitehall) and the Financial Action Task Force (FATF) all provide useful indicators or ‘red flags’ that predicate this gold laundering. These include, for example, changes to business names of entities registered to deal with gold, the registration of a trading company in a tax haven even though its business relates to another jurisdiction and the use of a corporate structure of shell companies located across various locations, etc. In their December 4th 2025 policy brief document ‘Illicit flows of gold concentrates in the maritime space’ a key message from the Organisation for Economic Co-operation and Development (OECD) is that the global trade in gold concentrates – unrefined gold in containerised bulk bags – is exposed to distinct vulnerabilities that can be exploited for gold laundering and gold-based money laundering. They further advise policymakers to establish and enforce more rigorous licensing and monitoring of initial processing plants’, traders’, and smelters’ traceability. It was asked if, in regard to any prospective gold mining operation anywhere here, does DfI/Department for the Economy , or any ExecutiveDepartment, currently have in place any arrangements to counter gold laundering as it currently deprives public revenues of £billions each year all over the world?

Or do they have they any plans to consult with the NCA, RUSI, FATF or the OECD in this regard?

That level of scrutiny is not usual was the response from DfI.

In relation to a question on carbon off-setting, Mr. Burgess for FODC noted that this only applies if emissions are fully offset, and that the concern is whether there remain net emissions. In dealing with net emissions there is no double counting. Costs have been budgeted to offset a certain level of emissions as the applicant believes to be the case, but the experts acting for FODC believe the figures to be much higher. The Green Book prices a tonne of CO2 at £299, with the projections from the applicant that over the course of their plans they would emit 600,000 kilo tonnes of CO2 and pay $14m to “offset” this. When questioned further on this plan, Mr. Hunt confirmed that should they exceed their projected emissions, they would just seek to spend more money to cover this. As one local protector put it, they can just destroy the entire Sperrins AONB and claim they’ll just pay it off.

On the topic of policing costs, legal counsel for DfI noted that “DfI hasn’t considered this to date”, but “I think it will be considered”.

The question of whether it was a material consideration was avoided by the Department, preferring that the PAC ultimately advise them what to do. Mr. McKay went on to confirm that there were no specific statutory consultees to be consulted in relation to this.

Legal Counsel for Dalradian, Mr. Beattie gave us the “conservative figure” of 44,000 tonnes of explosives to be used over the life of the mine.

When asked by Commissioner McKeary whether police would be required as part of the application, he said he was unsure, that it would be an operational matter for the Police Service to decide, but that any explosive escorts would only be “to the gate” of the Dalradian compound.

Mr. Burgess, for FODC, claimed in relation to Public Revenue, that there was no basis on which he could attempt to quantify what the police bill would be, and that there was no correlation between corporation tax paid and the police budget. Mr. Fegan noted that if it is accepted that any benefit to public funds is material, then evidently any draw upon public funds must likewise be a material consideration in any economic discussion.

The figure of the unpaid £437,000 bill for 10 months of two explosions a month during exploration was noted as a reference point which could allow figures be extrapolated for future plans, and as noted we are not now talking about two explosions a day, rather Dalradian have talk about two blasting periods a day, leaving us with unanswered and potentially massive expenses to the public purse which have been completely unaccounted for/ignored by the applicant. It was again queried why neither the PSNI nor the Department of Justice had been required to attend this inquiry given this expense and these unanswered questions.

As well as the various potential costs quoted, the need for police to remain on-site to deal with the explosives, the multiple licence requirements on the applicant to legally deal with the volume of explosives required, the money already wasted by the PSNI in withholding information from the public and the Information Commissioner’s Office (ICO) the reality of the additional costs that would be incurred as a result of public protest and demonstrations should this application somehow be approved had to be considered.

An earlier claim from legal counsel that the applicant would be willing to pay for policing costs was put again by the commissioner, this time the response was that they would not be willing to enter a Section 76 agreement to cover such costs associated with their own business model.

After lunch it was onto Mine Closure, with Mr. Walker (DfI) claiming that the most likely way to deal with a bond would be a Section 76 agreement between DfI, the Crown Estate and the applicant, although he was unsure of the detail of what a bond actually was – something he shared with the Department’s Legal Counsel, quite shockingly.

When FODC were asked if they knew what a bond was, Mr. Fegan was more confident in responding and referenced both MIN02 in the Local Development Plan and a Supplementary Planning Guidance (SPG) paper from April 2025 titled ‘Minerals Financial Guarantees’.

Bill Donnelly, who has lived experience beside the Cavanacaw mine spoke on the issue of acid mine drainage, noting that this is a problem in perpetuity and not something that can conceivably be dealt with given the short time frames indicated by the applicant for post closure monitoring to date. He questioned what happens 50 years post closure, when Dalradian are gone and their profits are spent – who pays for any pollution instances discovered then?

Speakers for SOS continued, noted that we are not aware of any mine waste facility that has been effective in perpetuity, questioning if the waste site was insurable and noting that the amount of bond was “catastrophically short of what is required”. The Environmental Protection Agency (EPA) has identified 27 abandoned mines in the South that still pose a risk to the environment and human health, four of which have operated and closed under modern legislation. The cost to the Government of Ireland in relation to taking on these abandoned mines is approx. €100m to date. The contamination and pollution continue long after the mining companies disappear. The waste will remain toxic and will remain in the Sperrins AONB long after 5 or 15 years.

Mr. Donnelly returned to comment that he had been unaware that acid mine drainage was already discovered at the Dalradian site, noting that when this occurs the potential of it re-occurring on-site further down the line was extremely likely, and that this will ultimately mean that the application will be in contravention of the Habitats Regulations.

Another question was asked in relation to the value of the bond, and how this was decided – was this a majority or a consensus decision between the three parties?

The day concluded with a proposal and a review of the inquiry timetable which ultimately leaves a number of key topics without dates at present, and contrary to the idea that the purpose of the inquiry is for everybody to have their views heard (Commissioner McParland, 23-Apr-2026), now leaves many of us unsure as to what we will/will not be able to attend or actively participate in for the remainder of this process. We appreciate that this is through no fault of the PAC/WAC Commission, rather fault lies firmly at the doors of the applicant (for failing to provide sufficient and timely details on their entire proposal) and the Department for Infrastructure for pushing this through to the inquiry stage with such obvious and gaping holes evident to even the most casual of bystanders. That the commissioners themselves are noting that they will have to ensure that they have the resources to run it make it all the more concerning – maybe we’ll be back in the new financial year, which would suit many of us requiring annual leave to attend.

We await, with interest, what next week will bring.

Huge thanks again to all who have participated in, spoken out at, or sent solidarity to date, it is hugely appreciated and valued by our entire community.

First of many changes of timetable
Day Eight

Exactly who and what is this application for?

This morning started with a query about a potential conflict of interest involving legal representation for the various departments, and a plea that “𝘑𝘶𝘴𝘵𝘪𝘤𝘦 𝘮𝘶𝘴𝘵 𝘯𝘰𝘵 𝘰𝘯𝘭𝘺 𝘣𝘦 𝘥𝘰𝘯𝘦, 𝘣𝘶𝘵 𝘮𝘶𝘴𝘵 𝘢𝘭𝘴𝘰 𝘣𝘦 𝘴𝘦𝘦𝘯 𝘵𝘰 𝘣𝘦 𝘥𝘰𝘯𝘦”.

Mr. Hunt was then questioned on use of the median as opposed to the mean wage being promoted by Dalradian. He claimed that the median wage they would offer would be £42,000, so despite the money spent promoting a wage of £45,000, it turns out that less than 50% of their employees would be earning this amount, with five roles being paid less than £25,000 per year.

Questions were then raised about Wheaton, from the millions owed to them to the greatly reduced gold spot price they were owed, to the fact that they now, due to a number of charges outlined, seemingly control everything and Dalradian own nothing, and are indeed restricted without Wheaton’s consent.

It was pointed out that all previous projections were based on refined gold, but the fact that ownership of the concentrate now ends at the site gates, none of these costs have been factored into consideration seemingly by either Dalradian or the Department for Infrastructure.

The restoration deposit of £620,000+ was next to be discussed. According to DLG’s filleted Financial Statement of December 31, 2024, this deposit or bond in this ‘reserve account’ is now £390,000 – an apparent reduction of approx. 37%. Does this mean that the security for reclamation is being treated as an asset rather than a cost in the economic modelling of Dalradian?

Supplementary to the 4% royalty that will be payable to the Crown Estate Commissioners, a separate royalty agreement states that a 2% smelter return royalty is payable by Dalradian to Minco PLC, with further questions being raised in relation to the impact of these seemingly questionable financial movements.

Indeed, phrases such as “inhouse Ponzi scheme” and “creative accounting” were mentioned more than once as the day progressed, with questionable tactics employed by numerous actors in the mining industry being red flagged as a template for what could happen in The Sperrins AONB.

Legal Counsel for Dalradian attempted to suggest that, contrary to the arguments put forward, and the lived experience of the local community, Departmental conditions cannot be removed easily, however recent history has taught us all that this is not the case, and both he and the Commissioners were ably reminded as much.

Questions were put to DfI Economics Branch (EB) by Legal Counsel for Save Our Sperrins that with the significant public funding the applicant has benefitted from it was queried whether there has been any protection to public expenditure investigated or put into practice – what checks and balances have DfI (EB) put in place to protect or secure public funds?

A further question was asked seeking clarification on how Dalradian anticipate how every £1 raised in profit will be distributed, noting as disclosed to date:

  • 4p to Crown;
  • 2p to Minco;
  • 22p to London as Corporation Tax;
  • 10p to HMRC and Exchequer in London for National Insurance/PAYE?
  • How much to Wheaton?

Clarification on the status of the tax liability given that Orion Mine Finance II is a limited partnership registered in the Cayman Islands was also sought.

The “optimism bias” being afforded to Dalradian by DfI when they were being “walked through” and “made feel comfortable” was raised.

When Commissioner McKeary put the question to Ms. Thompson from DfI EB, “Were you aware of these charges?”, her response was, “No. There was no reference to them.”

Wheaton, it was noted, are not mentioned in the documentation.

When this was put to Mr. Hunt he claimed the money was “an equity and risk sharing investment, not a loan” and that in the hierarchy Wheaton “sit above the shareholders”.

Commissioner McKeary asked, “Why was that payment never mentioned?”

Mr. Hunt’s response was that, “It comes out of post-tax profits” and that Dalradian Resources (the parent company) have to repay them in gold, but that the “gold payments to Wheaton can come from anywhere.”

He continued that the smelter cost had “been bought out” which raised the logical question, if they have paid the smelter cost then surely they know the destination the concentrate is to be forwarded to for processing?

Cormac McAleer then raised the issue of who the actual parent company really was, noting that there is a company based in Canada, but another one (the real parent company?) based in Delaware in the US. If profits are taxed in the country of production, what affect does this have on the figures quoted by the applicant to date, and what impact does the production of concentrate (of different metals) as opposed to that of refined gold have on the figures presented?

“We are lay people with a conscience” he said, and this muddying of the waters only adds to the confusion and difficulty in trying to decipher who we’re dealing with and what is before us.

Counsel for SOS, Mary Brolly, picked up on this point – “We are lay people with a conscience. We are lay people with experience – experience of how this company has operated to date”. She also commented on the lack of respect shown to the Commission by both the applicant and by DfI as the lead department in putting this inquiry to the Commission as it stands.

Further questions from the local community were raised including:

  • 18% “of” as opposed to 18% “off” the spot price;
  • Due diligence failures from DfI;
  • Increased costs (the 82% “lost” to Wheaton) lead to less profit which will ultimately lead to less tax payable;
  • Wheaton’s place in the event of administration/liquidation;
  • Tax paid on the value of the concentrate Vs. on refined gold.

Counsel for Fermanagh and Omagh District Council interjected in response to a claim from Mr. Hunt that the matter being discussed was not really a planning matter, noting that the bulk of the profits will be repatriated and the benefit will not be felt locally, and that what had been debated was actually a material consideration.

It was again put to DfI that there was a failure in relation to due diligence and indeed that they should have ensured that, amongst other things, that money laundering regulation compliance had been satisfied. In response to further questions, DfI confirmed that they had not sought the aid of forensic accountants or auditors in relation to the application, despite previous assertions that this was one of the higher level statements that DfI had completed.

This perceived negligence and failure to act by DfI was further called out by another local, who stated that the department was more concerned with progressing the application than they were with meeting their own statutory regulations. Given the controversial and complex nature of the application, and what is known about the mining industry globally, it would be entirely reasonable to expect auditors or forensic accountants to be employed in this instance.

Dalradian’s inflated claims of “jobs for the locals” was next to be critiqued, with Mr. Hunt acknowledging that ultimately the applicant would have to comply with relevant legislation and could not discriminate when it came to recruitment.

Talk of local courses was quickly dismissed, indeed local opposition was much more apparent with issues surrounding Section 75 of the NI Act 1998 and Employment Rights (NI) Order 1996 debunking the PR fantasy the company would wish us believe.

Mr. Burgess, the FODC Economist noted that the Dalradian document lacked the specific detail required to back up their assertions and explained that every single example he had experience of had fallen short, “in many cases well short of claims made” by the applicant in advance.

He went on to detail how the claimed “uplift is a bit of a stretch, to say the least” and noted that when in operation such companies tend not to care who their workers are or where they are from, furthermore they won’t wait for potential employees when “off the shelf options are available”.

Both Cavanacaw and Tara Mines were then presented as lived examples of the reality of the mining industry, with Cavanacaw having to get dispensation to recruit globally and the lack of job security or safety noted in relation to both it and Tara. These are insecure jobs with high health and safety risks. Are they sustainable, secure or safe? Clearly not.

As one person put it, “the demand isn’t there, the people aren’t there, and very soon the jobs won’t be there.”

Mr. Merry for Dalradian then came to the table to explain that a 5-6 year job represented a “long-term” job. He went on to say that some of the jobs would only exist in the early years, jobs would “tail away” in later years and some elements of employment will “fall away”.

In spite of allegedly removing cyanide and moving to automation, the applicant still presented figures from 2017 to support their jobs claims, and said that processing on-site would continue for one month post-closure.

Mr. Merry mentioned staff remaining on-site to “deal with erosion issues” (presumably he means subsidence?) – people of the Sperrins Region beware!!

In relation to questions raised before lunch, Mr. Beattie and Mr. Hunt (Dalradian) came back to Commissioner McKeary to state that “Minco was an exploration company and not smelting company”, and that “net smelter return royalty was a term of art”…

Their contribution seemed only to confuse the discussion further, with the Commissioners needing a moment to attempt to grasp what was being said.

Further questions came from the local community:

  • How can the Crown Estate be paid a net smelter royalty when Dalradian are selling concentrate at the gate?
  • Is the cost of the Minco acquisition being offset as another loan, cost or debt?
  • If they’ve purchased Minco have they bought the associated pollution and risk, mindful of the polluter pays principle?
  • Can we have some clarity on who we’re dealing with when the applicant speaks – Dalradian (DGL/Dalradian Resources/Dalradian Ontario/Dalradian Delaware), or Wheaton Precious Minerals International, or Orion Mine Finance?

In the midst of all this the Dalradian representatives conceded that it “isn’t a significantly detailed closure plan” and again referenced their seven-year rates holiday.

Mr. Burgess re-iterated a point he had made previously, that although the UK Exchequer may benefit, there is no guarantee it will come back to the North, never mind to FODC. The same was true of the rates payments, which could be prioritised or redistributed elsewhere.

Indeed, even if the applicant had “a bumper year” this would have no impact on local benefit, and ultimately the UK Government could decide instead to spend the money on “defence”.

When it was queried if the applicant had factored in reunification of the island of Ireland and the impact this could have on, amongst other things, corporation tax, legal counsel ruled this out as something that wasn’t entertained by Dalradian.

Mr. Hunt said that “assessing this on the benefit of what do I get back is just the wrong framing”.

A member of the community spoke about this notion of “sacrifice for the UK pot” and how no place or community should be expected to entertain toxic gold mining or the associated pollution in perpetuity.

Instead the costs accrued to date and those we face ad infinitum should be considered and the Precautionary Principle had to be applied.

Mr. Fegan, for FODC, countered the Dalradian claims about policy support noting the obvious difference between local and national benefits, with the Local Development Plan referencing “local economy” and “local communities” and SPPS 4.20 again referring to supporting “local communities”, all of which support the council’s position.

Proceedings closed with the announcement that a senior member of the Commission Staff was to be present, or to pass on, further detail on any proposed timetable amendments at tomorrow’s (Thursday 7th May) sitting.

We shall go again then! ✊

Thanks again to all who attended and spoke out for our community today, it is invaluable and truly appreciated.

A Day in the Life of the Inquiry
Day Seven

The Economics Behind the “Mystery Box”

SOS statement at outset: The significant gaps in information within the submission make it impossible to meaningfully assess the application before the PAC on Economic matters and other issues.  We submit that the application is not fit for robust public scrutiny and should  not have been placed before the PAC by DfI.  Regrettably, from the evidence heard over the last few days we also believe that the DfI are not equipped to process this application, to make any independent assessment or to assess the adequacy or otherwise of the information received from the applicant.  We are of the view that its progression before the commission risks undermining the integrity of this process.

FODC Barrister highlighted that Commissioners are repeatedly hearing of two pieces of missing information: feasibility study & economic model/ spreadsheet.  Case law states need for sufficient information to reach an informed judgement on likely significant effects.  Commissioners will have to consider if the absence of information renders the ES deficient and if this makes it impossible to make a recommendation to DfI on the project.  Spreadsheet is perceived as a mystery box unavailable for scrutiny, Mr Hunt for Applicant noted the ‘economic model is updated as the facts change’.

DfI Barrister Mr McKay offered no Departmental view on whether gaps in information has hindered their assessment or that of the objectors/ supporters ‘if the commission thinks there is a deficiency in information this can be dealt with by recommendation,’ in our view continuing their abdication of responsibility in this process.

A third party objector noted that only 1% of the proposed gold output of the mine had been measured, and queried how inferred & indicated quantities were evaluated against risk of not being delivered or found in the projected quantities as part of any DfI scrutiny.  This did not appear to have been considered, with the applicant’s figures being taken at face value.  What if only 20% of inferred resource is extracted – not subject to any sensitivity analysis.

A third party objector noted  the applicant’s technical report summarises perceived economic benefits, not costs – this is not an independent/ robust feasibility study/ economic appraisal.  GVA claims cannot be substantiated.  FODC statement of case also noted the absence of economic local benefit & regional economic benefit.

Commissioner Mc Pharland asked DfI how is GVA considered in the Planning balance, was this a determining factor.  DfI Barrister Mr McKay didn’t know beyond this being a ‘material consideration’ and ‘wouldn’t want to pre-determine any outcome’ by answering this.

FODC barrister Mr Fegan summarised the applicant’s approach that negative effects are outweighed by economic benefit, noting that when considering economic impact on planning balance – the issue is much broader than GVA, which can’t itself be used as a determining factor – a wholesale view of economic impact is necessary and central to this is whether or not the project benefits the local community.  Appropriate weight must be given to positive & negative implications to local communities and the region.  At a later stage, Mr Fegan also noted that economic development regardless of impact was a total misreading of Council Policy documents & Regional planning documents in response to comments by the applicant’s consultants and supporters barrister.

FODC Economist Mr Burgess noted whilst GVA policy objective is about generating wealth, if this is all going overseas it is not the kind of thing policy makers would want.  Policy makers more interested in more productive, more efficient, more innovative solutions – this mine proposal doesn’t fundamentally benefit regional base/ local economy.

Mr Hunt (Applicant’s economist) noted there was no incentive for the applicant to project lower costs as a private company – this was challenged as this could make the mine proposal more attractive to potential investors or indeed buyers if it was sold on to another company.

Third party objectors requested clarity on tax incentives, favourable capital/ fiscal policies that the applicant has benefitted from.  A reference was made to Conroy Gold in south Armagh who reported Capital Allowances of up to 120%, with an objector noting this was not quite as generous as RHI but is still good.  This question was reframed later to query what capital allowances have DGL benefitted from in relation to exploratory costs (as these are public costs) but no answer provided – considered commercially sensitive.

Mr Burgess considered the economic multipliers to have been inflated, he would be “utterly amazed” if these could be achieved.

Applicant’s assertion that 70% of supply chain purchases would be in NI, queried when accepted standard is 45% challenged,  FODC Economist agree with DfI Economics branch not enough evidence to substantiate the 70% figure.  Mr Hunt’s (DGL Economist) justification offered ‘the applicant is best placed to know’.  

Applicant seeking to introduce condition to increase benefits of scheme locally / local spend – commissioner Mc Pharland confirmed planning conditions can only be proposed by DfI.

Mr Burgess noted the project was unlikely to bring economically inactive people into work or similarly people who are unemployed.  Notion of retraining people to required standards considered challenging.  More realistic to consider that  jobs will require people to come in from outside, along with possible negative impacts on existing employers losing skilled people.  Mr Hunt (DGL) noted 80% of the specialised jobs expected to come from outside the area (50% of total on commencement for first three years if scheme permitted, with aim of reducing this to 20% over mine life).  Mr Burgess considered this extremely ambitious and maintained a healthy scepticism, contending the available jobs are likely to be nowhere near the scale projected and of lower value, not the higher/ skilled positions.

Discussion followed on commuting patterns and workers travelling within FODC, with Mr Hunt noting this is not a mine camp, no migrant workers brought to stay on site.  A third party objector noted that DGL CEO Patrick Anderson was previously quoted in the Sunday Business Post (July 2018) seeking a mine camp not a single mine here.

Multiple queries on DGL’s relationship with Wheaton who baled the applicant out when they were in financial difficulty a few years ago.  Stream of gold to be sold at 18% of spot price to as part of debt repayments.  How are debt repayments considered in the financial projections for the concentrate mine now proposed?  All lands leased understood to be transferred to Wheaton until payment returned. 

Inquiry timetable raised for discussion – update on this not yet available.  Commissioner Mc Pharland noted ‘when we are told, you will be told’.  Mr Fegan noted this delayed update could have significant, real & prejudicial implications on how the inquiry proceeds and needs to be dealt with as a matter of urgency.  Applications for adjournment will be considered if we are prejudiced. 

Group talk before going in for the day
Day Six

What the hell happened today, and what happens next?!?

So, the day started off with a list of topics to be “bumped” – Cultural Heritage, Waste Management and Residential Amenity all likely to be pushed to a date no earlier than September 2026, potentially after April 2027 to allow public participation given the ever expanding timeline.

It was noted, given the short-lived inquiry last year, that Department for Infrastructure should have foreseen this and ensured that all information be submitted in a timely manner with everyone allowed time to digest and respond to the detail available. The idea the inquiry now faces moving from 24 days to twice that, or more entails not only a much greater cost to the public purse, but also shows a huge lack of consideration the the local communities being forced into taking unpaid leave, pro bono time, etc. As one man put it, DfI knew that rather than being over ready, the feathers are still on this thing.

Commissioner McParland acknowledged that the purpose of the inquiry was so that “everybody could have their views heard”, however yesterday we heard from representatives for the applicant making unsubstantiated claims that in their view extending the timeline to allow for meaningful public participation was “not reasonable”. Public exclusion from a “public” inquiry was identified as procedural unfairness, which is a more obvious unreasonable constraint.

Discussion then moved onto the discussion around the valuation from Dalradian, and whether details they had provided related to the “refined gold” product, or the concentrate they have now moved to producing. As noted by the London Bullion Market Association, the “price difference between gold concentrate and refined gold that stems from processing costs, smelter deductions, and transportation, typically resulting in concentrate being sold for 54-92% of the final refined market value [the spot price].”

Dalradian claimed that their concentrate would exceed this at 96%, but again failed to demonstrate their working out, all we were told was that it was included somewhere in their ES and that the calculations were included in their bespoke/standard model which was informed by a spreadsheet no one outside of Dalradian has seen.

Commissioner McKeary picked up on figures contained within the ES, which seemed to relate to gold prices (not concentrate) and this was confusingly explained away by Mr. Hunt who said the figures were based on sales of concentrate, despite this not being noted anywhere.

Dr. Cirefice questioned, when the globe’s leading authority on pricing put the range at 54-92%, how are Dalradian managing to 96%, referencing in particular the $20m deal with Wheaton for gold at a lower rate (~18% of the spot price) – had this been modelled anywhere in their projections? No answer received, all people needed to know was that this gold is “high quality”.

Whether they talked this through, or walked it through, this level of detail was not provided to DfI.

When the question on how DfI considered the detail of the applicant’s figures and whether they thought them robust, Economics Branch acknowledged that they “wouldn’t have necessarily delved into that detail”, but Ms. Thompson did note that they raised the reliance on single point estimate.

Mr. McKay advised that GSNI were consulted by the Dept, but it was later noted that there was no evidence on what percentage of data GSNI had seen or verified.

Ms. Thompson further clarified that they didn’t perform any calculations, everything was based on the applicant’s calculations and that EB had advised that “calculations should be treated with caution given we don’t have a range”. She continued, although the GVA may be high, this is not necessarily reflective of the local or regional impacts.

Ms. Thompson stated that Economics Branch had raised issues.

When the Commissioners queried how this could be dealt with, Mr. McKay said “It can be addressed during the course of the inquiry”. As the Commissioners reiterated, Economics Branch have unresolved questions, how can this be dealt with? They also stated that the “inquiry is not the forum to process the application”, which we were relieved to get confirmation on.

The heavy reliance on PR, and multiple PR companies was noted, as was the importance of language used – terms like “dry stack facility” (toxic waste dump), “gold” (concentrate) and quotes from various Departments/Statutory bodies about taking things at face value, scanning non-technical reports, missing/incomplete/absent information, being walked through, made comfortable, etc.

DfI were questioned further on the adequacy of this process – something which does not lie with the PAC, or the “third parties”, but the responsibility lies with DfI to make a decision.

Commissioner McParland raised concerns regarding any new timetable, with the question being posed to Mr. McKay “Can you advise how long should be permitted to digest and respond to the issues now raised?” He was reminded, again, that these are consultees to the Department, not the Commission, and again asked, “How have DfI made the decision to proceed given the concerns raised by Consultees?”

Mr. McKay acknowledged there are “some misunderstandings”, but when questioned directly, again, “How long?”, he replied, “I don’t know. I can take instruction…A time estimate could be provided at the start of each topic”.

Mr. Fegan, representing Fermanagh and Omagh District Council, noted the volume of transboundary submissions made with no opportunity provided to rebut (in writing), this was not something he wanted to see repeated. Moving forward, any future developments should not be an opportunity for applications to be put forward or gaps to be plugged by the applicant.

Commissioner McParland, in response to further discussion, put it to DfI that their failings to date had the “potential to seriously derail the timetable. If the timetable is derailed as a result of DfI inaction there will be serious blowback.”

At that stage we broke early for lunch with DfI advised to make representation/follow up how they advised things proceed, so we left the room expecting phone calls to Minister Liz Kimmins MLA.

When we returned to the auditorium we were shocked by the view taken by DfI in relation to the litany of failures exposed throughout the course of the last two weeks, and the maintenance of this “head in the sand” approach they persist on taking.

Legal Counsel for DfI was supported by same for Northern Ireland Environment Agency/Department of Agriculture, Environment and Rural Affairs and, unsurprisingly, the applicant in taking this view, however the confused explanation from the DfI barrister set the tone for remainder of the afternoon given the importance and impact of the decision being taken.

We finished up for the day, and the week, learning we had covered 23/155 Socio-Economic questions – progress is undoubtedly slow, but as noted throughout the fault that lies with the applicant (for information not submitted/lacking detail/being withdrawn), and with DfI for pushing this to PI stage when it was evidently not ready to be brought.

We meet again on May 5th as we continue with the Socio-Economic topic…we await to see what developments occur between now and then.

Thanks again to all the heroes who have stood with and spoken up for our community during the past fortnight – see you back on the front lines again soon!

Strule Arts Home of the Public Inquiry Spring 2026
Day Five

Missing Information, Confusion, and Questions Over the Inquiry Process

Half a day spent clarifying where we are, what documentation is missing/obsolete/currently relevant, and two more questions covered (of the 150 scheduled for this week).

Initial input from Dalradian’s KC confirming what we already know, that “it’s not a quarry” follows the established pattern of comparisons when it suits (see the MPA & Tara Mines for other recurring examples).

The fear was again raised by Save Our Sperrins, “Are we being asked to complete the application for Dalradian?” when speaking on the obsolete/phantom feasibility study and missing economic detail.

Dr. Strecker noted that although the public are acting in good faith, basic and required information has not been supplied, leading to the process being perceived as “pro forma”.

It was recorded by other locals that the Department of Agriculture, Environment and Rural Affairs/Northern Ireland Environment Agency commissioned Landmark Chambers Report noted that the Dalradian project doesn’t meet conservation objectives and that, as it stands, the planning application would not be successful. Questions remain, however, despite Dalradian referencing this document who has actually had sight of it?

Counsel for Department for Infrastructure claimed that “the Environmental Statement met the minimum standard required” for the inquiry to be called and proceed, and we were advised that any further complaints in relation to this should be forwarded to DfI.
Despite further concerns raised about inadequate economic and environmental information being provided, Mr. McKay stated that “the Department’s position is as it was before”.

Failing to recognise that the process is fundamentally flawed, DfI rejected concerns “for reasons already stated”—no reasons were provided claiming that matters of concern can be raised during the public inquiry process.
As the Commission attempted to explain several times to the DfI representative, this is the inquiry and issues are being raised, but this did not seem to register.

We had a brief recess at this point. It remained unconfirmed whether or not it was the DfI response or attitude which led one of the commissioners to feel physically unwell, but thankfully this pause was temporary and she returned to power through the rest of the day.

Upon resumption, DfI continued to confuse their role and that of the PAC (as has been the case for anyone following correspondence between the two over this whole protracted saga), with the Commissioners having to again remind Counsel for the Department that it is a matter for DfI to assess the information provided to the inquiry.
Mr. McKay continued to state his belief that there was “sufficient information before us to proceed.”

This belief was, unsurprisingly, echoed by the applicant, who protested that they were “entirely content that all of the relevant data is there, all of it!”
Counsel for Dalradian attempted to explain the absence of a feasibility study, stating that the 2018 submission supersedes the 2016 one, yet it doesn’t contain any detailed information.

Counsel for Fermanagh and Omagh District Council spoke next, noting that their Statement of Case raised concerns relating to information adequacy, and that representations disagree with the DfI, viewing submissions as inadequate and the Environmental Statements as deficient—arguably not legally sufficient.
Concerns were raised regarding the omission of detail, and it would be entirely plausible that the PAC determination could cite that the information is deficient or lacking, with Mr. Fegan noting the A5 Interim Report as a case example.

Concerns were also noted by the Commission relating to a Cleaver Fulton Rankin employee submitting representation as an objector, mindful of the unfair advantage this would grant their client, Dalradian.

Dr. Garvey then spoke in detail on the belief that the Dalradian Technical Report—submitted seemingly in place of the withdrawn feasibility study was falsified, misleading and not grounded in science. He noted that all three reports referenced by Dalradian draw on the same information, which is not available to the public or the commission.
The Technical Reports draw on data provided by Dalradian and assumptions on economic benefits based on the 2017 original application, but what is the underlying analysis?

He expressed great concern at the lack of supply chain detail, but greater concern that it seemingly doesn’t know what a supply chain is. As he explained, this is not some small, local trader, but a multinational gold exploration company who are instructed on the highest level of scrutiny at all levels of the supply chain.


He highlighted some of the “absolutely meaningless” statements made, as well as querying why a full cost analysis couldn’t have been provided given they had already made an 8,000 mile round trip to Washington State in 2017.

In the absence of this detail minus the actual product being shipped and where it was going—it is also impossible to calculate the carbon footprint of the proposals before us, meaning all the Dalradian material on the same is completely defunct, with inaccurate claims and misleading figures stated.
A lie is either information being concealed, or information provided that is inaccurate.

As Dr. Garvey noted, the information provided throughout needs to be robust, scientific and informed.
He also quashed claims made about a University of Edinburgh Economics Report which doesn’t actually exist and was never commissioned by the university, despairing that “this can’t be the level of scientific evidence” for such an important process and decision.

DfI Economics Branch were next up for questions, with Michelle Thompson noting meetings between Dalradian and DfI took place from 2016 onwards, although she was only involved from 2024.
When queried about mining specific economics, Ms. Thompson stated that they “tend to limit to our areas of expertise” having acknowledged that “we’re not mining experts.” She said this was one of the higher level statements that DfI had done, yet despite claiming more stringent assessment was applied, she couldn’t outline what was done differently.

She stated that any economist within the civil service wouldn’t have the skill set required to deal with mining specific figures/economics, and the point was made that whilst it may be beyond the skill set, it is not beyond the remit of the Department.

Mr. Burgess for FODC stressed the importance of differentiating between Economic Value (profit for the company/shareholders) and Economic Benefit (to the community/local economy).

Mr. Fegan queried the robustness of approach, noting in relation to the SPPS the complexity of the proposal, impact of development and the stringent level of scrutiny required. “Some harm” has been acknowledged as being an unavoidable outcome of this project, so the question before the PAC is whether the perceived benefits outweigh the harm caused. Scrutiny, therefore, must be of the highest level.

As DfI remained ineffective, we were grateful to Mr. Fegan who pointed out that repeated references by Dalradian of DfI support related to now outdated documentation and that DfI have since reviewed their position Mr. Elvin will have his work cut out for him when he returns.

Questions were then raised about the bespoke engineering model used (and the much lauded spreadsheet), the volatility and inherent risk implicit in such projects, including a 31% fluctuation between the highest and lowest gold price in the last six months.
It was also stressed that there is no Environmental Statement for silver, copper or tellurium, despite all featuring increasingly in reports from the applicant, and that the lower grade of gold now identified on site would lead to increased extraction and waste.

Tara Mines was given as an example where 650 staff were subject to mass layoffs following a drop in market price, with only approximately 400 reemployed. In real planning terms, this application presents not benefits, but risks.

It was also noted that no Breach Assessment has been carried out, which is a mining industry standard—another significant cost which hasn’t been factored.

When one Dalradian “expert” began waxing lyrical about hedges, he was quickly reminded that the hedges in Greencastle are green, not gold.

Mr. Burgess interjected again to acknowledge the fundamental point that although the gold price may have increased recently, that is quite distinct from any perceived benefits to the local economy. He compared the application to candyfloss, noting that whilst the taste may be sweet for some, it is lacking in substance.

He noted that contrary to Dalradian’s claims, the application was contrary to Government policies relating to productivity and foreign direct investment, and reminded those present that any tax revenues raised would be paid to Westminster, who then decide where it goes. As the sums end up in the Treasury in London, it would be logically presumed that, as the north’s population is just under 3% of the total including England, Scotland & Wales, we may receive just under 3% of the total tax paid.

Paul McDermott from FODC noted that Economic Growth must be sustainable and that environmental sustainability had to be recognised as an important factor, not solely economic growth.

Huge thanks to everyone who took time out of their schedules to attend, assist or speak out—it is invaluable to both our community and to the inquiry process.

As discussions continued at the PI, campaigners gathered in Waterford to voice their opposition to the mining proposal.
Day Four

SocioEconomic Matters and an applicant with no economic feasibility study.

Monday morning saw us back at the Strule Arts Centre, Omagh for Week 2 and Day Four of the inquiry into Dalradian’s plans to destroy the Sperrins AONB.

The morning began with a number of objections being raised in relation to the process and fairness thereof.
In response, Commissioner McParland confirmed that “in terms of the applicant, and what is submitted orally, we [The PAC] will have to satisfy ourselves that that does not conflict with what has been submitted in writing”.

Dr. Strecker highlighted that, amongst other issues, appropriate assessment being left until after the inquiry process eroded public trust in not only the process, but in the governmental departments involved. Why were these issues not being discussed at the “public” inquiry?

Legal Counsel for Fermanagh and Omagh District Council identified that, under the topic of new information, the Council would be submitting detail for the newly proposed Sperrins Action Management Plan, particularly relevant to the Landscape & Visual Impact Sessions.

In response to the matters raised, Commissioner McParland concluded that they were “not a matter of concern”, and Commissioner McKeary took over.

The early questions dealt with the length of proposed operation, with conflicting timelines noted within multiple submissions. The 20–25 year timeframe was confirmed as 2 years construction and 23 years operation, with closure and restoration outside this timeframe—raising concerns given past failures.

Says everything !
Day Three

Unfair Advantage and a Shifting Application

Day Three update from the inquiry, and discussions around “unfair advantages” took on a more central and nuanced role in proceedings.

The day began with a continuation on the topic of illegal/unauthorised landfill on the Camcosy Road site, failings in planning monitoring and enforcement, including issues around the transfer of planning powers, which coincidentally took place on April Fool’s Day 2015.

Counsel for Fermanagh and Omagh District Council noted how matters surrounding “unfair advantage” and “exceptional circumstances” both lead to a legal bar on the granting of planning permissions, much to the annoyance of the applicant and their representatives.
Mr. Fegan also requested, as expressed at the previous sitting last January, that “The Department for Infrastructure would keep an open mind” on the matters discussed, as the DfI KC was “expressing very strong views” despite supposedly being impartial to proceedings, mindful too that they are the authority who take the PAC recommendation and make an ultimate decision.

A question was posed at the beginning of the day on the actual remit of this inquiry, as it was the public understanding (as detailed in the PAC/WAC correspondence of 5th March 2026) that the PAC have been asked “to conduct Public Local Inquiries to consider representations made in respect of the applications listed above comprising of the ‘Curraghinalt Project’”.

What had been feared going into this process last year and again this time round is that this is less what we are witnessing. Instead, what is happening in actuality is that the applicant, and indeed the Departments, are being permitted to amend their application to, in inverted commas, make it more palatable.

Thanks again to all who attended and spoke out. It is truly appreciated.

So far, a number of noted changes have been made verbally in a forum with no official or publicly accessible records, including:

  • The change from Nova Scotia as a destination to an example of a destination for final processing
  • The removal of cyanide from the proposal, despite it being included in the papers before the public and the commission
  • A number of agreements seemingly being made with a nod and a wink which hardly follow recognised or recommended official procedure

The culmination of all this does little to enhance public confidence in the manner in which the inquiry is being carried out, or in the actions of the Departments in protecting our health, environment and future.

Discussion moved onto the Precautionary Approach, and how the proposed project fails the three associated legal tests—another clear and obvious reason why it should be rejected, and one that raised serious concerns about how it had managed to get this far along the planning permission process.

Key aspects and missing elements of Habitats Regulations Assessments (HRAs) were discussed, including that the responsibility lies with the developer or project proposer to prove that a plan or project will not be harmful to the environment (Burden of Proof), and that precautionary measures must be preventative rather than compensatory, undermining arguments about mitigation.

There was further debate on turbary rights and notifications for both Dalradian and the Departments, as well as questions on whether the Crown Estate had been notified. The session moved onto Human Rights and concluded with concerns raised by local people about perceived conflicts of interest working to facilitate Dalradian, which the commissioners took note of ahead of relaying further judgment.

Huge thanks to everyone who took time out of their schedules to attend, assist or speak out it is invaluable to both our community and to the inquiry process.

Some of out experts
Day Two

Process Concerns as New Information Is Accepted

Day Two of the Inquiry began with the highly questionable decision to proceed with accepting a huge volume of new information submitted outside the previously referenced “confines of the public inquiry procedure as set out by the Commission”.

This “flexibility” in terms of what is or was deemed permissible from the applicant played out as a recurring theme throughout the day. This included failures of planning authorities to monitor and enforce standard planning practice, failures of Departments to follow normal procedure when dealing with incomplete, missing or amended applications, and changes to the Dalradian planning application which had not been included in any submitted documentation but were noted and accepted verbally at a sitting with no public record.

There was continued confusion on transboundary matters from participation to monitoring and enforcement roles—alongside project splitting and what appeared to be gaming of the planning system, all of which has been facilitated to date by the regulatory authorities.

From missing detail on what specific materials are to be used underground, to missing feasibility studies, to claims and counterclaims about the use and location of cyanide processing within amended or future applications, as well as behind closed doors working, failures of the Department for Infrastructure to review more than a NonTechnical Document, and historic failures relating to illegal infill and missing planning detail, this was another eyeopening day for those present.

Questions remain on the cyanide issue, with warnings that it could be more local than the Nova Scotia “example” in Dalradian’s planning submission from Cavanacaw to Mountfield  raising further concern.

Thanks again to all who attended and spoke out. It is truly appreciated.

Day 1 before the group go in
Day One

Inquiry Resumes Amid Transparency and Access Concerns

Day One of the reconvened inquiry began with what may as well dispense with the “public” title. As was repeated to those present, this process is solely for those who can take the time to attend in person; there is no remote provision and no publicly accessible record kept.

Confirmation was awaited the following morning as to whether the inquiry would proceed or again face suspension due to further fallout from the Transboundary Consultation which led to its previous suspension.

When it was decided that the inquiry would continue, a number of key points were raised relating to potential breaches of the Aarhus and Espoo Conventions, as well as repeated failings by both the Department for Infrastructure and Northern Ireland Environment Agency.

The absence of an economic feasibility plan and a planning application which Fermanagh and Omagh District Council “would not accept” due to outdated or incomplete information were also highlighted.

Another day which served to underline how committed and wellinformed the local community are, and how they continue to be failed by Government Departments and statutory agencies tasked with protecting health, environment and the future.

Huge thanks to all those who attended, and special thanks to those who spoke out.

This is where we live now